LOTO Permit Status
 
Permit Number
Date Created
Date Needed
RI
Company Name
Project Name
Building
Scope of Work
Comments
 
On hold by RI  (7 LOTO Permit Applications) 
LP-2940 09-08-2017 05:01 PM 09-14-2017   Total Environmental & Power Systems, Inc: (TEPS) B. 68/82 Fuel Tanks Replacement 68 Subcontractor to demo existing electrical conduit and add new circuit breakers for the new Fuel Tank and the Fuel Station.  
LP-2826 05-08-2017 11:40 AM 05-09-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Install conduit into junction box for low voltage control wiring on new cooling tower.  Junction box also contains 120v for solenoid operation.  
LP-2744 11-22-2016 07:05 AM 11-23-2016   PDE B100 EL1D-25/27 Reconfiguration 100 Replace existing single pole 20 amp breakers with new two pole breaker and pull new wire properly sized for circuit rating.  
LP-2658 09-09-2016 10:59 AM 09-13-2016 Tully, John   B77 Skid Controls B77 Skid Replace transformers in control panel with new in their own enclosures within the control panel  
LP-2307 09-01-2015 01:57 PM 09-01-2015 magstadt, michael Nationwide Power   50A Routine inspection, testing, preventive maintenance of the 60KVA Eaton 93E Uninterruptible Power Supply (UPS), including Extended Battery Cabinet (EBC) and battery replacement.  
LP-1971 05-20-2015 01:11 PM 05-20-2015 Johnson, Katherine Infrequent Subcontractor     Make this to the point.  Additional info can be written below.

This should describe the area that work will be performed based off the isolations locked out.

If the work is such that it will take place in separate phases (i.e. shut off valves to add new valves and then LOTO out the new valves) and the LOTO Safe Zone will shift, then a new Permit must be prepared for each planned shift.
 
LP-1956 05-13-2015 03:08 PM   Perkins, Kat          
Reviewed by Facilities  (1 LOTO Permit Application)  
LP-2889 08-02-2017 08:59 AM 08-11-2017 White, Ian Rudolph & Sletten (R&S) IGB 91 Drain the line from HY12
Cut domestic water main in the street
Install tee and valve for IGB utility service
[AUG-04-17 Doug Burkhardt] Approved per MCD

[SEP-20-17 Katherine Johnson] Un-approve to allow for corrections.

[SEP-20-17 Doug Burkhardt] Approved per MCD.
Reviewed by EHS  (18 LOTO Permit Applications) 
LP-2949 09-11-2017 02:27 PM 09-14-2017 Huebschle, Mark CAL NEVA 77A HVAC upgrade 77A Work from scissor lift between crane rails [SEP-11-17 James Murphy] Need equipment name in description.
LP-2948 09-11-2017 02:23 PM 09-14-2017 Huebschle, Mark CAL NEVA 77A HVAC upgrade 77A Work from scissor lift between crane rails [SEP-11-17 James Murphy] Need equipment name in description.

[SEP-12-17 James Murphy] Isolation descriptor does not match Areas Affected or Equipment Name

[SEP-14-17 Mark Huebschle] Panel schedule changed
LP-2947 09-11-2017 02:15 PM   Huebschle, Mark CAL NEVA 77A HVAC upgrade 77A Work off of a scissor lift between the crane rails [SEP-11-17 James Murphy] Need equipment name in description

[SEP-12-17 James Murphy] Isolation descriptor does not match Areas Affected or Equipment Name

[SEP-13-17 Katherine Johnson] CB 40 controls CR-001-77A according to the panel schedule. 

[SEP-14-17 Mark Huebschle] Panel schedule changed
LP-2946 09-11-2017 01:28 PM 09-15-2017 farrell, randy XL Construction Heat exchanger and pumps 59 LOTO brkr in prep for EVAP  
LP-2945 09-11-2017 01:23 PM 09-15-2017 farrell, randy XL Construction Heat exchanger and pumps 59 LOTO brkr in prep for EVAP  
LP-2944 09-11-2017 01:20 PM 09-15-2017 farrell, randy XL Construction Heat exchanger and pumps 59 LOTO new brkr in prep for EVAP  
LP-2943 09-11-2017 10:23 AM 09-15-2017 farrell, randy XL Construction Heat exchanger and pumps 59 Loto valves CWR 1-066 and CWR 1-067 to remove blank flanges, weld in temp valves reinstall blank flanges with new drain valves [SEP-11-17 Doug Burkhardt] Approved per MCD
LP-2942 09-10-2017 10:51 AM 09-20-2017 Samatua, Tipasa Total Environmental & Power Systems, Inc: (TEPS) B. 82 Fuel Tank Replacement 82 Subcontractor to install/provide new power to the new Fuel Tank and the Remote Fill Station at building 82. [SEP-11-17 James Murphy] This isolation will affect 116A1A40B also B81. On HOLD for Facilities review.

[SEP-19-17 Tipasa Samatua] The building 81 WAA and the Emergency Storage Container Group will be notified with the duration of the shutdown. Approximately 2 hours down time before we schedule the work.
LP-2941 09-08-2017 05:12 PM 09-14-2017 Samatua, Tipasa Total Environmental & Power Systems, Inc: (TEPS) B. 68/82 Fuel Tank Replacement 68 Subcontractor to remove electrical conduits and J-boxes and install a new circuit breaker for an new Remote Fill Station at building 68. [SEP-11-17 Doug Burkhardt] Isolation does not match panel schedules and SLD.

[SEP-13-17 Tipasa Samatua] What are you doing to correct this? Please advise. 

[SEP-18-17 Tipasa Samatua] It is my preference as a Construction Manager to perform the LOTO at panel 217A2A1A C/B 9 from building 75-120. and not the disconnect switch for the XFMR (Bank 408 disconnect).
LP-2922 08-21-2017 09:52 AM 08-21-2017 Kovacic, Michael Infrequent Subcontractor Electron Microscope. 67 Rebuilding the FEG TANK. [AUG-21-17 Katherine Johnson] Approval of Permit should have been performed by acting AHJ.
LP-2896 08-09-2017 07:07 AM 08-24-2017 farrell, randy XL Construction Heat exchanger and pumps 59 Loto valves to isolate water to small part of 30" manifold [AUG-11-17 Doug Burkhardt] Approved per MCD.

[AUG-24-17 Katherine Johnson] Need contractor info.

[SEP-06-17 Katherine Johnson] Done

[SEP-11-17 James Murphy] Electrical Isolations added after Approval
LP-2893 08-04-2017 01:48 PM 08-31-2017 farrell, randy XL Construction Hxp 59 LOTO panel 596A1A8A to install new breaker, bus kit, feeeders and conduit. Do torques, meg and inspection. [AUG-24-17 Katherine Johnson] Need contractor info.

[SEP-06-17 Katherine Johnson] Done
LP-2892 08-04-2017 01:43 PM 08-31-2017 farrell, randy XL Construction Hxp 59 Loto panel 596A1A5A and istall breaker, bus kit, feeders and conduit into panel. torque, meg and inspect. [AUG-24-17 Katherine Johnson] Need contractor info.

[SEP-06-17 Katherine Johnson] Done
LP-2877 07-07-2017 12:51 PM 07-14-2017 farrell, randy PDE EPO phase 2 59 Loto exposed circuits while working on EPO junction box [JUL-07-17 Doug Burkhardt] The panelboard names for the isolation points do not match the panel schedules or the single line diagram.
Arc Flash data is missing.

