LP-4800 11-21-2022   Benz, Michael IPS B77 - 170 & 108 Equipment Move 77 Cut and Cap Gas line in B77-108' No isolation valve needs to be LOTO at main and purged before work can start. [NOV-18-22 Teilhard Valladares] Is there a purge plan in place for this work?
LP-4786 01-09-2023   Nunes, Norberto Groundlevel Construction ALS LN2 Tank Replacement Project 006 The contractor will install vacuum jacketed piping up stream and down stream of the vaporizer being LOTO'd.  There will be a pressure test of the system once installation is complete.  
LP-4785 01-09-2023 HEC 1 (480V 1) Nunes, Norberto Groundlevel Construction ALS Booster Pit Equipment Pad 006 Ground Level Construction to remove previously installed wooden platform over a section of conductors fed from SWBD302A CKT4 and SWBD303A CKT2  
LP-4773 11-07-2022   Gleason, David Groundlevel Construction Black Start (PSPS) 64C Removal and determination of DLO/Generator cabling at Bank 772 Low Side of the XFMR and at Gen1 generator termination buss  
LP-4772 11-07-2022   Gleason, David Groundlevel Construction Black Start (PSPS) 64C Removal and determination of DLO/Generator cabling at Bank 772 Low Side of the XFMR and at Gen1 generator termination buss [NOV-02-22 Jeff Hendrick] deleted stored energy dissipation device #1
LP-4763 11-04-2022   Nakaki, Lindsay Crouse Construction B54 Kitchen Equip Clear Out B54 - Contractor to disconnect handicap/ADA lift
- Contractor to remove handicap/ADA lift
- Contractor to terminate wiring at adjacent junction box
 
LP-4751 10-13-2022 HEC 1 (480V 1) Keusch, Justen California Boiler Works Boiler Maintenance B85    
LP-4750 10-13-2022 HEC 2 (480V 2) Keusch, Justen California Boiler Works Boiler Repair 85    
LP-4748 11-24-2022   Benz, Michael Groundlevel Construction B34 Chiller Upgrade Project 34 Demo 34ARU005 back to breaker M309A7A-4J and spare out breaker.  
LP-4746 11-03-2022   Brunkow, Douglas Goebel Paving/Grading Od Town Phase 6 On Segree Road Contractor will be removing the blank cover from an existing box and installing a replacement street light to replace the once that was removed.  Like in kind replacement.  
LP-4745 10-05-2022   Cereno, Fred Crouse Construction B50B Boiler flue Replacement 50B To finalize and complete work on the new flue control panel and new flue dampers. Circuit#3 and Circuit#10. (Ref. LP-4667). [OCT-06-22 mark liljefelt] Please attach supporting documents: single line outlining your LOTO safe zone or a panel schedule if a single line is not available.
LP-4709 09-27-2022   Benz, Michael IPS B77 - 161 Metrology Project 77 1.    Replacing (E) flow meter w/ (N) Mag Flow sensor FT-1 at the (E) Chiller Plant area per sheet note 2/M4.1. 
2.    (N) In-Line flow meter FT-3 per sheet note 4/M4.1.
3.    (N) insertion Pipe Sensor Well (2) for the Flow Meter and (2) for ALC Controls & Monitoring. Total = 4 per sheet note 5/M4.1.
4.    The a (N) Insertion Type Flow Meter on the new Piping FT-2 per sheet note 9/M4.1.
5.    Replace Tower Water Temp Sensors Qty.2 per 1/M5.3. 
6.    Replace Chilled Plant Controllers 
[SEP-16-22 Teilhard Valladares] Please provide drawings where sensors and valves will be installed.

[OCT-06-22 Teilhard Valladares] Please confirm if permit is needed.
LP-4705 09-30-2022 HEC 1 (480V 1) Bolles, Benjamin Infrequent Subcontractor Conveyor repair/replace bands 069 Remove and Replace (140+) ‘O’ rings on conveyor belt
 Remove and Replace (1) Cutler Hammer Photoeye
 Remove and Replace (4) Photoelectric Sensor
 Install Pop Up Transfer Strip
      o 28”BF Strip W/7 Holes on 4.25” C/L’s 1” TAB
Mounting Hardware
PBT-1 Installed in Strip
 Plastic Tee
Filter Regulator Lubricator
Install Porter-Cable 6GAL Pancake Air Compressor
Air Components: Connectors, Tubes, Fittings
& O-Rings (Special; High Elasticity)
[SEP-08-22 mark liljefelt] Field verified scope. Attached supporting documents.

Reviewing with RI 

[SEP-08-22 mark liljefelt] 
FAC records for panel schedule matches field and LOTO Isolation Checklist.

LP-4632 06-13-2022 HEC 1 (480V 1) Patterson, Michael Crouse Construction B70A Abergel B70A Add Emergency Lights due to fire inspection failure on the brightness of the designed emergency lighting.  [JUN-08-22 Michael Patterson] This is a duplicate of LP 4488

[JUN-08-22 Michael Patterson] Circuit 5 was removed from this LP, compared to 4488

[JUN-09-22 mark liljefelt] See step #4 in mandatory special instructions. Should reference to  LP-4488 be removed & replaced?

[JUN-09-22 Michael Patterson] Sorry Mark, missed that one corrected

\
LP-4501 01-25-2022           TEST  
On hold by RI  (33 LOTO Permit Application records) 
LP-4803 01-14-2023   Hendrick, Jeff Electrical Reliability Services (Vertiv) SW-A6 3 year Maintenance Part 1 88 Vertiv to perform 3 Year Electrical PM on:

A: 88-AD-001, 88-ADF-002, 88-ADF-003, and 88-ADF-004
B: Banks 80 and 198
C. Switchgear 80A and 198 including Breakers, CPT's, PT's, and Metering Equipment.
 
LP-4802 11-27-2022   Kemper, Tim Therma Corp B59 Misc. Piping B59    
LP-4801 12-05-2022   Kemper, Tim Therma Corp B59 Misc. Piping B59    
LP-4799 11-27-2022              
LP-4798 11-27-2022              
LP-4787 01-09-2023   Nunes, Norberto Groundlevel Construction ALS LN2 Tank Replacement Project 006 The contractor will replace Vacuum Jacketed (VJ) Piping from the LN2 tank to the vaporizer as well as to the plumbing cluster.  See attachment for MOP and pipe diagram.
There is a separate LOTO permit (LP- 4786) to lock out  the LN2 vaporizer that is in series with the VJ piping.
 
LP-4777 11-11-2022   Grounds, Jeffrey Cray Computers N9 Upgrade 59 Install computer cabinet with 3 power feeds to it. Make electrical connections.  

3 circuit breakers will feed receptacles under the floor and the pigtails feed the cabinet power.  The breakers will be locked out so that new pigtails are not plugged in to an energized receptacle during installation.
 
LP-4776 11-11-2022   Grounds, Jeffrey Cray Computers N9 Upgrade 59 Install computer cabinet with 3 power feeds to it. Make electrical connections.  

3 circuit breakers will feed receptacles under the floor and the pigtails feed the cabinet power.  The breakers will be locked out so that new pigtails are not plugged in to an energized receptacle during installation.
 
LP-4774 11-09-2022   Spier, William Michael Groundlevel Construction B62b Electrical Upgrade 62b Add new transformer, panel, circuit breakers, receptacles to IT computer rack inside Building 62B.  
Includes Pad extension to existing pad, conduits across driveway, new transformer located on the pad extension with adjacent exterior circuit panel.
Complete EVAP# 2   Mega Test, Breakers, Conductors, Torque Verification of breaker connections to panel, conductor connections to breakers. 
Remove LOTO
Energize & Check phase rotation at connection to new circuit panel. 
Energize new electrical equipment served by Breaker 2FR in Panel # EM66A9A1A
Energize New branch Circuits one at a time.


 
LP-4764 11-02-2022   Reynolds, Ben CAL NEVA 133/137 CXRO 02 Once under LOTO, the contractor will install two new exit signs in room 133 connecting them to the existing lighting circuit.  LOTO will be released upon completion of the work.  
LP-4678 08-10-2022 HEC 1 (480V 1) Reynolds, Ben Electrical Reliability Services (Vertiv) B74F Soil Test Beds Electrical Power Source B74F The intention once under LOTO will be identifying a source of electrical power for two new soil test beds that will be installed in B74F. A total of sixteen 120V receptacles (eight receptacles per test bed) have been requested. The electrical scope of work to support the new soil test beds is as follows.
*PLEASE NOTE*  The isolation points will need to be identified to allow Vertiv to NETA test the existing breakers.

1. Test existing panelboard 464A13A in B74F in accordance with NETA Maintenance Testing
Specifications for Electrical Power Equipment & Systems (NETA MTS). If NETA MTS test results
are satisfactory, the panelboard may be used to supply the new soil test bed circuits. If the test
results are not satisfactory, the panelboard will need to be replaced. Testing shall include all
tests identified in NETA MTS for panelboards, except for those tests defined as optional.

[JUL-29-22 mark liljefelt] Field verified scope. PNL464A13A appears to be non code compliant.  Waiting for PIMD recommendation.
LP-4635 07-11-2022   Wright, Bill CAL NEVA   88 1. Install VFD's....  
LP-4522 02-21-2022   Sears, Chris CAL NEVA B30- Lab Modifications B30 LOTTO out panel 651A1A2A and Main Panel 651A1A circuit 14. New breakers to be installed in Panel 651A1A2A for Hydrogen generator move receptacle. Removing a 3 pole 3phase breaker and replace with a 2 pole 208 20A 2 phase breaker for the Hydrogen generator and 1 single pole 110A breaker for the Mili-Por machine. Current disconnect will be from where we connect Conduit and run to the wall where both pieces of equipment are located in Lab 105. Adding a 2 pole breaker 20A 208 breaker at circuit 1&3 and circuit 24&26 both locations are currently spares. These are for a new piece of equipment that requires 2 20A 208 outlets.  
LP-4518 02-11-2022   Patterson, Michael EERG B79 12 KV re route B79 demo 77 This is an emergency repair to 72H feeders.  We will be replacing 12 splices - 6 in pull box #1 and 6 in pull box #5.  We will also be working in gear 72A replacing the power supply for the third section of the gear  
LP-4517 02-01-2022   Perkins, Kat       TEST  
LP-4514 11-13-2020   Johnson, Katherine       test  
LP-4502 01-26-2022     Acco Engineered Systems adsfasdf asdfasdf asdfasdf  
LP-4478     McAdon, Chris CAL NEVA B62-201 High Bay Equip Installation 62A    
LP-4464                
LP-4432 12-01-2021     4LEAF testing testing testing  
LP-4424 11-30-2021 HEC 4 (high voltage) Brunkow, Douglas Goebel Paving/Grading Old Town Phase 7 B7 pad There are existing cables that run from breaker 2 in switch gear 306 to electrical vault 133 in Segree road where the cables are currently capped.  Contractor needs to enter the 306 switch gear in order to tone the cables from 306 breaker 2 to vault 133.  Once toned and phasing is known, the contractor can splice the new cables to the old cables in vault 133. [NOV-09-21 Jeff Hendrick] added isolations
LP-4408 11-20-2021   Benz, Michael IPS B77 - 161 Metrology Project 77 SCOPE OF WORK Defined in attached MOP.  
LP-4402 10-21-2021           test  
LP-4398 10-27-2021 HEC 3 (non-electrical) Benz, Michael IPS B77 - 161 Metrology Project 77 B77-161 Demo HHWS and HHWR lines from equipment AHU 11-77 and cap. [OCT-21-21 Teilhard Valladares] Performed job walk with RI on 10/19.

[OCT-26-21 Teilhard Valladares] Created work order W0265429 to verify HHWS/R valves will hold close. If valves does not hold building shutdown of the HHW might be needed.

[OCT-26-21 Teilhard Valladares] Removed previously attached drawings to prevent confusion. Different rooms and systems were in the drawings.
LP-4268 07-26-2021   Huddleston, Ralph Crouse Construction B54 Equipment Removal B54 Crouse to remove almost all of the existing Kitchen Equipment in the Cafeteria.  There will be several ZVV at the time of the execution of the LOTO.  Equipment will be disconnected and removed.  Electrical wiring will be safely capped off in a covered box.  Water will be capped off as well.  [JUL-20-21 Doug Burkhardt] Sent to U&M

[JUL-23-21 mark liljefelt] Walked scope with Alternate RI Rey Espino & ESO Dan Williams on 07/23.
Need additional information before approvals: project docs, equipment lists, accounting for egress lighting, FA, EMCS, Network switch, seismograph station, ETC

[AUG-03-21 Michael Patterson] Attached are the Project Docs, which is the same as the equipment list according to the PM.  There is no Server in the build that a shut down would affect any other building.  Fire will be contacted once the LP has been scheduled, the fire alarm id in an outside closet and can be fed by a small generator.  