[JUL-31-17 randy farrell]         Panel No.:    U592A
Bldg. No.:    59
Location :    1st Level North Electrical Room
                FSD COMP LVL   
A    20    20   
       
This is from LBL data base. Do you have different numbers?
   

[JUL-31-17 randy farrell] Panel No.:    E594A
Bldg. No.:    59
Location :    1st Level South Electrical Room

        Used for: / Room #        Trip&    Ckt
                Frame    #
        SHUNT TRIP POWER           
1        TO EPO        20    1
This is also copied from Maximo. what am I doing wrong ?
LP-2850 06-13-2017 02:28 PM 06-14-2017 Johnson, Katherine Infrequent Subcontractor 70A Autoclave 70A Inspect wiring and change out a set of wires on a water level control board as well as install Water level probes.  

This will be done by the vendor under the direct field supervision of an LBNL QEW1 (or greater).  The QEW will establish an electrically safe work condition before any wiring work is performed.
 
LP-2804 04-14-2017 01:31 PM 04-18-2017 Stanley, Gregory Infrequent Subcontractor Mass Spec UPS Battery Replacement 100 Replace UPS batteries.   
LP-2800 03-23-2017 01:30 PM 03-29-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 After removal of GP-103-37 and GP-104-37, these four tower water valves will remain closed until new pumps and associated piping are installed. [MAR-24-17 Doug Burkhardt] Approved per MCD on 2/24/17
LP-2794 03-07-2017 02:07 PM   Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Close heater circuit 15, LP 2789, to heat motor for future energization.  Leave open circuit  M218A1A-5D temp CT power.  
Approved  (1095 LOTO Permit Applications) 
LP-2956 09-19-2017 05:13 AM 09-19-2017 Bolles, Benjamin W.E. Lyons B37 Generator Replacement 37 Open main breakers on EG 73 37 generator and temporary rental generator so that the contractor can remove the cover off of panel EG73A and take a picture of the main breaker.  
LP-2955 09-18-2017 09:10 AM 09-22-2017 Samatua, Tipasa Crouse Construction B. 83 Renovation 83 Subcontractor to install a new Battery Back up Emergency Light (Bug eye) at the exterior door of building 83 (Loading Doc)  
LP-2954 09-15-2017 11:46 AM 09-15-2017 Bolles, Benjamin W.E. Lyons B37 Generator Replacement 37 Disable EG 73 37 and connect temp generator for fuel tank removal.  
LP-2953 09-14-2017 08:07 AM 09-15-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Demolition of exterior light on roof top of B37.  
LP-2952 09-13-2017 07:36 AM 09-15-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Currently Main Breaker is open on this panel.  Main breaker will be closed to energize three pumps GP 144, GP 145 and GP 146.  Prior to energizing pumps, CT 103 will be locked open for future work on CT 103 VFD.  
LP-2951 09-12-2017 12:56 PM 09-13-2017 rcvelasco@lbl.gov Infrequent Subcontractor TSW-1-55 Transfer Switch Repair 55 Helmuth is going to do repairs to this transfer switch during our 9-16-17 outage.  
LP-2950 09-12-2017 09:34 AM 09-14-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Connect new cooling tower CT 102 tower water piping to new cooling tower CT 103 tower water piping.  Connect supply and return piping to new heat exchanger on roof. [SEP-14-17 Doug Burkhardt] Approved per MCD.
LP-2939 09-08-2017 09:28 AM 09-11-2017 Huebschle, Mark CAL NEVA B90 Heat Pump replacements 90 Install new FPU panel, FPU-006C-90  
LP-2938 09-07-2017 04:35 PM 09-11-2017 Huebschle, Mark Infrequent Subcontractor B50 steam leak repair 50 Secure steam heat boilers for work on steam condensate return piping  
LP-2937 09-07-2017 03:21 PM 09-13-2017 Stanley, Gregory PDE Northen Fit-Up 144 100 Install new circuit breaker in panel L1F, install conduit and run new circuit with a 50 amp receptacle in Room 144.  
LP-2936 09-06-2017 01:46 PM 09-13-2017 rcvelasco@lbl.gov Emerson Reliability Services (Vertiv) SW-A6 Line 1 Maintenance 064C Emerson to perform Electrical 3 Year PM on:
A.  SW-A6 Bus 1 (12KV Breakers, CPT's, PT's, Metering Equipment)
B.   ADF-1-55, Bank 513
C.  GS-3-71, ADF-1-71, ADF-2-90, ADF-3-90, GS-2-71, Bank 
     90, Bank 514
D.  ADF_2-51, ADF-1-51, Bank 512
E. Bank 511
 
LP-2935 09-06-2017 12:33 PM 09-08-2017 rcvelasco@lbl.gov Emerson Reliability Services (Vertiv) SW-A6 Line 1 Maintenance 064C Only Work performed under this LOTO will be ZVV at ground carts as well as hanging of the ground clusters on the ground carts that are listed on the permit.  
LP-2934 09-06-2017 09:47 AM 09-14-2017 Wright, Bill PDE Gas switch replacement 50B parking structure We need to relocate a 120 V GFCI on the wall of Gas Switch GS-1-50B. We need to re-route the 1/2 conduit, box, outlet etc . This wall will be removed . A new fence structure will be installed to protect the new replacement gas switch.  
LP-2933 09-05-2017 08:17 AM 09-05-2017 rcvelasco@lbl.gov Emerson Reliability Services (Vertiv) SW-A6 Bank 511 Maintenance 064C Perform 3 Year Maintenance on Bank 511 Transformer and the Secondary Main Switch gear and Breakers  
LP-2932 08-31-2017 12:39 PM 09-05-2017 Brunkow, Douglas PDE Flexlab PV Panels 90X This permit is for the energization of the MPZs, Ametec, solar panels and associated equipment. [SEP-01-17 Doug Burkhardt] Please bring as-built drawings to Engineering. The isolations do not match the design drawings or the current panel schedules. How is the PV side being LOTO'd?

[SEP-01-17 Douglas Brunkow] PV side is the disconnects on the Inverters.  These disconnects are the DC side of the system.
LP-2931 08-28-2017 11:58 AM 08-03-2017 Huebschle, Mark Crouse Construction 77A HVAC upgrade 77A Relocate a gas valve for new AHU installation  
LP-2930 08-23-2017 03:27 PM 08-07-2017 Brunkow, Douglas Crouse Construction B50B room 1232 Remodel 50B Contractor will be adding additional outlets and removing partitions from the space.  
LP-2929 08-23-2017 03:24 PM 08-28-2017 Brunkow, Douglas Crouse Construction Room 1232 Remodel 50B Contractor will be changing out the existing lights in the room to LED lights  
LP-2928 08-23-2017 01:26 PM 08-24-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Panelboard 218A4A will be locked out at the main until future work is required downstream at three new pumps and one new cooling tower.  No work will occur in 218A4A once this LOTO is established. [AUG-30-17 Katherine Johnson] Approval was obtained by Murphy for final release to RI via phone call .
LP-2927 08-23-2017 12:53 PM 08-24-2017 Bolles, Benjamin W.E. Lyons B2 Temporary Chiller 34 Install new breaker in switchgear 309A at 309A-6.  Install conductors from 309A-6 to cam lock box on exterior of building 34.  
LP-2926 08-23-2017 12:49 PM 08-24-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Install new 100 amp fuses in ADF-2-37 / ADF-3-37.  install new trip unit on 218A main.  Install new trip units on 218A-1 and 218A-2.  Install new circuit breakers 218A-3 and 218A-4.  Install new conductors from 218A-3 and 218A-4 to new panelboards 218A3A and 218A4A.  
LP-2925 08-23-2017 12:31 PM 09-15-2017 farrell, randy PDE Heat exchanger and pumps 59 Install 2 circuits for CW and TW pump heaters.  
LP-2924 08-21-2017 01:58 PM 08-24-2017 Huebschle, Mark CAL NEVA 90 Heat Pump Replacement 90 Disconnect AC-28, pull wiresto allow relocation of conduit, reconnect.  
LP-2923 08-21-2017 10:12 AM 08-23-2017 Bolles, Benjamin W.E. Lyons B2 Temporary Chiller 34 Open circuit breaker 309A6 to support the temporary chiller for the B37 ALS cooling tower project.  Connect cam lock cables to cam lock box from new temporary chiller.  Energize new temporary chiller. [AUG-21-17 Doug Burkhardt] It states you want to LOTO Bank 309 with Circuit 309A-5. This is not possible. Please revisit.

[AUG-22-17 Benjamin Bolles] Corrections completed Ben Bolles.

[AUG-22-17 Katherine Johnson] Where will you be performing zero energy verification? 
LP-2921 08-19-2017 01:45 PM 08-19-2017 rcvelasco@lbl.gov Emerson Reliability Services (Vertiv) SW-A6 Bus 2 maintenance 64C Battery charger maintenance  
LP-2920 08-19-2017 01:41 PM 08-19-2017 rcvelasco@lbl.gov Emerson Reliability Services (Vertiv) SW-A6 Bus 2 maintenance 64C Maintenance on battery chargers in SW-A6 line 2  
LP-2919 08-17-2017 01:39 PM 08-21-2017 Jew, Ernie LBNL LOTO Procedure Dent meter install in panel E594A 59 Install Dent meter, CTs, and associated wiring in panel E594A for the PUE cauculation [AUG-18-17 Doug Burkhardt] Work with Jim Murphy on this. I believe you need to LOTO the start battery as well. This sounds like you are just removing the Call to Start controls, but the genset  can still be started manually.
LP-2918 08-17-2017 07:42 AM 09-05-2017 Samatua, Tipasa Total Environmental & Power Systems, Inc: (TEPS) ESIP Pnl Brd Rpl 77 Subcontractor to replace existing electrical panel boards at building 77 as part of the ESIP Corrective Action program  
LP-2917 08-17-2017 07:26 AM 09-06-2017 Samatua, Tipasa Total Environmental & Power Systems, Inc: (TEPS) ESIP B. 77 Pnl Brd Rpl 77 Subcontractor to replace electrical panel boards 72A1A, 72A1B, 78A, 78B, 78C & 78D as part of the ESIP Corrective Action.  
LP-2916 08-16-2017 09:10 AM 08-24-2017 Samatua, Tipasa Crouse Construction B. 83 Renovation 83 Subcontractor to demo various abandoned conductors and ad new outlets. (Rearranging of panel)  
LP-2915 08-15-2017 09:13 AM 08-18-2017 rcvelasco@lbl.gov Emerson Reliability Services (Vertiv) SW-A6 Line 2 Maintenance 064C Emerson to perform Electrical PM on:
A.  SW-A6 Bus 2 (12KV Breakers, CPT's, PT's, Metering Equipment)
B.   ADF-1-88, ADF-2-88, ADF-3-88, ADF-4-88, Bank 80, Bank 198
C.  GS-1-50A, ADF-1-50A, ADF-1-50B, ADF-2-50B, GS-1-50B, Bank 
     480, Bank 38, Bank 35
D.  GS-3-70, GS-4-70, ADF-1-50, ADF-1-70, ADF-3-70, ADF-2-
     70A, Bank 25, Bank, 30, Bank 70, Bank 31

Pinnacle will be doing the following work under the same LOTO to Cut and isolate conductors at GS-1-50B back into the manhole and splice in T-Bodies and reconnect all cables bypassing the gas switch in preparation of the Gas Switch Replacement
 
LP-2914 08-14-2017 02:09 PM 08-21-2017 Huebschle, Mark Crouse Construction 77A HVAC Upgrade 77A Install, test and commission new chiller controls [SEP-15-17 Katherine Johnson] Un-approved to allow for modifications.
LP-2913 08-14-2017 01:46 PM 08-16-2017 rcvelasco@lbl.gov Emerson Reliability Services (Vertiv) SW-A6 Line 2 Maintenance 064C This LOTO permit is to begin the Isolations and Grounds for the outage on 8-19-17.  
LP-2912 08-14-2017 01:25 PM 08-21-2017 Huebschle, Mark Crouse Construction 77A HVAC Upgrade 77A Install, test and commission new controls [AUG-17-17 Doug Burkhardt] Gas Valves isolation does not match panel schedules. 

[AUG-17-17 Doug Burkhardt] Disregard previous comments.
LP-2911 08-14-2017 12:36 PM 08-21-2017 Huebschle, Mark Crouse Construction 77A HVAC Upgrade 77A Install, test and commission new AHU  
LP-2910 08-14-2017 12:31 PM 08-21-2017 Huebschle, Mark Crouse Construction 77A HVAC Upgrade 77A Install, test and commission new AHU  
LP-2909 08-14-2017 12:24 PM 08-21-2017 Huebschle, Mark Crouse Construction 77A HVAC Upgrade 77A Install, test and commission new pump  
LP-2908 08-14-2017 12:21 PM 08-21-2017 Huebschle, Mark Crouse Construction 77A HVAC Upgrade 77A Install, test and commission new pump  
LP-2907 08-14-2017 12:17 PM 08-21-2017 Huebschle, Mark Crouse Construction 77A HVAC Upgrade 77A Install, test and commission new AHU  
LP-2906 08-14-2017 12:06 PM 08-21-2017 Huebschle, Mark Crouse Construction 77A HVAC Upgrade 77A Install, test and commission new chiller  
LP-2905 08-14-2017 11:39 AM 08-21-2017 Huebschle, Mark Crouse Construction 77A HVAC Upgrade 77A Demo existing circuits to breakers, install new breaker, install new conduits, pull new wire, torque and megger [AUG-17-17 Doug Burkhardt] Note. I changed the isolation point from "D" to "5" and marked up the SLDs to match.

[AUG-17-17 Doug Burkhardt] Disregard Previous Comments.

[AUG-28-17 Katherine Johnson] Will you be using a remote racking mechanism?  Where will zero energy verification be performed?

[AUG-28-17 Mark Huebschle] Remote racking, zero voltage verified at panel 72D   7.7cal/cm^2
LP-2904 08-14-2017 11:38 AM 08-15-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Isolate 12" treated water supply header on 1st floor to install temperature sensor. [AUG-17-17 Doug Burkhardt] Approved per MCD.
LP-2903 08-11-2017 03:14 PM 08-18-2017 Colton, Floyd Stations Move Furniture Cubicles B90 Remove furniture cubicles 1106a, 1106b, 1106c and 1106d so that the floor of RM1106 can be leveled. When leveling work is complete the furniture will be reinstalled.