[OCT-06-21 Ralph Huddleston] The building is vacant.  There is no need for emergency lighting.  The FAC is powered by 446A4A #29.  The battery back up should last for the day, but the alarm will be put into test mode.  There is a new schedule of equipment attached.
LP-4265 10-20-2021   Perkins, Kat          
LP-4264 12-17-2021   Perkins, Kat          
LP-4260 08-02-2021     Star Energy Management B74 Interior Lighting Upgrades B74 Remove existing fixtures, install new fixtures  
LP-4098 03-09-2021   Hendrick, Jeff Electrical Reliability Services (Vertiv) SW-A1 Line 1- 3 Year PM 036A Vertiv to perform 3 year Electrical PM on: 
SW-A1 &2 Battery Charger 2
 
LP-4097 03-09-2021   Hendrick, Jeff Electrical Reliability Services (Vertiv) SW-A1 Line 1- 3 Year PM 036A Vertiv to perform 3 year Electrical PM on: 
SW-A1 &2 Battery Charger 1
 
LP-4041 12-31-2020   Huebschle, Mark LBNL LOTO Procedure ALS AHU Replacement 6 This Permit will de-energize the Control Circuit within the equipment so that testing may proceed. HV Cables are under LOTO (LP4005)
Disconnect and secure HV Cables on elect. pad
High Pot test high voltage cables
Land cables on both ends
[DEC-23-20 Doug Burkhardt] Sent to MRO
LP-3829 08-25-2020   Chang, Shawn Cascade Thermal Solutions ABPDU Autoclave shutoff 978 PM service on autoclave  
LP-1971 05-20-2020   Johnson, Katherine Infrequent Subcontractor     Make this to the point.  Additional info can be written below.

This should describe the area that work will be performed based off the isolations locked out.

If the work is such that it will take place in separate phases (i.e. shut off valves to add new valves and then LOTO out the new valves) and the LOTO Safe Zone will shift, then a new Permit must be prepared for each planned shift.
 
Corrections Required  (10 LOTO Permit Application records) 
LP-4788 11-30-2022 HEC 3 (mechanical) Samatua, Tipasa Groundlevel Construction B. 2 Sitewide (C.T) Mechanical 2/23/80 Subcontractor to reroute the existing HPCW away from the footing of the new Cooling Tower Foot print. Including cutting and removing section of the pipe. [NOV-17-22 Teilhard Valladares] Performed field walked on 11/17/2022. Will need to locate and verify correct isolation valves. Will engage engineering and create a work order to verify for correct isolations.

[NOV-18-22 Teilhard Valladares] Created work order W0303980 to VM-198 will hold. Waiting for results.
LP-4769 10-31-2022 HEC 2 (480V 2) Benz, Michael IPS B77 - 170 & 108 Equipment Move 77 Disconnect 
Panel 78C Ckt. 9
Panel 78B Ckt. 21
Panel72A1A Ckt. 3
Panel 78C ckt.9
[NOV-01-22 Rance Kilbourn] Walked job with RI. Reviewed job scope, electrical isolations and AF hazard. Requested RI to edit scope to include what will be done after the LOTO is established. Placed on hold until an update can be made to job scope.
LP-4679 08-01-2022 HEC 1 (480V 1) Patterson, Michael Crouse Construction B77 Enclosure B77 Testing and Commissioning of CMS Machine Filtration Equipment. Including voltage and phase rotation verification. 

Phase rotation corrections will be made if necessary

Please see MOP under documents
[JUL-28-22 Michael Patterson] With Permit will only be used if during testing and commissioning we need to open power supply cabinet 

[JUL-28-22 mark liljefelt] Field verified scope.

Attached supporting documents.

FAC records for Arc Flash and panel schedule match field documents

[AUG-04-22 mark liljefelt] HEC needs a response to email sent to RI on 07/28 regarding stored energy in CMS power supply cabinets. There are capacitors located in VFDs within the CMS power supply cabinets
LP-4665 07-13-2022 HEC 2 (480V 2) Patterson, Michael Kone B70 Elevator B70 Install Foam around Cylinder
Patch Concrete 
Install Bumper Rail
Install new Scavenge Pump - Plugs into 120
Anchor rails and springs to the floor
[JUL-12-22 Teilhard Valladares] Added mandatory instructions.

[JUL-12-22 Rance Kilbourn] Reviewed job scope, electrical isolation and field AF label. Confirmed field AF matches FAC Engineering records. Attached photo.

[JUL-12-22 Rance Kilbourn] Per a conversation between myself and the RI (Michael Patterson) regarding the contractor (Kone). Mike asked if Kone would be permitted to perform switching and ZVV for LP-4665. After consulting with my program manager, I discovered only Cliff from KONE has completed QEW 2 training. With this information, only Cliff would be allowed to perform switching. Mr. Patterson, please confirm if you will use Cliff or will require FAC electricians to establish this LOTO permit.

[JUL-20-22 Michael Patterson] Correct, Cliff will do all switching and operation of the cart if we need to get into the controller
LP-4657 06-28-2022   Patterson, Michael Star Energy Management Sitewide Lighting B84 Remove existing exterior lights that are on the North Side of the building 
Install custom Junction Boxes
Install New LED Fixtures
[JUN-27-22 Rance Kilbourn] Walked job and reviewed field AF label and panel schedule. Confirmed both match FAC Engineering records. Added electrical isolations and AF PPE levels.

[JUN-30-22 Teilhard Valladares] RI will need to clarify scope of work so proper isolations can be identified. Corrections are needed in order to proceed with the permit.

[JUL-11-22 Michael Patterson] Can I walk this with HEC, so I can get the isolation points correct - I do not have access to this facility and the contractor is making his last trip here on the 21st
LP-4624 06-16-2022   Spier, William Michael IPS B67 Cluster Tool B67 Install Breakers @ [JUL-29-22 mark liljefelt] Scope of work is not adequate. 

For electrical isolation #1: Isolation point 551A2A  CB9 feeds Bank 557.
 
NOTE that the Equipment Desriptor field describes what equipment will be de-energized by the LOTO Isolation Point

If this LOTO is for de-energizing Bank 557, then your Equipment descriptor should be "Bank 557", not "551A2A".
LP-4327 09-06-2021 HEC 1 (480V 1) Williams, Emma Star Energy Management Exterior Lighting Upgrades B33C (Grizzly Security Kiosk) REmove existing Light fixtures, install new LED light fixtures [AUG-24-21 Doug Burkhardt] Sent to U&M

[SEP-14-21 mark liljefelt] Field verified scope, contacted RI regarding need to verify that this LOTO might impact safety equipment.

RI to open work order for electricians to identify correct circuit for LOTO & possible safety impacts.

[OCT-28-21 mark liljefelt] Waiting for RI response
LP-4288 08-23-2021   Williams, Emma Star Energy Management Exterior Lighting Upgrades B31 Remove existing lighting, install new fixtures [AUG-05-21 Katherine Johnson]  Sent to U&M

[AUG-18-21 Rance Kilbourn] Investigating Isolation #1 feeding panel 72A2A16A7A. It appears no exterior lighting is associated with this circuit. Research ongoing.

[AUG-24-21 Rance Kilbourn] Attached single line drawing with mark-up. Attached panel schedule for 72A2A16A7A. Placed on hold until additional information regarding isolation #1 CKT 7 can be resolved.
LP-4276 08-13-2021   Williams, Emma Star Energy Management Exterior Lighting Upgrades B50 Remove existing fixtures, install new LED fixtures [JUL-28-21 Doug Burkhardt] Sent to U&M

[AUG-11-21 Rance Kilbourn] Panel missing AF label. On hold pending engineering review.

[NOV-22-21 Rance Kilbourn] FAC Engineering advised to utilize the upstream AF label which is above 40 Cal/cm^2 which no known PPE exists to switch by hand.
LP-4266 08-16-2021   Williams, Emma Star Energy Management Exterior Lighting Upgrades B75C Remove existing fixtures, install new fixtures [AUG-05-21 Katherine Johnson]  Sent to U&M

[AUG-13-21 Rance Kilbourn] Added photos of AF label, panel schedule and exterior of panel. Updated isolation PPE level.

[AUG-13-21 Rance Kilbourn] Contacted RI for additional scope for location of lighting. On hold pending update

[AUG-23-21 Emma Williams] Uploaded map showing lights at B75C

[AUG-25-21 Rance Kilbourn] It is unknown if the isolation point will establish a LOTO safe work zone for the job scope listed. Notified RI that an investigation work order may be needed to determine correct isolation point. 
Reviewed by Facilities  (1 LOTO Permit Application)  
LP-4352 11-10-2021 HEC 1 (480V 1) Brunkow, Douglas Goebel Paving/Grading Old Town Phase 6 B7 Once installation work is completed under existing LOTO LP-3717 that is currently in place, this loto will allow for the turning up and the testing of voltage and rotation of the newly installed equipment.  If issues with the new equipment arises from the testing, this loto will also be use to make any corrections needed to fix any issues found through the testing and verification. [NOV-18-21 mark liljefelt] Field verified scope. 

FAC Records for Arc Flash match field Arc Flash label.

Marked up & attached 1-line drawing indicating Isolation Point and LOTO Safe Zone.

The attached MOP requires ESO review and Stamp.
Reviewed by EHS  (1 LOTO Permit Application)  
LP-4618 08-15-2022 HEC 1 (480V 1) Hendrick, Jeff LBNL FA August 2022 East Canyon Shutdown SW-A5 1. LOTO out SWA5 substation, to allow (2) major projects execute cable splices on 12 KV circuits .

2.Child LOTO LP-4634 B79 12 KV re-route project- circuits 52-A109 and 52-A113 splice in new section of re-routed cable along B77.

3. Child LOTO LP-4655 East Canyon gas switch replacement project -  52-A506 and  52-A511 to bypass SF6 gas switches EG-GS-001 and EC-GS-002 by splicing all cables together in EMH-163 

4. The East Canyon contractors are installing (2) 480v gensets to normal power switchgear, to allow (2) buildings to stay energized during the (5) day outage .
These are switchgear 420A at B72 and switchgear 551A at B67. Each of these locations, will have a LOTO on the main breaker to allow genset installation ,but will stay in place during the outage, to prevent back feed. ( LP-4672 bank 551A @B72 and   LP-4673 bank 420 @ B67 )

5. Add to this LOTO (  LP-4618) an isolation at 72-ADF-001 and 67 - ADF-002 to also prevent any back feed from the B72 & B67 genset's.

6 . This East canyon project, is installing multiple portable generators on house generator, as normally done during outages ( See work orders )  This is for information only . This is not scope of this loto 

7)  Child LOTO LP-4690 B62 for deferred maintenance/repairs and swapping out breaker for the feed to b73
 
8) Child LOTO LP-4691for deferred maintenance /repair at bank 215. Scope to include:
A .Vertiv to Perform maintenance on SWGR 215A to include 8 Power Circuit Breakers and 1 x  Power Meter, metering, CPT, PT, and buss of SWGR 215A.

B. Test 4 spare breakers (on floor). Adjust breaker setting. LBNL will provide breaker setting. 

C.  Install Spare breakers at MAIN, Cubicle #2, Cubicle #3, Cubicle #4 

D.  Install QT2 Switch (AC-Pro) at MAIN, Cubicle #2, #3 and #4  door. Connect to the breaker. Test functionality. 

E. Furnish and Install communication RS485 Cable (Shielded twisted pair RS-485 cable, 0.33 mm2 (22 AWG) or larger), from MAIN, Cubicle #2, #3, #4 AC-Pro trip unit to (E) Ion Meter. 

F. Perform maintenance test on ADF-1-66 after cable replacement by LBNL electricians between 66-ADF-001 and Bank 215

G. Facilities electricians to replace jumper cables between 66-ADF-001 and Bank 215.


9) Child LOTO LP-4695 B74  deferred maintenance/repairs by Vertiv and Facilities Electricians for SWGR 47A, Bank 47, and 74-ADF-001

10) Facilities Electricians to Replace UPS in SWGR 550 and SWGR 551

11) Child LOTO LP-4638, B66 VFD upgrade - MCC215A5A Cube 19 wiring upgrade to accommodate new VFD installation
[AUG-10-22 Michael Rose] Added 3 switch tags for establishing LP in stages. Attached single lines showing configurations at each stage. 

[AUG-11-22 Jeff Hendrick] after discussion with Mike Rose deleted Mandatory instruction: make sure B67 /  bank 551 and B 72  bank 420 temp portable gensets are running and powered up, before executing / performing ZVV for this LOTO.

[AUG-11-22 Rance Kilbourn] Reviewed single line drawings and switch tags. Confirmed AF labels match current FAC Engineering records. Updated job scope to include LP-4638 which uses LP-4618 as an electrical isolation.

[AUG-11-22 mark liljefelt] FAC records for Arc Flash match the Isolation Checklist

[AUG-19-22 Michael Rose] Added switch tag to release LOTO. 4618-4
Approved  (2702 LOTO Permit Application records) 
LP-4797 11-27-2022 HEC 3 (mechanical) Kemper, Tim Therma Corp B59 Misc. Piping B59 Install weld-o-lets and 2 flushing valves on Heat Ex-changer #2 at 12" piping on  CWS and CWR  and remove spool piece to camera lines. Then flush system.
See attached drawing for valve location.
[NOV-18-22 Teilhard Valladares] Field walked with requester.

Field verified labels and updated the isolations.

Scope matches isolations. 

[NOV-18-22 Teilhard Valladares] Drawings will need to be updated to match the labels.

[NOV-18-22 Teilhard Valladares] Drawings were removed to prevent confusion.
LP-4796 11-30-2022 HEC 1 (480V 1) espino, rey Crouse Construction Abergel B70A Fire Marshal is requiring more egress lighting in the lab spaces that we have upgraded.  We will need to loto lighting circuits that power the lightings in rooms 2235, 2245, 2253 so we can complete the final connection of the added lights. [NOV-17-22 Rance Kilbourn] Walked job with RI. Discussed job scope, electrical isolations and AF hazard. Confirmed both field AF label and panel schedule match current FAC Engineering records.

[NOV-17-22 mark liljefelt] FAC records for Arc Flash and panel schedule match field AF label and panel schedule.
LP-4795 11-27-2022 HEC 3 (mechanical) Kemper, Tim Therma Corp B59 Misc. Piping B59 Install weld-o-lets and 2 flushing valves on Heat Ex-changer #1 at 12" piping on  CWS and CWR  and remove spool piece to camera lines. Then flush system.
See attached drawing for valve location.
[NOV-18-22 Teilhard Valladares] Field walked with requester.

Field verified labels and updated isolation list.

Attached drawings will need to reflect field labels.

[NOV-18-22 Teilhard Valladares] Removed drawings to prevent confusion.
LP-4794 11-17-2022   Jew, Ernie HVAC Controls AHU door interlocks with BMS mods 59 Install AHU door interlocks and BMS control modifications to stop power to AHU fans when AHU doors are opened if AHU is running. [NOV-15-22 Katherine Johnson] No arc flash data in the main database to compare this information with.
LP-4793 11-17-2022   Jew, Ernie HVAC Controls AHU door interlocks with BMS mods 59 Install AHU door interlocks and BMS modifications to stop power to AHU fans when AHU doors are opened if AHU is running.  
LP-4792 11-17-2022   Jew, Ernie HVAC Controls AHU door interlocks with BMS mods 59 Install AHU door interlocks and BMS control modifications to stop power to AHU fans when AHU  doors are opened if AHU is running. [NOV-15-22 Katherine Johnson] No arc flash data in the main database to compare this information with.
LP-4791 11-21-2022   Grounds, Jeffrey Cray Computers N9 Upgrade 59 Install computer cabinet with 4 power feeds to it. Make electrical connections.  

4 circuit breakers will feed receptacles under the floor and the pigtails feed the cabinet power.  The breakers will be locked out so that new pigtails are not plugged in to an energized receptacle during installation.`
[NOV-15-22 Katherine Johnson] Arc flash on both Panel 628A1A and Panel 628A2A shows 4.17/39.2 in the main database.
LP-4790 11-21-2022   Grounds, Jeffrey Cray Computers N9 Upgrade 59 Install computer cabinet with 4 power feeds to it. Make electrical connections.  

4 circuit breakers will feed receptacles under the floor and the pigtails feed the cabinet power.  The breakers will be locked out so that new pigtails are not plugged in to an energized receptacle during installation.
[NOV-15-22 Katherine Johnson] Panel 628A1A show arc flash as 4.17/39.2 in main database and for Panel 628A7A: 3.86/37.4.
LP-4789 11-28-2022   Grounds, Jeffrey Cray Computers N9 Upgrade 59 Install CDU cabinet with 2 power feeds to it. Make electrical connections.  

2 circuit breakers will feed receptacles under the floor and the pigtails feed the CDU cabinet power.  The breakers will be locked out so that new pigtails are not plugged in to an energized receptacle during installation.
[NOV-15-22 Katherine Johnson] Panel 628A7A in the main database shows arc flash as 3.86/37.4.  Did you get new stickers?
LP-4784 11-09-2022   Jew, Ernie HVAC Controls AHU door interlocks with BMS mods 59 Install AHU door interlocks and BMS control modifications to stop power to AHU fans when AHU doors are opened if AHU is running.  
LP-4783 11-09-2022   Jew, Ernie HVAC Controls AHU door interlocks with BMS mods 59 Install door interlocks and BMS control modifications to stop power to AHU fans when AHU doors are opened if AHU is running.  
LP-4782 11-09-2022   Jew, Ernie HVAC Controls AHU door interlocks with BMS mods 59 Install AHU door interlocks and BMS control modifications to stop power to AHU fans when AHU doors are opened if the AHU is running.  
LP-4781 11-09-2022   Jew, Ernie HVAC Controls AHU door interlocks with BMS mods 59 Install AHU door interlocks and BMS modifications to stop power to AHU fans when AHU doors are opened if the AHU is running.  
LP-4780 11-09-2022   Jew, Ernie HVAC Controls AHU door interlocks with BMS mods 59 Install AHU door interlocks and BMS control modifications to stop power to AHU fans when AHU doors are opened if AHU is running.  
LP-4779 11-09-2022   Jew, Ernie HVAC Controls AHU door interlocks with BMS mods 59 Install AHU door interlocks and BMS control modifications to stop power to AHU fans when AHU doors are opened if AHU is running.  
LP-4778 11-09-2022   Jew, Ernie HVAC Controls AHU door interlocks with BMS mods 59 Install AHU door interlocks and BMS control modifications to stop power to AHU fans when AHU doors are opened if AHU is running.  
LP-4775 11-09-2022 HEC 1 (480V 1) Samatua, Tipasa IPS B. 66 BR/Ctrls Replacement 66 Subcontractor to rewire and test the External Low Water Cut Off Switch for the new Boiler (66-BR-04) at building 66. [NOV-04-22 Rance Kilbourn] Discussed job scope and electrical isolation with RI. Walked job and reviewed AF hazard. Confirmed AF label matches FAC Engineering records.
LP-4771 11-02-2022 HEC 2 (480V 2) Samatua, Tipasa Crouse Construction B. 88 Boiler/Controls Replacement 88 Apply LOTO to new FPU until an approved EVAP to release and energize new equipment [NOV-04-22 mark liljefelt] Field verified scope with RI. 

Verified with the RI that the FAC record for the panel schedule and the field panel schedule are correct.

Removed the original panel schedule attached to this LP and replaced with the correct panel schedule. 

[NOV-04-22 Rance Kilbourn] Final review and approval.
LP-4770 11-04-2022 HEC 1 (480V 1) Cota, David Kone Replace defective VFD 06 Remove de energized VFD located inside Bridge Crane control enclosure and replace with new.

Apply insulated sheeting over exposed parts located within and around the Bridge Crane control enclosure. 

Release LOTO and program new VFD. 

[OCT-28-22 mark liljefelt] Field verified scope with RI and Contractor QEW.

Added Required LOTO Sequence, attached supporting documents.

FAC record for Arc Flash matches Isolation Point and field AF label.

[NOV-03-22 mark liljefelt] Reviewed scope with FATSE Supervisor, modified LOTO sequence.

[NOV-03-22 Rance Kilbourn] Walked job and reviewed job scope, electrical isolations, AF hazard and LOTO sequence steps for accuracy. Confirmed both the single line drawing and AF label matches FAC records.
LP-4768 11-03-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 170 & 108 Equipment Move 77 Disconnect Press Brake equipment and pull wire out of conduit back to breaker [NOV-01-22 Rance Kilbourn] Walked job with RI and reviewed job scope, electrical isolation and AF hazard. Confirmed AF label matches FAC Engineering records. Panel schedule does not match FAC Engineering, emailed for an updated C1/C2.

[NOV-03-22 Rance Kilbourn] Received updated panel schedule from FAC Engineering and posted local copy at 72A1A. 

[NOV-04-22 mark liljefelt] FAC record for Arc Flash matches field Arc Flash label
LP-4767 11-30-2022   Grounds, Jeffrey Cray Computers N9 Upgrade 59 Install CDU cabinet with 2 power feeds to it. Make electrical connections.  

2 circuit breakers will feed receptacles under the floor and the pigtails feed the CDU cabinet power.  The breakers will be locked out so that new pigtails are not plugged in to an energized receptacle during installation.
[NOV-15-22 Katherine Johnson] Arc flash for Panel 628A7A shows 3.86/37.4 in the database.  Did you get new stickers?
LP-4766 10-25-2022 HEC 1 (480V 1) Gleason, David Goebel Paving/Grading PSPS Shore Power Outside B91U/MUP Will need to re-install panel cover and deadfront on Panel E773A after releasing LP-4615 and testing for proper voltage in the new panelboard E773A being fed by the load/XO side of new shore power XFMR/Bank E773A in order to ensure XFMR is operating properly. Install deadfront and panel cover on  E773A after new LP-4766 is established. [OCT-24-22 David Gleason] Previous LP-4693 was approved with the same scope of work.LP-4693 expired and needed the updated equipment labeling added to the LOTO Permit.

[OCT-25-22 David Gleason] See updated attached arc flash study and labels

[OCT-26-22 Rance Kilbourn] Walked job and reviewed job scope, electrical isolation and AF hazard. Confirmed AF label matches project AF study. Single line drawing match site conditions.

[OCT-26-22 mark liljefelt] Attached updated Isolation and safe work zone detail.
LP-4765 11-10-2022 HEC 1 (480V 1) espino, rey Clark Construction BioEpic 92 Helix will be completing an EVAP under LP-4753 to connect 2 new disconnects for the BioEpics man hoist carts and the 2 permeant elevator carts.  On the main disconnect for the elevator carts, the 2 downstream disconnects will not be installed and the wire will be safe off in a junction box on the 5th floor waiting for the 2 disconnects to be installed.  After we complete our EVAP under LP-4753, we will verify the man hoist carts work but we will need to establish this LOTO on the main disconnect for the elevators so we would be able to complete the installation of the 2 disconnects on the 5th floor at a later date. [NOV-07-22 Rance Kilbourn] Walked job with RI on 10/27/22. Reviewed job scope. Discussed the AF field labels were not installed. RI to provide an update once the installation work is complete and the AF label applied.

[NOV-08-22 Rance Kilbourn] AF label has been installed. See attached photo.

[NOV-08-22 mark liljefelt] Reviewed attachments.
LP-4762 11-04-2022 HEC 1 (480V 1) Nakaki, Lindsay Crouse Construction B54 Kitchen Equip Clear Out B54 Item 95: Removal of Groen dual pot cooker
Item 96: Removal of stainless steel kettle (xx 45-54)
Item 97: Removal of Ferco dual coffee maker

- Contractor to disconnect and remove Items 95, 96, & 97
- Contractor to remove conductors to nearest junction box
[OCT-26-22 Rance Kilbourn] Walked job and reviewed job scope, electrical isolations and AF hazard. field AF label and panel schedule matches FAC Engineering records. Unable to identify the dual coffee maker in the panel schedule, will need FAC electricians to investigate and identify correct circuit. 

[OCT-26-22 Rance Kilbourn] Work order W0301000 submitted to Facilities to identify coffee maker circuit.

[NOV-08-22 Rance Kilbourn] Facilities was able to locate the circuit feeding the coffee maker. Attached tech note to LP. 

[NOV-08-22 mark liljefelt] FAC records for Arc Flash and panel schedule match field AF label and panel schedule.
LP-4761 11-04-2022 HEC 3 (mechanical) Nakaki, Lindsay Crouse Construction B54 Kitchen Equip Clear Out B54 Item 92: Removal of Lincoln portable pizza oven
Item 93: Removal of Vulcan portable double oven

- Contractor to disconnect remove Items 92 & 93
- Contractor to cap/plug gas line after isolation point
[NOV-02-22 Teilhard Valladares] Field walk with Fire Protective Services. Reviewed and approve scope and controls.
LP-4760 11-04-2022 HEC 3 (mechanical) Nakaki, Lindsay Crouse Construction B54 Kitchen Equip Clear Out B54 Item 84: Removal of six-burner gas stove
Item 85: Removal of griddle
Item 86: Removal of two-burner gas stove

- Contractor to disconnect and remove Item 84, 85, & 86
- Contractor to cap/plug gas line after isolation point
[NOV-02-22 Teilhard Valladares] Field walked with Fire Protective Services. Reviewed and approved scope and controls.
LP-4759 11-04-2022 HEC 3 (mechanical) Nakaki, Lindsay Crouse Construction B54 Kitchen Equip Clear Out B54 Item 83: Removal of two (2) Frymaster fryers

- Contractor to disconnect and remove fryers
- Contractor to cap/plug gas piping after isolation point
[NOV-10-22 Teilhard Valladares] Field Walked with Fire Protective services. Reviewed scope and approved controls.
LP-4758 11-04-2022 HEC 1 (480V 1) Nakaki, Lindsay Crouse Construction B54 Kitchen Equip Clear Out B54 Item 73: Removal and demolition of walk-in refrigerator

- Contractor to remove equipment, sprinkler heads, lighting, receptacles, etc. within or attached to the walk-in fridge and freezer
- Contractor to remove conductors to nearest junction box
[OCT-25-22 Rance Kilbourn] Walked job with RI. Reviewed job scope and electrical isolations. Confirmed AF label matches current FAC Engineering records. Panel schedule has handwritten edits, contacted FAC Engineering for an updated C1/C2.

[OCT-26-22 Rance Kilbourn] Received the updated panel schedule for 446A3A.

[OCT-26-22 mark liljefelt] FAC records for Arc Flash and panel schedule match field AF label and panel schedule
LP-4757 11-04-2022 HEC 1 (480V 1) Nakaki, Lindsay Crouse Construction B54 Kitchen Equip Clear Out B54 Item 40: Removal of stainless steel storage top and two (2) warming shelves & removal of attached panel 446A5A34A 
Item 41: Removal of Wolf cooktop and stainless steel stand
Item 42: Removal of two warming ovens and six food storage drawers
Item 43: Removal of Wells deep fryer
Item 51: Removal of dishwasher with stainless steel counter
Item 52: Removal of Stero dishwasher machine

- Contractor to disconnect water source of Item 51
- Contractor to disconnect and remove Items 40, 41,42, 43, 51, & 52
- Contractor to remove conductors to items listed
- Contractor to terminate the removed conductor of Item 40 in panel 446A5A
- Contractor to terminate the removed conductor of Items 41, 42, 43 in nearest junction box
- Contractor to terminate the removed conductor of Items 51 & 52 at disconnects in Room 104
[OCT-27-22 Rance Kilbourn] Walked job and reviewed job scope, electrical isolation and AF hazard. Confirmed field AF label matches FAC Engineering records. Panel schedule has handwritten edits, contact FAC Engineering for an updated C1/C2.