[AUG-15-17 James Murphy] Bank 539 is a 45kVA transformer therefore no arc flash hazard.
LP-2902 08-11-2017 02:03 PM 08-18-2017 Huebschle, Mark CAL NEVA Bldg. 90 HVAC upgrade 90 Demo AC-24-90 and AC-25-90  
LP-2901 08-11-2017 08:39 AM 08-17-2017 magstadt, michael Infrequent Subcontractor Power Bank 1B Battery Switch out 50B Change out the hot swappable batteries. 

No access to the back of the unit will be authorized unless a ZVV has been performed by a QEW 2.
 
LP-2900 08-11-2017 08:32 AM 08-17-2017 magstadt, michael Infrequent Subcontractor Power Bank 1A Battery Switchout 50B Change out the hot swappable batteries. 

No access to the back of the unit will be authorized unless a ZVV has been performed by a QEW 2.
 
LP-2899 08-10-2017 11:31 AM 08-25-2017 Samatua, Tipasa Total Environmental & Power Systems, Inc: (TEPS) ESIP Sitewide 77 Subcontractor to replace existing Electrical Panel Boards as part of the ESIP sitewide corrective action  
LP-2898 08-10-2017 06:54 AM 08-31-2017 farrell, randy PDE EPO phase 2 59 Install new controller preform start up.  
LP-2897 08-09-2017 11:46 AM 08-10-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Install new 14" pipe riser through existing sump basin between two supply valves. [AUG-10-17 Doug Burkhardt] Approved per MCD.
LP-2895 08-08-2017 07:02 AM 08-21-2017 Samatua, Tipasa Total Environmental & Power Systems, Inc: (TEPS) ESIP Sitewide 77 Subcontractor to replace various (5)  electrical panel boards at building 77 Sheet Metal Shop as part of the Electrical Safety Improvement Project (ESIP) across the laboratory.  
LP-2894 08-08-2017 06:01 AM 08-11-2017 Samatua, Tipasa Crouse Construction B. 83 Renovation 83 Subcontractor (PDE) to change out  an existing breaker to accommodate the new dishwasher.  
LP-2891 08-04-2017 01:31 PM 08-11-2017 Huebschle, Mark Crouse Construction 77A HVAC upgrade 77A Demo of existing AHU's  
LP-2890 08-04-2017 11:16 AM 08-07-2017 Espinoza, Jacob Infrequent Subcontractor Machine start up 77 Perform connections of components within the machine during the startup process followed by a NRTL inspection.   
LP-2888 07-31-2017 01:09 PM 08-04-2017 Bolles, Benjamin W.E. Lyons B37 Controls Upgrade 37 Install new 20amp 120v circuit breaker for control panel e-power.  See LP 2516 for reference. [JUL-31-17 Benjamin Bolles] 
LP-2887 07-31-2017 01:03 PM 08-04-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Isolate 12" treated water return header on 1st floor to install flow meter. [AUG-04-17 Doug Burkhardt] Approved per MCD
LP-2886 07-31-2017 12:54 PM 08-09-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Remove and relocate 20" main water supply header in street over to roof top of B37.  Isolate 20" main supply water under cooling tower; isolate three 14" manifold valves on 2nd floor. [AUG-04-17 Doug Burkhardt] Approved per MCD
LP-2885 07-26-2017 03:58 PM 08-01-2017 Huebschle, Mark Crouse Construction 77A HVAC Upgrade 77A Demo AHU-003-77A  
LP-2884 07-26-2017 03:52 PM 08-01-2017 Huebschle, Mark Crouse Construction 77A HVAC Upgrade 77A Demo AHU-002-77A  
LP-2883 07-26-2017 03:37 PM 08-01-2017 Huebschle, Mark Crouse Construction 77A HVAC Upgrade 77A Demo AHU-001  
LP-2882 07-24-2017 02:58 PM 08-01-2017 Huebschle, Mark CAL NEVA Bldg. 90 HVAC upgrade 90 Replace breakers 3 & 4 in Panel 90A9A  
LP-2881 07-21-2017 06:20 AM 08-04-2017 Samatua, Tipasa Crouse Construction B. 83 Renovation 83 Subcontractor to remove existing Dark Room Light fixtures in room 412 and replace with LED fixtures for the new IT closet. [JUL-31-17 Doug Burkhardt] Arc Flash data is missing.

[JUL-31-17 Tipasa Samatua] Please see photo of ARC flash label attached

[JUL-31-17 Katherine Johnson] Updated to reflect AC and not DC per communication with T.
LP-2880 07-21-2017 06:11 AM 08-09-2017 Samatua, Tipasa Crouse Construction B. 83 Renovation 83 Subcontractor to add circuit breakers and remove abandoned conductors. [AUG-08-17 Doug Burkhardt] Note that panel schedule shows the circuits are out of order.
LP-2879 07-21-2017 06:05 AM 08-03-2017 Samatua, Tipasa Crouse Construction B. 83 Renovation 83 Subcontractor to add new circuit and remove conductors.  
LP-2878 07-16-2017 05:39 PM 07-17-2017 Stanley, Gregory Matrix HG, Inc B400 Chiller Repairs 400 Swapped spare compressor located in circuit #2 for failed compressor in circuit #1.   
LP-2876 07-07-2017 12:26 PM 07-12-2017 Brunkow, Douglas PDE Flexlab PV Panels 90X Contractor will be energizing the AC line service to the MPZs that will be feeding the inverters.   
LP-2875 07-07-2017 10:47 AM 07-11-2017 Stanley, Gregory PDE 307 Lighting Repair 210 Replace failed lighting ballast in Room 307  
LP-2874 07-07-2017 10:40 AM 07-11-2017 Stanley, Gregory PDE Lab 140 Lighting Repair July17 100 Replace ballast in lighting fixture  
LP-2873 07-07-2017 10:30 AM 07-11-2017 Stanley, Gregory PDE 119 Northen Circuit Mod 100 Reconfigure L3 circuits 23/25 and 39/41.  
LP-2872 07-07-2017 08:05 AM 07-10-2017 Jew, Ernie Eaton Electrical UPS Services UPS 2 battery preventive maintenance 59 Perform preventive maintenance on UPS2 batteries in Cabinet #3  
LP-2871 07-07-2017 08:01 AM 07-10-2017 Jew, Ernie Eaton Electrical UPS Services UPS 2 battery preventive maintenance 59 Perform preventive maintenance on UPS2 batteries in Cabinet #2  
LP-2870 07-07-2017 07:56 AM 07-10-2017 Jew, Ernie Eaton Electrical UPS Services UPS 2 battery preventive maintenance 59 Perform preventive maintenance on UPS2 batteries in Cabinet #1  
LP-2869 07-07-2017 07:47 AM 07-10-2017 Jew, Ernie Eaton Electrical UPS Services UPS 1 battery preventive maintenance 59 Perform preventive maintenance on UPS1 batteries in Cabinet # 3  
LP-2868 07-07-2017 07:34 AM 07-10-2017 Jew, Ernie Eaton Electrical UPS Services UPS 1 battery Preventive Maintenance 59 Perform preventive maintenance on UPS1 batteries in Cabinet # 2.  
LP-2867 07-06-2017 02:18 PM 07-10-2017 Jew, Ernie Eaton Electrical UPS Services UPS1 battery preventive maintenance 59 Perform preventative maintenance on UPS1 batteries in Cabinet #1  
LP-2866 07-05-2017 10:14 AM 07-07-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Relocate 14" tower water supply valve TWS 3-203 for new manifold riser piping. [JUL-06-17 Doug Burkhardt] Approved per MCD
LP-2865 07-05-2017 09:58 AM 07-12-2017 Homon, Kevin Infrequent Subcontractor Cubical reconfiguration at 76-0222 076 76-222 (WPC) area will be reconfigured. Will need Electricians to de-energize and re-energized the cube panels.  
LP-2864 06-30-2017 02:31 PM 07-07-2017 Brunkow, Douglas PDE Flexlab Photovoltaic install 90X Installing a new 110 volt outlet on the new rack installed by Solar City.  
LP-2863 06-29-2017 12:32 PM 07-05-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Install new 14" pipe riser through existing sump basin between two supply valves. [JUN-29-17 Doug Burkhardt] Approved per MCD
LP-2862 06-29-2017 12:26 PM 07-05-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Install new 14" pipe riser through existing sump basin between two supply valves. [JUN-29-17 Doug Burkhardt] Approved per MCD
LP-2861 06-28-2017 12:43 PM 06-29-2017 Standridge, Dan Infrequent Subcontractor Sprinkler System Modificaiton 77 Adding a fire protection sprinkler to room 077-142c.  The crane will need to be locked out to avoid movement to workers in addition to the fire sprinkler system.  
LP-2860 06-28-2017 09:48 AM 07-05-2017 Cota, David Infrequent Subcontractor Repair motorized fire door 84 Reset door and replace motor if required  
LP-2859 06-23-2017 02:47 PM 06-30-2017 Huebschle, Mark Crouse Construction Bldg 62 glove box anchoring 62 Glove box in room 150 to be anchored, conduits from panel 67A13C to be LOTO'd prior to drilling the floor.  
LP-2858 06-21-2017 09:10 AM 06-24-2017 Brunkow, Douglas PDE Flexlab PV Panels 90 New electrical meter will need data added to it after it is installed and lotoed.  
LP-2857 06-21-2017 08:52 AM 06-23-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Remove sand filter, motor and pump.  All scheduled for demolition.  
LP-2856 06-20-2017 02:58 PM 06-20-2017 Kemper, Timothy Infrequent Subcontractor IGB Main Water Line 91 Remove blind flange and add new piping and pancake blind flange. [JUN-21-17 Doug Burkhardt] Per Mike Dong: "Please...put the water valve number on the [permit]."