[OCT-27-22 Rance Kilbourn] Received updated panel schedule. Added Mandatory Special Instructions for water and Ansul system shutoff prior to removal of equipment.

[OCT-27-22 mark liljefelt] FAC records for Arc Flash and panel schedule match field AF label and panel schedule.
LP-4756 11-04-2022 HEC 1 (480V 1) Nakaki, Lindsay Crouse Construction B54 Kitchen Equip Clear Out B54 Item C: Removal of Ansul System located in Room 111
- Contractor to disconnect Ansul System
- Contractor to remove conductors to nearest junction box if applicable
[NOV-01-22 Teilhard Valladares] Work order to investigate circuits inside the Ansul enclosures determined that only 1 ansul unit has 120v circuit going inside the enclosure in room 111. The circuit was verified and j-box was labeled.

[NOV-15-22 mark liljefelt] FAC records for Arc Flash and panel schedule match field AF label and panel schedule.
LP-4754 11-04-2022 HEC 2 (480V 2) Nakaki, Lindsay Crouse Construction B54 Kitchen Equip Clear Out B54 Item A: Removal of accent light (15) fixtures in Room 106
- Contractor to disconnect and remove light fixtures
- Contractor to remove associated conductors to nearest junction box(es)
[OCT-26-22 mark liljefelt] Field verified scope, added isolations, attached supporting documents.

Opened work order W0300776 to troubleshoot/confirm circuiting.

[NOV-08-22 mark liljefelt] Circuiting field verified, see attached Circuit Sketch

[NOV-08-22 mark liljefelt] FAC record for Arc Flash matches field AF label.

FAC record for panel schedule matches field panel schedule except for hand written clarifications and one item lined out on CKT41. 

[NOV-08-22 Rance Kilbourn] Final review and approval.
LP-4753 11-12-2022 HEC 1 (480V 1) espino, rey Clark Construction BioEpic 92 Helix has installed 2 new disconnects that they are needing to connect to the line side of their TP-1 gear. After work is completed, they will be completing their EVAP of the 2 disconnects that they have installed to run the 2-man hoist carts and the 2 elevator carts. 
Clark will also install rubber blankets inside the man hoist carts control cabinets to make the cabinets finger safe for the man hoist operator so they can put the cart in inspect mode so they can service the carts.
[OCT-26-22 mark liljefelt] Reviewed attachments and field verified scope at 513A Switchgear.

FAC record for Arc  Flash matches field Arc Flash label.


[OCT-26-22 Rance Kilbourn] Final review and approval
LP-4752 11-01-2022 HEC 3 (mechanical) Samatua, Tipasa Crouse Construction B. 88 Boiler/Controls Replacement 88 Subcontractor to terminate new Boilers ALC Panels Power feeders to existing circuit breakers in Panel 82A1A. [OCT-20-22 mark liljefelt] Field verified scope with RI.

Attached supporting docs for Arc Flash and panel schedule.

FAC records for Arc Flash and panel schedule match field documentation
LP-4749 10-13-2022   Cassell, Jim Infrequent Subcontractor B977 Barrier Autoclave Maintenance 977 Access the boiler control area.  
LP-4747 10-14-2022 HEC 2 (480V 2) Bolles, Benjamin Infrequent Subcontractor Replace AC-004 compressor 91 All electrical isolations and terminations will be performed by LBNL HVAC QEW's.

* Compressor replacement ACH-004 circuit 1 Model UCA070BFAVARE0J Serial 201805070002

*Recover the R410a charge from circuit 1

* Remove the compressor and the 2 liquid line filter/driers

* Braze in new driers and new compressor

*Pressure test with nitrogen and trace gas

*Perform standing pressure test

*Evacuate to <500 microns

*Charge with new R10a to nameplate change

*Start compressor and verify proper operation
[OCT-11-22 mark liljefelt] Conflict exists between SLD and field labeling on disconnect switch. Contacted FAC Electrical Engineering for resolution.

[OCT-13-22 Teilhard Valladares] Field walked with HVAC lead and verified scope of work.

[OCT-18-22 mark liljefelt] FATSE2 Electricians field verified the correct isolation point for AC-004 under W0299763. The SLD has been corrected. 

FAC record for Arc Flash matches field AF label.

[OCT-18-22 Rance Kilbourn] Final review and approval.
LP-4743 09-19-2022 HEC 1 (480V 1) Spier, William Michael Groundlevel Construction B62B Electrical Upgrade B62 Attach 2" LB & conduit to electric panel EM66A9A1A on the right side. Route inside panel to Bucket 2FR  (labeled SPARE) Install new Breaker. Attach conductors, Torque Breaker connections to panel buss bar and conductors, mega test breaker, conductors.  Leave New Breaker 2FR in the OFF position, Apply Administrative Lock on New Breaker at panel EM66A9A1A Bucket Location 2FR
Complete EVAP #1 
Downstream of new breaker will be completed with EVAP #2 LOTO # 4774

In addition  Facilities Electricians to join LP-4743 and replace MCC Bucket 1D for 62-BL-004 in MCC EM66A9A1A1A located in B62 penthouse.
[NOV-01-22 William Michael Spier] LOTO # 4774 will be scheduled for EVAP #2  (downstream from new Breaker 2FR)

[NOV-02-22 Jeff Hendrick] added Facilities Electricians scope of work to LOTO Permit

[NOV-07-22 Rance Kilbourn] Walked job with RI and reviewed job scope, electrical isolations and AF hazard. Identified circuit label mismatch from FAC Engineering single line drawing. Requested assistance from FAC Engineering team for a corrective action.

[NOV-10-22 Rance Kilbourn] FAC Engineering provided guidance on the mismatched circuit label and single line drawings, see attached email. Updated the 1LineMarkUp drawing to align with FAC Engineering directions. Added switching requirement and sequence to the Mandatory Special Instructions.

[NOV-10-22 mark liljefelt] FAC records for Arc Flash match field AF labels.

FAC SLD does not align with field condition. Facilities Electrical Engineering is aware and working on corrections.

[NOV-17-22 Michael Rose] Reviewed and approved required ESWP elements as contained in Mandatory Special Instructions field.
LP-4742 10-10-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 161 Metrology Project 77 If Rotation is incorrect Phases will be changed at Disconnect after this LOTO is established. An admin. lock will be placed at Disconnect after LOTO has been released. [OCT-03-22 Rance Kilbourn] Walked job and reviewed job scope, panel schedule and AF label. Moved LOTO sequence language from the job scope section to the LOTO sequence section. Confirmed the AF label matches the current FAC Engineering record. Placed on hold while RI to confirm job scope changes.

[OCT-03-22 Michael Benz] I agree with this change.

[OCT-04-22 mark liljefelt] FAC record for Arc Flash matches field AF label.
LP-4741 10-10-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 161 Metrology Project 77 If Rotation is incorrect Phases will be changed at VFD after this LOTO is established. An admin. lock will be placed at VFD after LOTO has been released. [OCT-03-22 Rance Kilbourn] Walked job and reviewed job scope, panel schedule and AF label. Moved LOTO sequence language from the job scope section to the LOTO sequence section. Confirmed the AF label matches the current FAC Engineering record. Placed on hold while RI to confirm job scope changes.

[OCT-03-22 Michael Benz] I agree with this change.

[OCT-04-22 mark liljefelt] FAC record for Arc Flash matches field AF label
LP-4740 10-10-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 161 Metrology Project 77 If Rotation is incorrect Phases will be changed at VFD after this LOTO is established. An admin. lock will be placed at VFD after LOTO has been released. [OCT-03-22 Rance Kilbourn] Walked job and reviewed job scope, panel schedule and AF label. Moved LOTO sequence language from the job scope section to the LOTO sequence section. Confirmed the AF label matches the current FAC Engineering record. Placed on hold while RI to confirm job scope changes.

[OCT-03-22 Michael Benz] I agree with this change.

[OCT-04-22 mark liljefelt] FAC record for Arc Flash matches field AF label
LP-4739 10-10-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 161 Metrology Project 77 If Rotation is incorrect Phases will be changed at Disconnect after this LOTO is established. An admin. lock will be placed at Disconnect after LOTO has been released. [OCT-03-22 Rance Kilbourn] Walked job and reviewed job scope, panel schedule and AF label. Moved LOTO sequence language from the job scope section to the LOTO sequence section. Confirmed the AF label matches the current FAC Engineering record. Placed on hold while RI to confirm job scope changes.

[OCT-03-22 Michael Benz] I agree with this change.

[OCT-04-22 mark liljefelt] FAC record for Arc Flash matches field AF label.
LP-4738 10-10-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 161 Metrology Project 77 If Rotation is incorrect Phases will be changed at VFD after this LOTO is established. An admin. lock will be placed at VFD after LOTO has been released. [OCT-03-22 Rance Kilbourn] Walked job and reviewed job scope, panel schedule and AF label. Moved LOTO sequence language from the job scope section to the LOTO sequence section. Confirmed the AF label matches the current FAC Engineering record. Placed on hold while RI to confirm job scope changes.

[OCT-03-22 Michael Benz] I agree with this change.

[OCT-04-22 mark liljefelt] FAC record for Arc Flash matches field AF label.
LP-4737 10-10-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 161 Metrology Project 77 If Rotation is incorrect Phases will be changed at VFD after this LOTO is established. An admin. lock will be placed at VFD after LOTO has been released. [OCT-03-22 Rance Kilbourn] Walked job and reviewed job scope, panel schedule and AF label. Moved LOTO sequence language from the job scope section to the LOTO sequence section. Confirmed the AF label matches the current FAC Engineering record. Placed on hold while RI to confirm job scope changes.

[OCT-03-22 Michael Benz] I agree with this change.

[OCT-04-22 mark liljefelt] FAC record for Arc Flash matches field AF label.
LP-4736 10-10-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 161 Metrology Project 77 If Rotation is incorrect Phases will be changed at VFD after this LOTO is established. An admin. lock will be placed at VFD after LOTO has been released. [OCT-03-22 Rance Kilbourn] Walked job and reviewed job scope, panel schedule and AF label. Moved LOTO sequence language from the job scope section to the LOTO sequence section. Confirmed the AF label matches the current FAC Engineering record. Placed on hold while RI to confirm job scope changes.

[OCT-03-22 Michael Benz] I agree with this change.

[OCT-04-22 mark liljefelt] FAC record for Arc Flash matches field AF label.
LP-4735 10-10-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 161 Metrology Project 77 If Rotation is incorrect Phases will be changed at VFD after this LOTO is established. An admin. lock will be placed at VFD after LOTO has been released. [OCT-03-22 Rance Kilbourn] Walked job and reviewed job scope, panel schedule and AF label. Moved LOTO sequence language from the job scope section to the LOTO sequence section. Confirmed the AF label matches the current FAC Engineering record. Placed on hold while RI to confirm job scope changes.

[OCT-03-22 Michael Benz] I agree with this change.

[OCT-04-22 mark liljefelt] FAC record for Arc Flash matches field AF label
LP-4734 10-10-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 161 Metrology Project 77 If rotation is incorrect phases will be changed in disconnect after this LOTO has been applied.  After LOTO is released admin. lock will be applied and equipment will be energized with MEVAP [OCT-03-22 Rance Kilbourn] Walked job and reviewed job scope, panel schedule and AF label. Moved LOTO sequence language from the job scope section to the LOTO sequence section. Requested an updated FAC panel schedule from RI. Confirmed the AF label matches the current FAC Engineering record. Placed on hold while RI can confirm job scope changes and provide panel schedule.

[OCT-03-22 Michael Benz] I agree with this change.

[OCT-04-22 mark liljefelt] FAC record for Arc Flash matches field AF label
LP-4733 10-10-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 161 Metrology Project 77 If rotation is incorrect phases will be changed in disconnect after this LOTO has been applied.  After LOTO is released admin. lock will be applied and equipment will be energized with MEVAP [OCT-03-22 Rance Kilbourn] Walked job and reviewed job scope, panel schedule and AF label. Moved LOTO sequence language from the job scope section to the LOTO sequence section. Requested an updated FAC panel schedule from RI. Confirmed the AF label matches the current FAC Engineering record. Placed on hold while RI can confirm job scope changes and provide panel schedule.

[OCT-03-22 Michael Benz] I agree with this change.

[OCT-04-22 mark liljefelt] FAC record for Arc Flash matches field AF label
LP-4732 09-30-2022 HEC 1 (480V 1) Gleason, David Groundlevel Construction Black Start (PSPS) 64C LOTO needs to be in place as a contingent LOTO if phase rotation is needed at new PSPS XFMR Bank 772 (High) after the initial PSPS Generator start up while executing LP-4692 and LP-4706 [SEP-26-22 David Gleason] David Gleason/RI reviewed 9/26/2022

[OCT-05-22 David Gleason] REVISED WITH SAME ISOLATION POINTS AS  LP-4692 AND LP-4706

[OCT-11-22 David Gleason] RI/David Gleason has reviewed.

[OCT-12-22 Rance Kilbourn] Reviewed attached documents. Attached the correct single line drawing since the original drawing referenced LP-4692. Confirmed AF levels match FAC Engineering records.

[OCT-12-22 mark liljefelt] FAC records for Arc Flash match the Isolation Checklist.