[JUN-21-17 Ian White] Valve number added under isolation point on non electrical isolation spreadsheet

[JUN-23-17 Doug Burkhardt] Approved per MCD
LP-2855 06-20-2017 11:05 AM 06-27-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Turn off VFD, close supply and return valves before and after check valve to replace check valve on 8" piping. [JUN-21-17 Doug Burkhardt] Non-electrical approved by MCD.
LP-2854 06-20-2017 10:45 AM 06-23-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Turn off VFD, close supply and return valves before and after check valve to replace check valve on 8" piping. [JUN-21-17 Doug Burkhardt] Non-electrical approved by MCD.
LP-2853 06-16-2017 04:25 PM 06-19-2017 Huebschle, Mark Infrequent Subcontractor S-Road Water Main 32 Replace 200' section of water main [JUN-20-17 Doug Burkhardt] Approved per MCD
LP-2852 06-15-2017 12:25 PM 06-15-2017 rcvelasco@lbl.gov LBNL LOTO Procedure Investigate Power Outage to 50 Area 70 Investigate cause of power outage to buildings 50  
LP-2851 06-14-2017 01:53 PM 06-14-2017 rcvelasco@lbl.gov LBNL LOTO Procedure Investigate Power Outage to 50/70 Area 64C Investigate cause of power outage to buildings 50, 54, 70, 70A [JUN-14-17 James Murphy] Switch Tag Reviewed by Murphy, not able to up load at this time
LP-2849 06-12-2017 02:30 PM 06-16-2017 rcvelasco@lbl.gov Eaton (Cutler-Hammer) Bldg 15 bus duct repair 15 Inspect bus duct  
LP-2848 06-12-2017 12:14 PM 06-15-2017 Brunkow, Douglas PDE Flexlab PV Panels 90X Contractor will be installing a new 150 amp breaker in panel 659A16A under loto LP-2843.  This loto will lockout the newly installed breaker until the EVAP is approved and the startup can begin.  Will also be used if there are issues found during the startup so that the circuit can be shutdown to correct them. [JUN-28-17 Mark Scott] Arc flash label updated on 6/19/17. Updated LOTO Permit to match. Now <1.2 cal/cm2. MAS 6/28/17
LP-2847 06-12-2017 06:31 AM 06-12-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Demolish hot water riser pipes from t-section on exterior of building valve TW-3-204.  Demolish hot water riser pipes from cross-section on exterior of building valve TW-3-206.  New blind flanges will be placed over valves where riser pipes are removed. [JUN-12-17 Doug Burkhardt] Approved by MCD
LP-2846 06-07-2017 10:49 AM 06-09-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 34 Lock out new breakers for installation of three VFD's 37-VFD-020, 37-VFD-021 and 37-VFD-022 for three motors/pumps 37-GP--144, 37-GP-145 and 37-GP-146 [JUN-08-17 Doug Burkhardt] On hold per BB

[JUN-08-17 Benjamin Bolles] Corrections completed.  BGB
LP-2845 06-06-2017 09:03 AM 06-06-2017 Bolles, Benjamin W.E. Lyons B37 ALS cooling tower replacement 37 Demolition of existing cooling tower fans CT 100 and CT 101.

Demolition of chain hoist circuit, cable and conduit.
 
LP-2844 06-05-2017 11:19 AM 06-15-2017 Brunkow, Douglas PDE Flexlab PV Panels 90X Contractor will be replacing breaker feeding 659A16A and adding CTs for a metering system. [JUN-06-17 Doug Burkhardt] Added circuit info to isolation point.
LP-2843 06-02-2017 03:05 PM 06-14-2017 Brunkow, Douglas PDE Flexlab PV install 90X2 Contractor will be replacing breakers and adding new breakers and associated conduit and wires into panel 659A16A to support the installation of solar panels.  
LP-2842 05-30-2017 12:23 PM 06-01-2017 Bolles, Benjamin W.E. Lyons B37 ALS cooling tower replacement 37 Demolition of existing cooling tower fans and motor heaters CT 100 and CT 101.

Demolition of site lighting, cable and conduit and two outdoor receptacles and chain hoist circuits.
 