[OCT-12-22 Michael Rose] Added approved Switchtag 4732
LP-4731 09-30-2022 HEC 3 (mechanical) espino, rey Crouse Construction B70A Abergel B70A No electrical work to be performed under this LOTO permit.

Cal NEVA will need to lock out power to blowers 28, 81, 82 and block blower fan so they can work on re-shimming blower motor
[SEP-22-22 mark liljefelt] Changed original Scope of Work  statement, *NOT an Electrical LOTO* to: 
 "No electrical work to be performed under this LOTO permit".







[SEP-22-22 mark liljefelt] Attached AF label for EM31A18A2A.

Changed voltage from 480V to 208V.

FAC records for Arc Flash and panel schedule match attached documents

[SEP-22-22 Teilhard Valladares] Areas affected by this LOTO are under construction. Fume hoods are not being used. Isolations and mandatory instructions matches scope of work.
LP-4730 09-30-2022 HEC 2 (480V 2) espino, rey Crouse Construction B70A Abergel B70A Cal Neva will need to enter existing FPU panels near room 2245 and in room 2245 and 2235.  They will be pulling out control wiring that is not needed anymore since they have reconfigured the lab spaces in rooms 2235 and 2245.  [SEP-23-22 mark liljefelt] Field verified scope. Attached marked up Key Plan and reviewed with RI.

FAC records for Arc Flash and panel schedule match field documents.

[SEP-23-22 Rance Kilbourn] Final review and approval.
LP-4729 09-30-2022 HEC 1 (480V 1) espino, rey Crouse Construction B70A Abergel B70A TEP will need to install 1 new 20A circuit breaker and 2-2pole circuit breakers in panel E31A18A1A10A to feed a new FPU panel on the 2nd floor and to feed 2 - 208V receptacles in room 2245.  They will also pull in and terminate new wire to the 3 new breakers they install. [SEP-22-22 mark liljefelt] Field verified scope. 

Contacted FEE for recommendation for switching in Overdutied PNL E31A18A1A

FAC record for Arc Flash matches field label.

PNL E31A18A1A Copy 1 schedule is not at panel. Copy 2 has mark ups that do not affect this LOTO permit.

[SEP-22-22 mark liljefelt] Made request for updated C1/C2  panel schedules.

[SEP-23-22 mark liljefelt] Per FEE, PNL E31A18A1A has been reevaluated and is no longer considered overdutied.

Overdutied label has been removed

[SEP-23-22 Rance Kilbourn] Final review and approval.
LP-4725 09-28-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 170 & 108 Equipment Move 77 If equipment rotation is incorrect,  change rotation at the receptacle wiring under this LOTO permit.
Release LOTO.
Recheck equipment rotation for proper direction.
[SEP-29-22 Rance Kilbourn] Field verified panel schedule and AF label. AF label matches current FAC Engineering records. Panel schedule has handwritten edits, RI will submit a final corrected panel schedule to FAC Engineering once EVAP is complete. Made edits to the job scope and moved the LOTO sequence language from section 5 to section 8. On hold pending RI approval of the changes.

[SEP-29-22 Michael Benz] I approve this change.

[SEP-30-22 mark liljefelt] FAC records for Arc Flash match field labeling. 

Panel schedule changes are being managed by the project team.
LP-4724 09-28-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 170 & 108 Equipment Move 77 If equipment rotation is incorrect,  change rotation at the receptacle wiring under this LOTO permit.
Release LOTO.
Recheck equipment rotation for proper direction.
[SEP-29-22 Rance Kilbourn] Field verified panel schedule and AF label. AF label matches current FAC Engineering records. Panel schedule has handwritten edits, RI will submit a final corrected panel schedule to FAC Engineering once EVAP is complete. Made edits to the job scope and moved the LOTO sequence language from section 5 to section 8. On hold pending RI approval of the changes.

[SEP-29-22 Michael Benz] I agree with this change.

[SEP-30-22 mark liljefelt] FAC record for Arc Flash matches field labeling.

Panel schedule changes are being managed by the project team.
LP-4723 09-28-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 170 & 108 Equipment Move 77 If equipment rotation is incorrect,  change rotation at the receptacle wiring under this LOTO permit.
Release LOTO.
Recheck equipment rotation for proper direction.
[SEP-29-22 Rance Kilbourn] Field verified panel schedule and AF label. AF label matches current FAC Engineering records. Panel schedule has handwritten edits, RI will submit a final corrected panel schedule to FAC Engineering once EVAP is complete. Made edits to the job scope and moved the LOTO sequence language from section 5 to section 8. On hold pending RI approval of the changes.

[SEP-29-22 Michael Benz] I agree with this change.

[SEP-30-22 mark liljefelt] FAC record for Arc Flash matches field labeling.

Panel schedule changes are being managed by the project team.
LP-4720 09-28-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 170 & 108 Equipment Move 77 If equipment rotation is incorrect,  change rotation at the receptacle wiring under this LOTO permit.
Release LOTO.
Recheck equipment rotation for proper direction.
[SEP-29-22 Rance Kilbourn] Field verified panel schedule and AF label. AF label matches current FAC Engineering records. Panel schedule has handwritten edits, RI will submit a final corrected panel schedule to FAC Engineering once EVAP is complete. Made edits to the job scope and moved the LOTO sequence language from section 5 to section 8. On hold pending RI approval of the changes.

[SEP-29-22 Michael Benz] I agree with this change.

[SEP-30-22 mark liljefelt] FAC record for Arc Flash matches field labeling.

Panel schedule changes are being managed by the project team.
LP-4719 09-28-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 170 & 108 Equipment Move 77 If equipment rotation is incorrect,  change rotation at the receptacle wiring under this LOTO permit.
Release LOTO.
Recheck equipment rotation for proper direction.
[SEP-29-22 Rance Kilbourn] Field verified panel schedule and AF label. AF label matches current FAC Engineering records. Panel schedule has handwritten edits, RI will submit a final corrected panel schedule to FAC Engineering once EVAP is complete. Made edits to the job scope and moved the LOTO sequence language from section 5 to section 8. On hold pending RI approval of the changes.

[SEP-29-22 Michael Benz] I agree with this change.

[SEP-30-22 mark liljefelt] FAC record for Arc Flash matches field labeling.

Panel schedule changes are being managed by the project team.
LP-4718 09-28-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 170 & 108 Equipment Move 77 If equipment rotation is incorrect,  change rotation at the receptacle wiring under this LOTO permit.
Release LOTO.
Recheck equipment rotation for proper direction.
[SEP-29-22 Rance Kilbourn] Field verified panel schedule and AF label. AF label matches current FAC Engineering records. Panel schedule has handwritten edits, RI will submit a final corrected panel schedule to FAC Engineering once EVAP is complete. Made edits to the job scope and moved the LOTO sequence language from section 5 to section 8. On hold pending RI approval of the changes.

[SEP-29-22 Michael Benz] I agree with this change.

[SEP-30-22 mark liljefelt] FAC record for Arc Flash matches field labeling.

Panel schedule changes are being managed by the project team.
LP-4717 09-28-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 170 & 108 Equipment Move 77 If equipment rotation is incorrect,  change rotation at the receptacle wiring under this LOTO permit.
Release LOTO.
Recheck equipment rotation for proper direction.
[SEP-29-22 Rance Kilbourn] Field verified panel schedule and AF label. AF label matches current FAC Engineering records. Panel schedule has handwritten edits, RI will submit a final corrected panel schedule to FAC Engineering once EVAP is complete. Made edits to the job scope and moved the LOTO sequence language from section 5 to section 8. On hold pending RI approval of the changes.

[SEP-29-22 Michael Benz] I agree with this change.

[SEP-30-22 mark liljefelt] FAC record for Arc Flash matches field labeling.

Panel schedule changes are being managed by the project team.
LP-4716 09-28-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 170 & 108 Equipment Move 77 If rotation is incorrect utilize this LOTO permit to correct rotation by changing wiring leads at the receptacle.
Release LOTO.
Recheck equipment rotation.
[SEP-30-22 Rance Kilbourn] Field verified panel schedule and AF label. AF label matches current FAC Engineering records. Panel schedule has handwritten edits, RI will submit a final corrected panel schedule to FAC Engineering once EVAP is complete. Made edits to the job scope and moved the LOTO sequence language from section 5 to section 8. On hold pending RI approval of the changes.

[SEP-30-22 Michael Benz] I agree with this change.

[SEP-30-22 mark liljefelt] FAC record for Arc Flash matches field labeling.

Panel schedule updates are being managed by the project team.
LP-4715 09-28-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 170 & 108 Equipment Move 77 If equipment rotation is incorrect,  change rotation at the receptacle wiring under this LOTO permit.
Release LOTO.
Recheck equipment rotation for proper direction.
[SEP-22-22 Teilhard Valladares] The equipment listed in this permit is different from the equipment listed in the panel schedule. 72A2A ckt. 2 is for the spinning lathe and 72A2A CKT. 3 is for the Accupress brake. No equipment are currently in the area. Will need to verify which equipment is needed for this permit. 

[SEP-28-22 Rance Kilbourn] RI added updated panel schedule.

[SEP-29-22 Rance Kilbourn] Field verified panel schedule and AF label. AF label matches current FAC Engineering records. Panel schedule has handwritten edits, RI will submit a final corrected panel schedule to FAC Engineering once EVAP is complete. Made edits to the job scope and moved the LOTO sequence language from section 5 to section 8. On hold pending RI approval of the changes

[SEP-29-22 Michael Benz] I agree with this change.

[SEP-30-22 mark liljefelt] FAC record for Arc Flash matches field labeling.

Panel schedule changes are being managed by the project team.
LP-4714 09-28-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 170 & 108 Equipment Move 77 If equipment rotation is incorrect,  change rotation at the receptacle wiring under this LOTO permit.
Release LOTO.
Recheck equipment rotation for proper direction.
[SEP-28-22 Rance Kilbourn] Field verified panel schedule and AF label, attached photos of both. Panel schedule does not match current FAC Engineering record. Requested RI to upload a current copy of an approved panel schedule. Edited the job scope and moved the LOTO sequence language from section 5 to section 8. On hold pending RI approval of the changes made to LP-4714. 

[OCT-03-22 Michael Benz] I agree with this change.

[OCT-04-22 mark liljefelt] FAC record for Arc Flash matches field AF label.
LP-4713 09-28-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 170 & 108 Equipment Move 77 If equipment rotation is incorrect,  change rotation at the receptacle wiring under this LOTO permit.
Release LOTO.
Recheck equipment rotation for proper direction.
[SEP-28-22 Rance Kilbourn] Walked job and reviewed field panel schedule and AF label. Panel schedule is not current with FAC Engineering records and has handwritten edits. RI, Please attached a current C1/C2 panel schedule to this LOTO permit application. 

[SEP-29-22 Rance Kilbourn] Confirmed AF field label matches FAC Engineering records. Edited the job scope and moved the LOTO sequence language from section 5 to section 8. On hold pending RI approval of the changes made to LP-4713.
Spoke with RI and confirmed the project will update panel schedule once the EVAP is complete.  

[SEP-29-22 Michael Benz] I Agree with this change.

[SEP-30-22 mark liljefelt] FAC record for Arc Flash matches field labeling.

Panel schedule changes are being managed by the project team.
LP-4712 09-16-2022 HEC 2 (480V 2) Bolles, Benjamin Crouse Construction B77 Enclosure B77 Required test for two new dry type transformers:
30kva and 45kva transformers.  Scope also includes hard piping the secondary disconnects to the new water jet components.
[OCT-11-22 mark liljefelt] Note that scope of work to remove and replace primary side disconnect switches has been moved to scope of work under LP-4694.

[OCT-18-22 mark liljefelt] Field verified scope. Attached supporting documents.

FAC Record for Arc Flash matches field AF label.

FAC record for panel schedule does not match because circuit breakers at spaces 16 and 22 have been removed and replaced with larger sized circuit breakers under the B77 Enclosure Project.  

The Project team will turn in updated documents.

[OCT-18-22 Benjamin Bolles] Agree

[OCT-18-22 Rance Kilbourn] Final review and approval.
LP-4711 09-27-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 161 Metrology Project 77 Loto 753A Ckt17 so that down stream work can be complete in panel 753A17A. all inspection will be do prior to energizing EVAP will also be required to energize. [SEP-14-22 mark liljefelt] Performed site walk. Note that 753A system panels, transformer and conductors are still in construction phase. 

Conductors are not terminated, Arc Flash labels have not been applied.

Please notify HEC when this application is ready for a site walk.

[NOV-07-22 Rance Kilbourn] Walked job with RI. Reviewed job scope, electrical isolation and AF hazard. Confirmed both AF label and panel schedule matches FAC Engineering records. 

[NOV-07-22 Rance Kilbourn] Correction: AF label for 753A does not match FAC records. Contacted FAC Engineering for clarification.

[NOV-07-22 Rance Kilbourn] Field AF label was misprinted by the project team. Corrected temp label attached until permanent label can be printed and applied.

[NOV-07-22 mark liljefelt] FAC records for panel schedule and Arc Flash match field panel schedule and temporary Arc Flash label.
LP-4710 09-20-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 161 Metrology Project 77 Install raceway in MCC 72E. Pull new conductors and terminate to spare breaker in  PNL199A CKT6 for cooling tower control circuit.

Note that PNL199A is located within the MCC72E enclosure, pulling conductors through MCC72E to PNL199A will require isolation upstream at walk in switch gear (SWGR72A)
[SEP-16-22 mark liljefelt] Field verified scope. Attached supporting documents.

Reviewed with RI.

[SEP-19-22 Rance Kilbourn] Confirmed electrical isolation and AF are both correct. Reviewed supporting docs.
LP-4708 09-13-2022 HEC 1 (480V 1) Samatua, Tipasa Groundlevel Construction B. 73 Renovation (Cold Shell) 73 via Building 62 Subcontractor to inspect and clean out electrical panels before executing of the approved EVAP to energize new Temp Power for building 73. [SEP-12-22 Rance Kilbourn] Reviewed job, walked with RI. Confirmed AF matches FAC records. Added remote switching to the mandatory special instructions.

[SEP-12-22 mark liljefelt] FAC records for Arc Flash and panel schedule match field documents

[NOV-01-22 mark liljefelt] Spoke with RI regarding scope clarification to re-inspect conductors and Polaris lugs located within the Electrically Safe work zone established by this LOTO permit.

Determined that this additional inspection effort  does not meet the requirement for a field change.
LP-4707 09-30-2022 HEC 1 (480V 1) Samatua, Tipasa Crouse Construction B. 77 Enclosure 77 Subcontractor to replace the defective VFD DSC on the new AHU (77-AHU-039) at building 77 roof under warranty work. [SEP-15-22 Tipasa Samatua] All work will be at the AHU on the roof of building 77.

[SEP-27-22 Rance Kilbourn] Walked job with RI on 9/27/2022. Reviewed job scope, electrical isolations and AF PPE level. Confirmed field AF label and panel schedule match FAC Engineering records. 

[SEP-27-22 mark liljefelt] FAC records for Arc Flash and panel schedule match field documents.
LP-4706 09-15-2022 HEC 1 (480V 1) Gleason, David Groundlevel Construction Black Start 64C Vertiv testing per specifications, this will also include the transformer on secondary
Determinate 12 KV wire off of  64C-adf-001 Way F and prep for testing
Prep 12 KV wire at Xfmr-Gen-001, 
Run cable trays from Gen - 001 to Xfmr0Gen-001 on the Secondary Side
Run new cables from Gen - 001 to Xfmr0Gen-001 on the Secondary Side
Testing of 64C-ADF-001
Testing of Ground resister
Testing of 12 KV Cables
Terminate leads back onto 64C-ADF-001 Way F
Terminate leads on to Xfmr-Gen-001
Inspection by IAHJ
Install cover guards  or tape the terminations at Gen-001 and 64C-ADF-001 WAY F
Install all covers, and close all doors
Testing & Commissioning
[SEP-09-22 mark liljefelt] Please provide attachments per Sec.8 requirements: "At a minimum this should be a single line outlining your LOTO safe zone or a panel schedule if a single line is not available".

[SEP-15-22 mark liljefelt] Reviewed with FATSE2 Supervisor Jeff Hendrick.

Attached SLD Detail Markup

[SEP-21-22 David Gleason] David Gleason/RI reviewed 9/21/2022 at 11;07 am

[SEP-21-22 Rance Kilbourn] Final review of electrical isolations, AF PPE level and job scope documentation.
LP-4704 10-11-2022 HEC 1 (480V 1) Brunkow, Douglas CAL NEVA B70 LN2 Tank fill station 70 Modify LN2 Tank piping system. [SEP-13-22 Teilhard Valladares] Field walk scheduled 9/13/22.

[SEP-13-22 Teilhard Valladares] Created work order W0296317 to confirm valve will hold.

[SEP-28-22 Teilhard Valladares] Valve operations was verified on 9/27. Confirmed no LN  leak. Per work order W0296317.

[SEP-29-22 Teilhard Valladares] Sent to cryogen SME for review.

[SEP-30-22 Teilhard Valladares] Reviewed and approved by Kurt Ettinger.

[NOV-11-22 mark liljefelt] Verified with RI that conditions have not changed and extended LP to the end of January.
LP-4703 09-13-2022 HEC 2 (480V 2) Reynolds, Ben IPS B50 4030/4036 renovation B50 Once under LOTO, contractor will demo #12 wire from breaker 24, repull #10 wire.  Inspector will torque and megger at Panel 25A6A9A.  LOTO will be released upon passed inspection. [SEP-06-22 Rance Kilbourn] The panel schedule has a handwritten edit that does not affect this LOTO permit, the AF label is current and matches FAC Engineering records. Added Mandatory Special Instructions for switching panel 25A6A which is labeled OVERDUTIED.

[SEP-06-22 Teilhard Valladares] Isolation reflect scope of work.
LP-4702 09-08-2022 HEC 1 (480V 1) Samatua, Tipasa Crouse Construction B. 88 Boiler/Controls Replacement 88 Subcontractor to splice in three (3) new ALC Control Panels to existing circuits as part of the B. 88 Boilers/Controls Replacement Project.

1. Establish LOTO at C/B 4, 9 and 10 in Panel E45A
2. Perform ZVV at receptacles
3. Perform work.
4. Release LOTO with an approved EVAP/MEVAP only.
[AUG-29-22 mark liljefelt] FAC records for Arc Flash and panel schedule match field documents.

[SEP-09-22 mark liljefelt] Field verified scope of work with RI

[OCT-13-22 Tipasa Samatua] Deleted C/B and add C/B 10
LP-4700 08-29-2022   Grounds, Jeffrey Infrequent Subcontractor FIKE EPO Repairs 59 Intellitech to rewire FIKE EPO button #2 to match EPO button #1 outputs. System will be tested off line for proper operation. WE will not perform a full shutdown. [AUG-30-22 mark liljefelt] Field verified isolation points.

Attached supporting documents

FAC records for Arc Flash and panel schedules match field documents.
LP-4699 08-19-2022 HEC 1 (480V 1) Cota, David Kone 067 Drive replacement 067 Remove existing drive in service elevator control panel and replace with new [AUG-19-22 mark liljefelt] Field verified scope with RI on 08/19.

Added Electrical Isolations.

Added Attachments.
LP-4698 08-26-2022 HEC 3 (non-electrical) Nakaki, Lindsay CAL NEVA 108035 - B86 Humidifier Replacement 86 - Complete steam piping to HU-003 [AUG-17-22 Lindsay Nakaki] Note that work will not be taking place inside HU-002. LOTO is requested to prevent a steam hazard from being produced by HU-002. Reference LP-4564 for similar permit.

[AUG-24-22 Teilhard Valladares] Reviewed Isolation and scope with HVAC lead. 

[AUG-25-22 mark liljefelt] FAC records for Arc Flash and panel schedule match field documents
LP-4697 08-26-2022 HEC 1 (480V 1) espino, rey Clark Construction BioEpic 92 After LOTO is established, Helix will pull in new cables to junction boxes labeled T1-3, T4-R, elevator 1, No work will be done inside TP-1. loto will stay until EVAP approved for the 2 new skids and the elevator feed disconnect . [AUG-16-22 mark liljefelt] Field verified scope. 

Field panel schedule does not match attached Temp Power Drawing for Isolation 2. RI has been contacted for clarification.

[AUG-19-22 mark liljefelt] 
Corrections have been made to the Isolation Checklist.

Mandatory Instructions added for ZVV method.

Arc Flash information is validated by FAC Electrical Engineering in the Bio Epic Construction Power EVAP #1 (Attached)
LP-4696 08-15-2022 HEC 1 (480V 1) Gleason, David Crouse Construction 2nd Floor Pre-Action System - B91 B91 Panel - E679A1A5A, new circuits numbers 14, 16, 18 which will supply new pre-action air supply, NOVEK and VESDA panels will need to remain in the off/open position in order to schedule start-up and programming, needed for new equipment, and to re-energize Panel - E679A1A5A reducing the time-frame  Panel - E679A1A5A LP-4687 is off/de-energized.  The 3 new circuits (14,16 and 18) will be left in the open position and locked out under LP-4696 after torque and megger testing is approved by the IAHJ. Start-up programming, testing of the new equipment by the manufacturer's representative after the commission of the new fire suppression and fire detection panels will close out LOTO 4696 [AUG-11-22 Teilhard Valladares] Field arc flash label matches facilities arc flash database. 

[AUG-12-22 Teilhard Valladares] PNL E679A1A5A ckts 14, 16, 18 are currently listed as spare on the panel schedule. Make corrections on the panel schedule and send to facilities engineering group so updates can be made in the database.
LP-4695 08-17-2022 HEC 1 (480V 1) Hendrick, Jeff Electrical Reliability Services (Vertiv) Bank 47 SW-A5 deffered maintenance 84 Vertiv to perform deferred maintenance on Bank 47A, SWGR 47A and 74-ADF-001, and metering [AUG-15-22 mark liljefelt] Field verified scope, contacted Jeffri Halim regarding the overdutied condition of PNL E47A2A5A.

Contacted RI Jeff Hendrick regarding PNL E47A2A5A Schedule not accurate. Panel schedule will be updated as part of LOTO activity.

[AUG-19-22 mark liljefelt] Additional inaccuracies were found during LOTO establishment.

LP-4695 placed on HEC Hold pending corrections to Isolation Checklist


[AUG-19-22 mark liljefelt] Reviewed corrections to Isolation Checklist with RI Jeff Hendrick.
LP-4694 08-10-2022 HEC 2 (480V 2) Bolles, Benjamin Crouse Construction B. 77 water jet project 77 Remove and replace 70 amp breaker with 150 amp breaker.

Remove and replace 60 amp breaker with 80 amp breaker.

Remove and replace disconnect switch feeding transformer labeled 72C2A-16.

Remove and replace disconnect switch feeding transformer labeled 72C2A-22

[SEP-22-22 mark liljefelt] Field verified scope, attached marked up single line drawing.

FAC record for Arc Flash matches field documentation.

FAC record for panel schedule does not reflect field condition for CKT7 and CKT8 but is not relevant to this LOTO permit. 

[SEP-22-22 mark liljefelt] Verified with RI that cleared position will be "Closed"

[SEP-22-22 Rance Kilbourn] Final review of job scope, electrical isolation, AF level and attached supporting documents.

[OCT-11-22 mark liljefelt] Added scope of work to remove and replace two disconnect switches.

Edited the SLD markup attachment to reflect the additional scope of work

[OCT-11-22 Rance Kilbourn] Reviewed additional job scope and single line drawing for disconnect switch replacement.
LP-4693 08-15-2022 HEC 1 (480V 1) Gleason, David Goebel Paving/Grading Bayview Generator Outside B91U/MUP LOTO (E) 150A Unfused Disconnect, megger and torque wiring and terminations to new 480/277 - 208/120 (E) 75 kva transformer  and  (E)  Panel  L1 panelboard. Install deadfront  and panel cover on  (E)  Panel  L1 panelboard then energize  (E)  Panel  L1 panelboard. [AUG-22-22 mark liljefelt] Field verified scope with RI. 

Made changes to Isolation Equipment Descriptor, Isolation Point and Arc Flash fields

Attached supporting documents
LP-4692 09-15-2022 HEC 1 (480V 1) Gleason, David Groundlevel Construction Black Star (PSPS) 64 C Perform ZVVs 
Open Pull Box Xfmer-Gen-001 used to store 12KV wire from PSPS last year, perform ZVVs on wire
Remove the Pull Box Xfmer-Gen-001, safe off wires
Set Transformer - Xfmer-Gen-01
Install new raceway on to Xfmer-Gen-001 Primary Side by sliding over the existing 12 KV wires
Install 2" Conduit and 12 KV wire to the Ground Resister
Testing and Rotation on Gen-001
Vertiv testing per specifications, this will also include the transformer
Determinate 12 KV wire off of  64C-adf-001 Way F and prep for testing
Prep 12 KV wire at Xfmr-Gen-001, 
Run cable trays from Gen - 001 to Xfmr0Gen-001 on the Secondary Side
Run new cables from Gen - 001 to Xfmr0Gen-001 on the Secondary Side
Testing of 64C-ADF-001
Testing of Ground resister
Testing of 12 KV Cables
Terminate leads back onto 64C-ADF-001 Way F
Terminate leads on to Xfmr-Gen-001
Inspection by IAHJ
Install cover guards  or tape the terminations at Gen-001 and 64C-ADF-001 WAY F
Install all covers, and close all doors
Testing & Commissioning 

[AUG-24-22 Dan Williams] -DESO Review Required- DW
-MOP required
-Isolations to change to include B88 Line 1 feed and Bank 513 Line 1 feed- MP
-NETA testing required on ADF 64c-001 Way F feed to Transformer
-Additional Subcontractors required to include 3rd Party Testing, LBNL IOR
-ADF 64C-001 to be left under Administrative Lock if LP4632 is cleared until EVAP is executed
-Switch Tag will be required for isolations as listed- JH



[SEP-07-22 Jeff Hendrick] added dissipation device #1. Corrected equipment descriptor for Isolation #3 from 51-ADF-001 to 55-ADF-001. Added AF data for Isolation #1, 2, &3. Changed Isolattion #1 from breaker removed and ground cart inserted to breaker racked out and racking mechanism locked.

[SEP-14-22 Michael Rose] Added approved Switch Tag 4692-1 (establish) and SLD markup.

[SEP-15-22 mark liljefelt] Reviewed attached supporting documents.

FAC records for Arc Flash match information in the Isolation Checklist. 

[SEP-15-22 mark liljefelt] Reviewed with FATSE2 Supervisor Jeff Hendrick.

[SEP-15-22 Dan Williams] *notes added in Mandatory Special Instructions
LP-4691 08-17-2022   Hendrick, Jeff Electrical Reliability Services (Vertiv) Bank 215 Defered Maintenance 66 SCOPE of WORK:
1.Vertiv to Perform maintenance on SWGR 215A to include 8 Power Circuit Breakers and 1 x  Power Meter, metering, CPT, PT, and buss of SWGR 215A.