LP-2841 05-22-2017 11:41 AM 05-22-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 LOTO supply valves at sump 100 and sump 101 for cut-over of new 14" pvc supply header. [MAY-22-17 Doug Burkhardt] Approved by MCD
LP-2840 05-19-2017 09:40 AM 05-19-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Connect LLC circuit, liquid level controller, to existing thermistor circuit in junction box fed from E231A-15.  
LP-2839 05-18-2017 12:41 PM 05-22-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Isolate motor heater circuits for GP-100-37, GP-101-37 and GP-102-37.  These are currently isolated in a junction box waiting for new pumps. [MAY-18-17 Doug Burkhardt] electrical approved by dAb
non-electrical approved by MCD
LP-2838 05-18-2017 12:36 PM 05-22-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Isolate circuits in a junction box waiting for installation of new motors.  
LP-2837 05-18-2017 08:00 AM 05-22-2017 Stanley, Gregory PDE 407/408 Lighting Mods 400 Modify lighting supply power and install motion sensor that covers JGI Director's office desk.   
LP-2836 05-15-2017 03:33 PM 05-22-2017 Huebschle, Mark PDE 64-147 Two new circuits 64 Panel 129A4A

Use two spare single phase circuits at 25 slot and install new 30A breaker. Furnish and install new conduit to Room 147 and associated new receptacle.
[MAY-18-17 Doug Burkhardt] Please label equipment with the labels Jeffri provided.
LP-2835 05-15-2017 03:29 PM 05-22-2017 Huebschle, Mark PDE 64-147 Two new circuits 64 Replace ckt 30 breaker with a  50 amp breaker in Panel 512A7AD1A4A . Install a new disconnect and receptacle in room 147, associated conduit and conductors.  
LP-2834 05-12-2017 08:30 AM 05-15-2017 rcvelasco@lbl.gov Emerson Reliability Services (Vertiv) Grizzly Line 2 Transformer Test and Repair 036 We will isolate the bank 2 transformer so that Emerson could:
1. Test the line 2 Transformer ( hi-pot)
2. Megger wires from load side of transformer into SW-A1 (Brkr 102)
3. Line 2 Neutral resistor
 
LP-2833 05-11-2017 01:06 PM 05-12-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 34 Adding and removing temporary power to panel 309A3A as needed to support the 37 Cooling Tower Replacement Project.  
LP-2832 05-11-2017 01:01 PM 05-12-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 34 Perform work associated with the energization of the new filtration motor 37-FL-101 per section 3 of the PUROFLUX Start-up Procedure.  
LP-2831 05-11-2017 10:09 AM 05-16-2017 Jew, Ernie Eaton Electrical UPS Services UPS 1 Fan Repair 59 Troubleshoot and Repair Fan Alarm on UPS1  
LP-2830 05-10-2017 09:47 AM 05-10-2017 rcvelasco@lbl.gov LBNL LOTO Procedure Repair TSW-1-62 62 TSW-2-62 will not transfer back to Normal. Halmuth Aukes to troubleshoot and repair.  
LP-2829 05-10-2017 08:26 AM 05-12-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 34 Lock out new breakers for future installation of three VFD's 37-VFD-020, 37-VFD-021 and 37-VFD-022 for three motors/pumps 37-GP--144, 37-GP-145 and 37-GP-146 and Cooling Tower Fan motor 37-CT-103 [MAY-11-17 Doug Burkhardt] Can you coordinate the work with Engineering? The panel schedules do not match this LOTO. Is this all new work?
LP-2828 05-10-2017 06:28 AM 05-12-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Remove GP-100-37, GP-101-37 and GP-102-37.  
LP-2827 05-09-2017 12:14 PM 05-10-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Install new 14" piping that ties into 20" cooling supply header at Cooling Tower Sump 101.  Tie in will not be made to 20" sump at this time and will occur under LP 2817.  New piping will be run from 14" valve TTV 3-37 which will be locked closed under this permit.  
LP-2825 05-05-2017 01:58 PM 05-05-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Remove and replace impeller in GP-102-37. [MAY-05-17 Doug Burkhardt] Non-electrical approved by MCD
LP-2824 05-03-2017 11:00 AM 05-05-2017 Stanley, Gregory PDE Room 122 NextSeq Circuit Mods 100 Work in the raceway down stream from EL5D to install new receptacles and pull wire.  No work will be performed in EL5D.  That work is performed under a separate permit.  
LP-2823 05-03-2017 10:56 AM 05-05-2017 Stanley, Gregory PDE NextSeq Circuit Mods 100 Install new two pole breakers for circuits 17/19 and 35/37.  Wiring accordingly.   
LP-2821 05-02-2017 08:08 AM 05-04-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Remove and replace wafer valve TW 02-37 below sump in room 203.  
LP-2820 05-02-2017 07:47 AM 05-04-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Remove and replace wafer valve TW 01-37 below sump in room 203.  
LP-2819 05-01-2017 01:24 PM 05-04-2017 Brunkow, Douglas Goebel Paving/Grading Old Town 7 Contractor will be flushing a water line that was repaired.  
LP-2818 05-01-2017 08:23 AM 05-01-2017 Cota, David Infrequent Subcontractor B-77 UMF 77 Perform work near the proximity of the crane.  No work will be performed within 42" of the crane rail.  This will be mechanical only. [MAY-01-17 David Cota] I changed the breaker to match the photo i sent in my text.
LP-2817 04-28-2017 12:51 PM 05-02-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Close cooling tower supply valves that supply water to cooling tower 101 sump to tie in new 14" piping. [MAY-01-17 Doug Burkhardt] Per MCD.
LP-2816 04-28-2017 07:07 AM 05-16-2017 Stanley, Gregory Steris Corp PM on B-100 Autoclave Steam Generator 100 Annual Preventative Maintenance Check. Includes blowing down the steam generator; removing and cleaning the conductivity probes; inspecting contactors and measuring insulation resistance.  
LP-2815 04-25-2017 02:17 PM 04-27-2017 Marietta, Peter Infrequent Subcontractor Bldg. 86 Autoclave 86 Replace the pump for the Autoclave under the direct field supervision by a lab authorized QEW.    
LP-2814 04-25-2017 06:46 AM 04-26-2017 Stanley, Gregory PDE April 2017 Lighting Repairs 310 Replace failed dual technology light switch  
LP-2813 04-19-2017 11:07 AM 04-24-2017 Stanley, Gregory PDE April 2017 Lighting Repairs 500 Replace failed lighting ballast  
LP-2812 04-19-2017 11:04 AM 04-24-2017 Stanley, Gregory PDE April 2017 Lighting Repairs 400 Replace failed lighting ballast  
LP-2811 04-19-2017 10:57 AM 04-24-2017 Stanley, Gregory PDE April 2017 Lighting Repairs 400 Replace lighting fixtures within cold room 454.  
LP-2810 04-19-2017 10:51 AM 04-24-2017 Stanley, Gregory PDE April 2017 Lighting Repairs 400 Replace failed lighting ballast in multiple fixtures  
LP-2809 04-19-2017 10:49 AM 04-24-2017 Stanley, Gregory PDE April 2017 Lighting Repairs 400 Replace lighting ballast in multiple fixtures.   
LP-2808 04-19-2017 10:46 AM 04-24-2017 Stanley, Gregory PDE April 2017 Lighting Repairs 310 Replace failed dual technology light switch.  [APR-19-17 Katherine Johnson] Do you have arc flash data for this panel?