2. Test 4 spare breakers (on floor). Adjust breaker setting. LBNL will provide breaker setting. 

3. Install Spare breakers at MAIN, Cubicle #2, Cubicle #3, Cubicle #4 

4. Install QT2 Switch (AC-Pro) at MAIN, Cubicle #2, #3 and #4  door. Connect to the breaker. Test functionality. 

5. Furnish and Install communication RS485 Cable (Shielded twisted pair RS-485 cable, 0.33 mm2 (22 AWG) or larger), from MAIN, Cubicle #2, #3, #4 AC-Pro trip unit to (E) Ion Meter. 

6. Perform maintenance test on ADF-1-66 after cable replacement by LBNL electricians between 66-ADF-001 and Bank 215

7) Facilities electricians to replace jumper cables between 66-ADF-001 and Bank 215.

8) Vertiv to replace Ion meter in SWGR 215A
[AUG-17-22 mark liljefelt] Reviewed switchtag and SLD.

Made correction to AF value for SWGR215A in electrical isolation #1 to reflect 18.73Cal/cm^2@110".

[AUG-17-22 Rance Kilbourn] Reviewed approved Switchtag and attached single line drawing.
LP-4690 08-17-2022 HEC 1 (480V 1) Hendrick, Jeff LBNL FA Bank 62 deferred Maintenance 62 1) Facilities electricians to replace Heaters in Bank 66

2) Facilities electricians Install network cable between 2 cubicles in SWGR 66A and reset a control power breaker in the switch gear.

3) Facilities electricians to troubleshoot/repair the external handle linkage to the main breaker on B62 MCC M66A4A.

4) Facilities Electricians swap Breaker 7 in SWGR 66A with reconditioned and tested breaker. Breaker 7 is the main power source/feed to building 73. The SWGR 66A is located in building 62 Mechanical room. All work to be performed/executed in building 62 SWITCHBOARD 66A.

5) FATSE1 B62 Tesla Magnets (66A1A, 1B, 1C, 1D) W0278245 within SWGR 66A

6) FATSE1 tor to perform work under W0288465 to remove and replace B62 Hi-Bay EV Charger
[AUG-11-22 Michael Rose] Added #5 in scope description

[AUG-17-22 Michael Rose] Updated switch tag to Rev 2, minor edits.

[AUG-18-22 mark liljefelt] Added Scope Of Work #6 for FATSE2 to remove and replace EV Charger at B62 Hi-Bay.

FAC records for Arc Flash  match Isolation #1 information

[AUG-18-22 Rance Kilbourn] Reviewed switchtag and single line drawing. Confirmed job scopes match LOTO Safe Work Zone.
LP-4689 08-12-2022 HEC 1 (480V 1) Reynolds, Ben CAL NEVA B2 CXRO 133/137 B2 Once under LOTO, the contractor will relocate existing circuit 1 receptacle to another location within room 0137.   [AUG-08-22 Rance Kilbourn] Reviewed job with RI. Attached AF field label and panel schedule. Confirmed AF label matches FAC records. Panel schedule has a handwritten edit that will not impact LP-4689. 

[AUG-09-22 Rance Kilbourn] Added electrical isolation due to a shared conduit/junction box with affected circuit.

[AUG-15-22 mark liljefelt] FAC records for Arc Flash and panel schedule match field documents
LP-4688 08-16-2022 HEC 1 (480V 1) Benz, Michael IPS B77 -141 Overduty panel upgrade 77 Install Grounding bussing in overduty panels 72A5A, 72A5B, 85A, 85B [AUG-02-22 Michael Benz] Attachments are from LP4360 which we shut down in the beginning of the project

[AUG-16-22 Rance Kilbourn] Walked job with RI. Reviewed job scope, electrical isolation and PPE level. Confirmed AF label matches FAC Engineering records. Added single line mark-up drawing with isolations, photos and LOTO Safe Work Zone.

[AUG-16-22 mark liljefelt] FAC Records for Arc Flash match Arc Flash field label.

[SEP-13-22 Dan Williams] MOP for energization reviewed and uploaded.
LP-4687 08-15-2022 HEC 1 (480V 1) Gleason, David Crouse Construction 2nd Floor Pre-Action System - B91 B91 Tie in 3/4" conduit to the existing ceiling pull box E679A1A5A , above  Panel - E679A1A5A , pull #12 cu  wires  for 3 new circuits in empty/spare 3/4"conduit  chase which lands into Panel - E679A1A5A, terminate wires at the existing 3 single pole 20 amp/120 volt circuit breakers, as well as the neutral and grounding bars in Panel - E679A1A5A, circuits 14, 16, 18 which will supply new pre-action air supply, NOVEK and VESDA panels. Wires will be megger tested by QEW/Cal-Neva and torqued to specs (IAHJ will verify torqued terminations, and all 3 new circuits (14,16 and 18) will be left in the open position and locked out under LP-4696 after torque and megger testing is approved by the IAHJ. [AUG-08-22 Teilhard Valladares] Emailed RI to confirm all work is captured in the scope of work of the LOTO permit. Waiting for response. Sent email 8/5/2021.

[AUG-11-22 Teilhard Valladares] Field arc flash labels matches facilities database. RI adjusted scope and attached relevant photos. Scope of work matches listed isolation points. 

[AUG-16-22 mark liljefelt] FAC records for Arc Flash and panel schedule match field documentation.
LP-4686 08-01-2022 HEC 1 (480V 1) Paulovits, Gabor Infrequent Subcontractor CMS Water Jet Periodic Inspections, Maintenance, and Diagnostics. 77 Water Jet Preventive Maintenance and if needed Water Jet signals and controls troubleshooting and diagnostics. Access inside the CMS intensifier, CMS Machine Table, and CMS filtration electrical enclosure may be needed as part of troubleshooting.

 Any electrical work will be performed by a lab QEW.
[AUG-04-22 Teilhard Valladares] Equipment manual states that 15 minute wait time is needed after opening the equipment service disconnect. No label was installed at the electrical cabinet. Danger label for the electrical cabinet created. ESO recommended creating a complex LOTO procedure "since this equipment is programmatic and will remain in place (not a one time execution of LOTO) we will need to create CLP, review it and have it posted at the equipment." 
Working with vendor and Gabor for additional requirements and steps to safely shutdown the equipment.

[AUG-05-22 Teilhard Valladares] Troubleshooting and diagnostics requires the equipment to be energized. Vendor will need to access electrical cabinets for troubleshooting and diagnostics of low voltage controls signals. Will need additional evaluation on the electrical enclosure with ESO and determine allowable permitted vendor access inside the enclosure. 

[AUG-05-22 Teilhard Valladares] Added compressed air isolation per manufacturers recommendation.

[AUG-08-22 Teilhard Valladares] Field arc flash label matches facilities database.

[AUG-09-22 mark liljefelt] FAC records for Arc Flash and panel schedule match field documents and isolation checklist in this LOTO permit
LP-4682 08-18-2022 HEC 1 (480V 1) Samatua, Tipasa Crouse Construction B. 88 Boiler/Controls Replacement 88 Subcontractor to terminate three (3) new ALC Power feed to existing breakers.

Pull out/Demo any discovered abandoned conductors inside the panel.
[AUG-17-22 Rance Kilbourn] Walked job with RI. Reviewed job scope, electrical isolation and AF PPE level. Updated electrical isolation with E45A-TOP designation for the unlabeled circuit identifier per FAC Engineering suggestion. Confirmed AF label and panel schedule match current FAC Engineering records.

[AUG-17-22 mark liljefelt] FAC records for arc flash and panel schedule match field documents.
LP-4677 08-05-2022 HEC 1 (480V 1) Nakaki, Lindsay Goebel Paving/Grading 106769 - East Canyon Gas Switch Replacement B72E DISCONNECTING TEMPORARY GENERATOR AT B72 BANK 420A

- Disconnect temporary cables for temporary generator at Breaker #3 of Bank 420A.
- Remove chase at door of equipment at Breaker #3.
- Reinstall original cabling to Breaker #3.
- Torque/electrical inspection at Breaker #3.
- Seal chase.
[AUG-11-22 Rance Kilbourn] Reviewed job scope and electrical isolations. Attached email from FAC Engineering to reduce AF value to below 12 Cal/cm^2 (See attached). 

[AUG-15-22 mark liljefelt] Field verified scope
LP-4676 08-05-2022 HEC 2 (480V 2) Nakaki, Lindsay Goebel Paving/Grading 106769 - East Canyon Gas Switch Replacement B67 DISCONNECTING TEMPORARY GENERATOR AT B67 BANK 551A

- Disconnect temporary cables for temporary generator at Breaker #5 of Bank 551A.
- Remove cam-locks and chase at door of equipment at Breaker #5.
-Seal chase.
[AUG-11-22 Rance Kilbourn]  Reviewed job scope and electrical isolations. Confirmed AF PPE level matches FAC Engineering records.

[AUG-11-22 Teilhard Valladares] Field arc flash labels matches facilities database.
LP-4675 08-05-2022 HEC 1 (480V 1) Nakaki, Lindsay Goebel Paving/Grading 106769 - East Canyon Gas Switch Replacement B72E CONNECTING TEMPORARY GENERATOR AT B72 BANK 420A

- Install chase through back door of equipment.
- Disconnect existing cabling from load side of Breaker #3.
- Connect temporary cabling to load side of Breaker #3 and temporary generator.
- Torque/electrical inspection at Breaker #3.
[AUG-11-22 Rance Kilbourn] Reviewed job scope and electrical isolations. Attached email from FAC Engineering to reduce AF value to below 12 Cal/cm^2 (See attached). 

[AUG-15-22 mark liljefelt] Field verified scope.
LP-4674 08-05-2022 HEC 2 (480V 2) Nakaki, Lindsay Goebel Paving/Grading 106769 - East Canyon Gas Switch Replacement B67 CONNECTING TEMPORARY GENERATOR AT B67 BANK 551A

- Install chase and cam-locks at Breaker #5 of Bank 551A.
- Connect temporary cables and temporary generator at load side of Breaker #5, feeding normal power to B67.
- Torque/electrical inspection of Breaker #5.
[AUG-11-22 Rance Kilbourn] Reviewed job scope and electrical isolations. Confirmed AF PPE level matches FAC Engineering records.

[AUG-11-22 Teilhard Valladares] Field arc flash labels matches facilities arc flash database.
LP-4673 08-15-2022 HEC 1 (480V 1) Nakaki, Lindsay Goebel Paving/Grading 106769 - East Canyon Gas Switch Replacement B72E B72 MAIN BREAKER: PREVENT DOWNSTREAM AND BACKFEED OF POWER FROM BANK 420A TEMP GENERATOR

- Implementation of LP-4675 and associated scope of work
- Clearing of LP-4675 and associated scope of work
- Backfeed of power to Bank 420A for duration of outage via temp generator
- Implementation of LP-4677 and associated scope of work
- Clearing of LP-4677 and associated scope of work
[AUG-04-22 Rance Kilbourn] Field verified job scope, AF PPE level and electrical isolation. Added electrical isolation and confirmed AF PPE level matches FAC Engineering records. Attached remote switching and racking AF level as well as single line documentation.

[AUG-04-22 mark liljefelt] Verified that remote switching and an extension will be used for racking to reduce the AF level to below 12cal/cm^2 for manual racking requirements.
LP-4672 08-15-2022 HEC 1 (480V 1) Nakaki, Lindsay Goebel Paving/Grading 106769 - East Canyon Gas Switch Replacement B67 B67 SWGR551A Main Circuit Breaker: PREVENT DOWNSTREAM AND BACKFEED OF POWER FROM BANK 551A TEMP GENERATOR

- Implementation of LP-4674 to connect a temporary generator to SWGR551A CKT5
- Clearing of LP-4674 to allow the temporary generator to run and supply power to SWGR551A
- Backfeed of power to Bank 551A for duration of outage via temp generator
- Implementation of LP-4676 to de-energize and disconnect the temporary generator from SWGR551A CKT5 
- Clearing of LP-4676.
[AUG-02-22 mark liljefelt] Field verified scope of work .

Added Electrical Isolation #1, remote racking instruction.

Attached supporting documents

[AUG-02-22 mark liljefelt] Reviewed isolation #1 with ESO Dan Williams
LP-4671 07-01-2022 HEC 2 (480V 2) Patterson, Michael Goebel Paving/Grading Storm Drain Relocate for Centineal Centineal Bridge Remove conduit, conductors and devices from Centennial bridge which is impacting the nearby excavation project. The circuit is fed from disconnect 540B near EV charging station. [JUL-25-22 Michael Patterson] This disconnect is at the car charger across from Switch 5

[JUL-27-22 Rance Kilbourn] Walked job with ESO who escalated this work as an emergency since the conduit has been undermined by nearby excavation. Re wrote job scope due to the urgency of the situation.  Confirmed electrical isolation and determined there is no AF hazard associated with a single phase circuit feeding the transformer. Updated the electrical isolation to the upstream device to allow for LOTO Safe Work Zone to include the line side of the circuit disconnect.