[APR-24-17 Katherine Johnson] Panel fed from SVC Panel (arc flash taken from that panel)
LP-2807 04-19-2017 09:55 AM 04-21-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Close the two 14" hot water riser valves in room 203 so contractor can perform maintenance on 14" piping under new cooling tower 102.  
LP-2806 04-17-2017 08:17 AM 04-20-2017 Jew, Ernie Eaton Electrical UPS Services Building 59 Eaton UPS 2 Preventive Maintenance and Fan Replacement 59 Troubleshoot and replacement of fan and scheduled PM of Building 59 UPS 2.  Install new Software Update.  
LP-2805 04-17-2017 07:47 AM 04-20-2017 Jew, Ernie Eaton Electrical UPS Services Building 59 Eaton UPS 1 Preventive Maintenance and Fan Replacement 59 Scheduled PM of Building 59 UPS 1. Install New Software Update.  
LP-2803 04-04-2017 07:59 AM 04-06-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 34 Energization of two VFD's 37-VFD-023 and 37-VFD-024 for two motors/pumps 37-GP--147 and 37-GP-148.  
LP-2802 04-01-2017 11:44 AM 04-03-2017 NARANI, AKASH Infrequent Subcontractor Clean steam generator LOTO for preventative maintenance 978 System will be shut down for preventative maintenance.   
LP-2801 03-30-2017 02:00 PM 03-30-2017 Johnson, Katherine Infrequent Subcontractor Battery Replacement 67 Replace all strings of batteries within the UPS.  
LP-2799 03-17-2017 09:39 AM 03-22-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Remove GP-103-37 and GP-104-37.  [MAR-17-17 Katherine Johnson] Ben, after removal what will E231A-ckt 11 and ckt 9 power?
LP-2798 03-16-2017 02:31 PM 03-22-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Demolish GP-103-37 & GP-104-37 [MAR-16-17 Doug Burkhardt] Scope of work is to demo GP-103  & GP-104, but the isolation point only lockout heaters. Pumps are served by M218A2A. 

[MAR-16-17 Benjamin Bolles] Yes, that will be a separate LOTO 2797 which isn't completed yet.  Might need to re-energize the motor heater circuits since multiple motors are served by these two circuits.

[MAR-17-17 Doug Burkhardt] Then your scope for this LP is incorrect? 

[MAR-17-17 Katherine Johnson] Placed on hold for future work.

[MAR-31-17 Katherine Johnson] TEST
LP-2797 03-16-2017 01:44 PM 03-22-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 After removal of GP-103-37 and GP-104-37, these circuits will remain safed off wires in a can and non-electrical isolations will remain off until new motors get installed. [MAR-17-17 Doug Burkhardt] Again, the scope of work does not cover all of the circuits to the system, ie the heaters. Under what LOTO permit are you demoing the pumps?
LP-2796 03-16-2017 12:54 PM 03-22-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 34 Adding temp power to panel 309A3A to feed two new pumps/motors in B37 2nd floor. [MAR-16-17 Doug Burkhardt] The equipment and isolation points do not make sense. Panel 309A3A is fed by 309A-3, not M309A7A-3K.

Scope is unclear: Are you providing temp power to the panel? From M309A7A?

[MAR-16-17 Benjamin Bolles] Sorry, correction made.
LP-2793 03-06-2017 02:01 PM 03-20-2017 farrell, randy PDE ESNET 100 amp panel 59 LOTO of new panel (installed under LP-2750) to work downstream.  
LP-2792 02-28-2017 05:04 PM 02-01-2017 Huebschle, Mark Goebel Paving/Grading Old Town Demolition 52 Repair hole in water main line.  
LP-2791 02-24-2017 02:42 PM 02-28-2017 Huebschle, Mark Infrequent Subcontractor Water main repair B36,B61 36 Install 12" valve in domestic water main [FEB-27-17 Doug Burkhardt] Approved per MCD

[MAR-06-17 Katherine Johnson] Need to modify.

[MAR-06-17 Doug Burkhardt] Approved per MCD

[JUN-16-17 Katherine Johnson] 6/16: Updated contractor to Ground Level from Goebel.
LP-2790 02-23-2017 09:22 AM 02-23-2017 Jew, Ernie Infrequent Subcontractor Replace control board in Edison Cray cabinet N7-C7-0A/N7-C7-0B 59 Replace a control board in Edison Cray cabinet N7-C7-0A/N7-C7-0B  
LP-2789 02-21-2017 12:29 PM 02-22-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Install new feeders in pull box in room 202 and tie into new VFD on Roof and new cooling tower CT-102. [FEB-22-17 Doug Burkhardt] Isolation point does not make sense. Are you locking out the entire MCC (M218A1A) or just circuit M218A1A-5D for temp power to CT-102? If the later, the equipment descriptor is CT-102 and the isolation point is M218A1A-5D. If the former, the equipment descriptor is M218A1A and the isolation point is 218A-1.

[FEB-28-17 James Murphy] Corrections are made.

[FEB-28-17 James Murphy] Please review changes
LP-2788 02-21-2017 07:42 AM 02-22-2017 Jew, Ernie Nite & Day Power PM on MGE UPS at OSF 943 Perform Preventive Maintenance on MGE 800kVA UPS at OSF [FEB-22-17 Katherine Johnson] Who will be the QEW from Nite & Day?  

[MAR-01-17 Ernie Jew] Ernie Jew will be the QEW performing the ZVV so that the UPS will be electrically safe to work on.
LP-2787 02-16-2017 02:49 PM 02-23-2017 Jew, Ernie Infrequent Subcontractor B-59 Generator maintenance 59 Perform scheduled generator maintenance [FEB-22-17 Katherine Johnson] What company will be doing this work?

[MAR-01-17 Ernie Jew] Bay City Electric Works
LP-2786 02-16-2017 12:44 PM   Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Install three conduits into panel E231A and add one new circuit breaker for E power to telephone panel in room 202.E and connect new conductors to existing circuits 11,15,17 for new cooling tower components (motor heater, VFD components). [FEB-17-17 Doug Burkhardt] Obtain AF from Engineering if not available.

[FEB-17-17 Benjamin Bolles] Corrections completed Ben bolles
LP-2784 02-15-2017 02:18 PM 02-17-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Lock closed valve TW-13-37 and Lock closed valve TW-01-37 to isolate cooling tower 12" riser for modification on exterior of building.  Add new "T" section to riser with new valves. [FEB-16-17 Doug Burkhardt] Reviewed by Mike Dong via email.
LP-2783 02-09-2017 02:13 PM 02-13-2017 Bolles, Benjamin W.E. Lyons B37 ALS cooling Tower Replacement 37 Lock Closed 18" Cooling Tower Supply valve on hot water riser valve # CT 102-A.
Lock Closed 18" Cooling Tower Supply valve on hot water riser valve # CT 102-B.
 
LP-2782 02-08-2017 06:40 AM 02-09-2017 farrell, randy PDE CRT EPO upgrade 59 LOTO power to box containing spare circuit to allow conduit and wire install [FEB-08-17 Doug Burkhardt] Scope of Work is missing
Areas Affected are missing
Panel schedule shows isolation point as a SPARE.

[JUL-07-17 randy farrell] Resolved
LP-2781 02-08-2017 06:26 AM 07-16-2017 farrell, randy PDE CRT EPO upgrade 59 Install conduits to Interface box and spare conduit west wall. [FEB-08-17 Doug Burkhardt] Arc Flash data is missing.

[JUL-07-17 randy farrell] Resolved
LP-2780 02-07-2017 12:29 PM 02-03-2017 rcvelasco@lbl.gov Emerson Reliability Services (Vertiv) 115kV Line 2 Repair 036 Emerson is going to perform maintenance and testing on 115 kV SF6 Breaker 142 as well as MODS 143-2.  These are the only 2 pieces of equipment that will be worked on under this LOTO permit.  
LP-2779 02-07-2017 11:22 AM 02-14-2017 shaw, darrel Infrequent Subcontractor cubical reconfigure 75b reconfigure cubicals [FEB-14-17 James Murphy] Added circuit 405A40A-15 to permit after approved but before work began.
LP-2778 02-01-2017 02:41 PM 02-06-2017 Huebschle, Mark Crouse Construction 50A 1st flr remodel 50A Relocate light switch  
LP-2775 01-26-2017 11:56 AM 01-30-2017 Cota, David Infrequent Subcontractor Building 77 Crane door repair B77 Replace cables that operate the doors. No electrical or exposure to electrical sources is planned.  
LP-2773 01-19-2017 10:22 AM 01-19-2017 Bolles, Benjamin W.E. Lyons B37 Heat Exchangers 37 Replace spool piece on tower water inlet to heat exchanger EX-102-37. [JAN-19-17 Mark Scott] Edited to correct equipment descriptors and specify the scope of work.
LP-2772 01-17-2017 07:54 AM 01-17-2017 Mattson, Bill Emerson Reliability Services (Vertiv) 37 Busway repair 37 Emerson to isolate and repair 480 VAC bus duct on bank 218.
PDE to remove stabs off the backside of Panel 218A-3/4 for future work.
PDE to investigate heater circuits inside M218A1A, M218A2A.
 
LP-2771 01-16-2017 05:17 PM 01-16-2017 rcvelasco@lbl.gov Emerson Reliability Services (Vertiv) B15 Busway repair 37 Connect temporary cables from XFM 546 to 546A.
 
LP-2770 01-15-2017 02:12 AM 01-15-2017 Mattson, Bill Emerson Reliability Services (Vertiv) Repair Electrical Equipment at B15, 34 & 37 15,34,37 Repair ADF-1-34 Closing mechanism
Repair Bank 218 Bus Duct
Repair Bank 546 Bus Duct
 
LP-2769 01-15-2017 12:31 AM 01-15-2017 Mattson, Bill Emerson Reliability Services (Vertiv) B15 Busway repair 37 Disconnect and repair Bus Duct and reconnect.  
LP-2768 01-15-2017 12:20 AM 01-15-2017 Mattson, Bill Emerson Reliability Services (Vertiv) 37 Busway repair 37 Disconnect and repair Bus Duct and reconnect.  
LP-2767 01-14-2017 11:57 PM 01-14-2017 Mattson, Bill Emerson Reliability Services (Vertiv) B15 & 37 Busway repair 15 & 37 Disconnect and repair Bus Duct and reconnect.  
LP-2766 01-10-2017 03:06 PM 01-12-2017 Bolles, Benjamin W.E. Lyons 37 Cooling tower replacement 37 Demolish GP-134-37 and GP-135-37  
LP-2765 01-10-2017 02:29 PM 01-14-2017 Mattson, Bill Emerson Reliability Services (Vertiv) SW-A4 Bus 1 maintenance 35 ERS to perform maintenance on Battery Charger B (35 BC002) [JAN-12-17 Doug Burkhardt] Isolation point is incorrect. Panel schedule shows circuit #1 is the battery charger which I believe you are trying to LOTO, not the entire panel.

[JAN-12-17 Bill Mattson] (JAN-12-17 Bill Mattson) Corrections completed per comments made by Douglas Burkhardt.
LP-2764 01-10-2017 11:45 AM 01-14-2017 Mattson, Bill Emerson Reliability Services (Vertiv) SW-A4 Bus 1 maintenance 35 Emerson to perform inspection and adjustments as needed on Battery Charger 1 (35 BC001) [JAN-12-17 Doug Burkhardt] Equipment descriptor shows you are shutting down the entire panel. I updated it to Charger #1
LP-2763 01-06-2017 05:35 PM 01-06-2017 Bolles, Benjamin W.E. Lyons 37 Cooling Tower replacement 37 Replace 6 heat Exchangers [JAN-06-17 James Murphy] Approved due to multiple changes
LP-2762 01-05-2017 01:50 PM 01-13-2017 Samatua, Tipasa Crouse Construction B. 15-236/260 Office Renovation 15 Subcontractor to tie new office cubicle electrical feeds. [JAN-06-17 Doug Burkhardt] Arc Flash data missing from isolation points.

[JAN-06-17 Tipasa Samatua] Correction made. 1/6/17. TS

[JAN-06-17 Katherine Johnson] T, your arc flash still is not right.  What are the cal/cm2?

[JAN-09-17 Tipasa Samatua] Correction made 1/9/17 0.1 calories
LP-2761 01-03-2017 02:28 PM 01-06-2017 Bolles, Benjamin W.E. Lyons 37 Cooling tower replacement 37 Demolish GP-134-37 & GP-135-37 [JAN-04-17 Doug Burkhardt] Confirm with Facilities Mech Engineering that it is acceptable to turn off the heaters to BL-101, GP-104, GP-132, GP-131, GP-136,GP-137 and KC-100
LP-2760 12-22-2016 02:39 PM 01-04-2017 Bolles, Benjamin W.E. Lyons 37 Cooling Tower replacement 37 Replace 6 heat ex-changers [JAN-03-17 Doug Burkhardt] Electrical Isolation #13 does not match panel schedule. Schedule shows GP-111-37, not GP-120.
LP-2759 12-19-2016 10:53 AM 01-30-2017 Bashaw, Douglas Infrequent Subcontractor ALS SRRF Upgrade Phase 3B 6 Retrofitting circulator #1, this involves replacing water connectors, thermal sensors, and connector panels and then calibration.
[DEC-19-16 Jeff Troutman] Vendor has taken EHS0379 Subcontractor LOTO Orientation
LP-2758 12-16-2016 09:04 AM 12-23-2016 White, Ian PDE B78 Lighting Controls Upgrade 78 Retrofit cubicle power with Title 24 controls. [DEC-19-16 Doug Burkhardt] - Isolation points do not match panel schedules. List out each circuit individually. 
- Arc Flash data is missing.
LP-2757 12-15-2016 02:58 PM 12-19-2016 Cota, David Infrequent Subcontractor B54 Kitchen clean B54 Grill hood and duct cleaning.  
LP-2755 12-14-2016 03:05 PM 12-16-2016 Cota, David Infrequent Subcontractor B54 Kitchen clean 54 Clean the stove and hood  
Result Pages:  1  2  3  4  5  6    
Report Name *
Description
Field label
Column heading override
Justification
What does auto mean?
Fields in:

Fields to Extract:

Name for the new table:
Items in the new table are called:

When you bring additional fields into a conversion, Quick Base often finds inconsistencies. For example, say you're converting your Companies column into its own table. One company, Acme Corporation, has offices in New York, Dallas and Portland. So, when you add the City column to the conversion, Quick Base finds three different locations for Acme. A single value in the column you're converting can only match one value in any additional field. Quick Base needs you to clean up the extra cities before it can create your new table. To do so, you have one of two choices:

  • If you want to create three separate Acme records (Acme-New York, Acme-Dallas and Acme-Portland) click the Conform link at the top of the column.
  • If the dissimilar entries are mistakes (say Acme only has one office in New York and the other locations are data-entry errors) go back into your table and correct the inconsistencies—in this case, changing all locations to New York. Then try the conversion again.

Read more about converting a column into a table.

Show fields from Show fields from Show fields from a related table

We're glad you're interested in doing more with Quick Base!

Now we need to make you official before you share apps or manage your account.

Verifying your email lets you share Quick Base with others in your company.

Your work email
Your company