[JUL-27-22 mark liljefelt] Walked job with ESO. 
LP-4670 07-25-2022 HEC 3 (non-electrical) Samatua, Tipasa Crouse Construction B. 88 Boiler/Controls Replacement 88 Subcontractor to connect N.G into new Boilers as part of the B. 88 Boilers/Ctrls Replacement  Project [JUL-28-22 Teilhard Valladares] Created label for the new valves.
LP-4669 07-27-2022 HEC 2 (480V 2) Benz, Michael Groundlevel Construction B6 - 1000 006 Work to be performed after LP-4669 has been implemented:

Ground Level contractor workers will install a wooden platform barrier over a trench section containing conductors fed from SWBD302A CKT4 and SWBD303A CKT2

[JUL-22-22 mark liljefelt] Field verified scope and isolation points with FATSE lead and RI.

Attached supporting documents.

FAC records for Arc Flash match field Arc Flash labels.
LP-4668 07-21-2022 HEC 1 (480V 1) Cereno, Fred Crouse Construction B50B Boiler flue Replacement 50B Demo and remove existing flue stack and exhaust fan.

To replace the existing flue pipe for BR-003-50B, BR-004-50B and BR-005-50B with new flue pipe and flue draft controls. (For BR#3 & #4 see LP-4656).

For BR#5: LOTO Panel #38A1A6A, Circuit #2. 

The following work is included:
- Demo the existing flue in the mechanical room;
- Demo the existing flue fan on the roof;
- Install new flue liner in the existing flue chimney;
- Install new double wall flue in the mechanical room;
- Install new modulating flue fan on the roof; 
- Connect to existing 120VAC power;
- Install new flue draft control panel in the mechanical room;
 - Connect to new 120VAC circuit;
- Install new modulating flue dampers on BR-003 and BR-004;
- Connect flue dampers to new 120VAC circuit;
- Start up and test system.
[JUL-19-22 Rance Kilbourn] Scope of work is unclear, please provide details of what will be done after the LOTO is established. This should not be the electrical isolation for the LOTO such as panel and circuit number. Placed on RI hold.

[JUL-20-22 Rance Kilbourn] Reviewed updated job scope, field AF label and panel schedule. Both panel schedule and AF match FAC Engineering records. Corrections to job scope look good. Added electrical isolation and AF PPE level. 

[JUL-20-22 mark liljefelt] FAC records for Arc Flash and panel schedule match field documentation
LP-4667 07-21-2022 HEC 2 (480V 2) Cereno, Fred Crouse Construction B50B Boiler flue Replacement 50B Remove and replace circuit breakers located within PNL38A11A: 

Replace Breaker 9 with HFD: 70A, 208V, 65kAIC, 3 pole

Replace Breaker 22 with HFD: 100A, 208V, 65kAIC, 3 pole

 Connect new flue control panel to Circuit #3.

Connect new flue dampers panel to Circuit #10.

Install new single pole 20amp breaker in Space#10

Install single pole 20amp for control panel Spare 15amp breaker (Circuit #3) for boiler flue actuators.
[JUL-19-22 mark liljefelt] Walked scope in the field. 

Added scope of work, added Electrical Isolation #1, added attachments for Arc Flash, panel schedule and single line drawing with mark up.

RI to confirm that scope, Isolation #1, and SLD with markup are correct.

[JUL-20-22 mark liljefelt] RI confirmed via email that the isolation and single line diagram are both correct.

FAC records for Arc Flash and panel schedules match field documents and labeling. Note that 38A panel schedule is located in Bluebeam B50B EO5

[SEP-07-22 mark liljefelt] Modified scope per RI request. Note that isolation point and safe work zone have not changed

[SEP-23-22 mark liljefelt] Per RI Fred Cereno field conditions have not changed

[SEP-30-22 mark liljefelt] Added scope of work per RI request. Isolation and electrical safe work zone is not affected by scope addition.
LP-4666 07-25-2022 HEC 1 (480V 1) Spier, William Michael Star Energy Management B67 East Stairwell Lighting Replacement 67 1. Replace 26 Wall Mounted Light Fixtures East Stairwell

2. MEG Test Related Wires in Conduits for Damage 

3. Visually inspect Wires for Insulation Damage at Fixture Boxes

4. Replace any wire found Damaged in conduits on this circuit.

5. If wires found Damaged from first fixture to home run to panel. A second LOTO will be requested at that time. 

6. LOTO release will not be requested During August 16 to 21, 2022 Outage.
[JUL-15-22 William Michael Spier] Please call me with Questions 707-628-2210

[JUL-19-22 Rance Kilbourn] Walked job and reviewed field AF label and panel schedule. Both match FAC Engineering records. Contacted RI and discussed the job scope. Advised to edit scope to include only work to be performed after the LOTO is established. Placed on RI hold corrections needed.

[JUL-20-22 William Michael Spier] On July 19, 22 Rance Kilbourn asked me to update the description to just what was involved with the work scope, I provided too much information. I updated the description 7-20-2022 

[JUL-20-22 Rance Kilbourn] Reviewed changes to the job scope. The information is clear and accurate. Updated with adding a Mandatory Special Instruction regarding the ZVV process. After speaking with the ESO he identified an opportunity to add some efficiency to the LOTO ZVV procedure. He concluded that when working on multiple points within a single electrical circuit, only the nearest point to the power source needs to be evaluated by the FAC electricians with a Zero Voltage Verification. The contractor will then be responsible for doing a First Exposure at each point there after along the circuit.

[JUL-25-22 mark liljefelt] FAC records for arc flash and panel schedule match field documents
LP-4664 07-12-2022 HEC 1 (480V 1) Hendrick, Jeff Electrical Reliability Services (Vertiv) Grizzly Substation Transfer Switch Maintenance 36A Transfer Switch Maintenance
A. Clean the ATS enclosure
B. Check the transfer switch contacts
C. Maintain transfer switch lubrication
D. Check all cable connections and re-tighten them
[JUL-10-22 Jeff Hendrick] I can't add more than one supporting document. I have other supporting documents to attach

[JUL-15-22 Rance Kilbourn] Reviewed attached SLD and sequence for establishing LOTO. Isolations are single phase and do not present an AF hazard.  

[JUL-15-22 Michael Rose] Reviewed MOP / LOTO Sequence. Clarified Step 7 that the PM to be performed is for TSW-1-36A.
LP-4663 07-12-2022 HEC 1 (480V 1)   Electrical Reliability Services (Vertiv) Grizzly Substation Battery Charger #2 36A Vertiv to perform Maintenance on Battery Charger #2 which will include a visual inspection and if needed tighten any loose connections. [JUL-13-22 Rance Kilbourn] Walked job with Jeff and reviewed panel schedule. No AF risk associated with  single phase panel E544B1A. Added  table 3.6a from the ESM regarding work on battery systems below 100VDC in the Mandatory Special Instructions.
LP-4662 07-12-2022 HEC 1 (480V 1) Hendrick, Jeff Electrical Reliability Services (Vertiv) Grizzly Substation Battery Charger #1 36A Vertiv to perform Maintenance on Battery Charger #1 which will include a visual inspection and if needed tighten any loose connections. [JUL-13-22 Rance Kilbourn] Walked job with Jeff and reviewed panel schedule. No AF risk associated with  single phase panel E544B1A. Added  table 3.6a from the ESM regarding work on battery systems below 100VDC.
LP-4661 07-13-2022 HEC 2 (480V 2) Reynolds, Ben Infrequent Subcontractor B59 HP Dormatech Work B59 Inspect the integrity of refrigerant lines and associated components for leaks, wear, and defects. LBL HVAC techs would open, and close, the unit for Dormatech to inspect. 
    
Validate and update, as necessary, the existing startup/operational parameters. Run diagnostics program to check for errors/issues. To do this Dromatech will likely need to connect their laptop to the unit.
[JUL-08-22 Teilhard Valladares] Field walked and verified scope with RI and HVAC shop. 

[JUL-11-22 Rance Kilbourn] Reviewed AF values and PPE level, panel schedule and single line for accuracy.
LP-4660 07-20-2022 HEC 1 (480V 1) Gleason, David Crouse Construction 2nd Floor Pre-Action System - B91 B91 Terminate wires at the existing 2 single pole 20 amp/120 volt circuit breakers  in Panel - E679A1A2A which will supply new NOVEK and VESDA Panels [JUL-15-22 Rance Kilbourn] Walked job with Rey Espino and reviewed job scope, field AF label and panel schedule. Both AF label and panel schedule match FAC Engineering records. Adjusted electrical isolation information to create an electrically safe work condition in the LOTO Safe Work Zone. The installation of new circuits in panel E679A1A2A will require a panel shutdown, switching the upstream OCD.

[JUL-15-22 mark liljefelt] FAC records for Arc Flash and panel schedule match field documents
LP-4659 07-22-2022 HEC 1 (480V 1) Samatua, Tipasa Crouse Construction B. 88 Boiler/Controls Replacement 88 Subcontractor to,

1. Replace the existing Building Main Gas Valve.
2. Modify existing boiler N.G line with regulators to feed new boilers. 
3. Replace an existing non-compliance valve with new valve and regulator 
4. Add a new isolation valve with a regulator to main N.G line for existing Domestic/Industrial Water Heaters. 

Note: Existing Main Building Gas Valve is an aging valve that is not fully closed to allow the performance work safely down stream.
[JUL-13-22 Teilhard Valladares] Purge procedure is under review.

[JUL-20-22 Teilhard Valladares] Fire Protective Services reviewed and approved the purge procedure. Fire protective services will be present to witness the work and will stop or authorize for work proceed if needed.
LP-4658 07-18-2022 HEC 1 (480V 1) Reynolds, Ben Crouse Construction B58A Electrical service upgrade B58A Address punchlist items.  Troubleshoot occupancy sensor on fixtures.  Confirm battery packs are connected on 3 bug eye light fixtures. [JUL-07-22 Rance Kilbourn] Walked job and reviewed field AF label and panel schedule. Both match current FAC Engineering records. Attached photos and updated the electrical isolation. 

[JUL-07-22 mark liljefelt] FAC records for Arc Flash and panel schedule match field documents
LP-4656 07-06-2022 HEC 1 (480V 1) Cereno, Fred Crouse Construction B50B Boiler flue Replacement 50B Demo and remove existing flue stack and exhaust fan.

To replace the existing flue pipe for BR-003-50B, BR-004-50B and BR-005-50B with new flue pipe and flue draft controls. 

The following work is included:
- Demo the existing flue in the mechanical room;
- Demo the existing flue fan on the roof;
- Install new flue liner in the existing flue chimney;
- Install new double wall flue in the mechanical room;
- Install new modulating flue fan on the roof; 
- Connect to existing 120VAC power;
- Install new flue draft control panel in the mechanical room; 
- Connect to new 120VAC circuit;
- Install new modulating flue dampers on BR-003 and BR-004; - Connect flue dampers to new 120VAC circuit;
- Start up and test system.
[JUN-27-22 Teilhard Valladares] Work on the flue stack and exhaust fan on the roof will require boilers 3 and 4 to be shutdown and LOTO'd to prevent accidental start-up. CO2 levels are too high when the boilers are running at the flue stacks. 

E-mailed Engineering and EHS for recommendation for switching the breakers feeding the boilers. Panel  38A11A is an overdutied panel.

[JUN-27-22 Teilhard Valladares] Will need a detailed scope on the demo of the flue stack and exhaust blower. Contacted RI for scope update. 

[JUN-28-22 Teilhard Valladares] Updated and added 50 BR 003 and 50 BR 004 to the electrical isolations.

[JUN-29-22 Teilhard Valladares] Added mandatory instructions. Included switching controls for PNL 38A11A (overdutied panel) per Engineering and EHS recommendations.

[JUN-29-22 Teilhard Valladares] Uploaded field arc flash labels and EHS report on the CO2 levels at the roof flue stack.

Waiting on the complete and detailed scope of work before going forward with the permit.

[JUL-06-22 Teilhard Valladares] See below for switching recommendations for PNL 3811A from Engineering and DESO.

Panel 38A11A: 
AF: 0.94 cal/cm2.
Available 3 phase short circuit: 39kA. 
The panel is deemed to be overdutied because of the breaker installed in slot 6,9 and 22. Breakers 2 and 4 have the appropriate KAIN rating of 65kAIC.

"I recommend to perform switching on breaker 2 and 4 with the appropriate PPE based on the voltage and incident energy. "

"Approved as described. No need for the 40 Cal suit in this case if you are not switching the under-rated circuit breakers."

[JUL-06-22 Fred Cereno] Added to SOW: To replace the existing flue pipe for BR-003-50B, BR-004-50B and BR-005-50B with new flue pipe and flue draft controls. 

The following work is included:
- Demo the existing flue in the mechanical room;
- Demo the existing flue fan on the roof;
- Install new flue liner in the existing flue chimney;
- Install new double wall flue in the mechanical room;
- Install new modulating flue fan on the roof; 
- Connect to existing 120VAC power;
- Install new flue draft control panel in the mechanical room; 
- Connect to new 120VAC circuit;
- Install new modulating flue dampers on BR-003 and BR-004; - Connect flue dampers to new 120VAC circuit;
- Start up and test system.

[JUL-07-22 Teilhard Valladares] Field walk scheduled at 50B mechanical room on 7/12/22.

[JUL-13-22 Teilhard Valladares] Field walked 7/12 with RI and subcontractors. Verified scope of work with RI and subcontractors. Per conversation with RI and subcontractors, 2 additional LOTO permits will be submitted. One for replacing the circuit breakers at panel 38A11A and running new circuit for the control panel and flue dampers. The second permit will be for Boiler 5, boiler 5 share the same exhaust ducting as boiler 3 and 4. Boiler 5 is the domestic hot water boiler that serves the building.  RI and engineering are planning to temporarily re-route the exhaust ducting for boiler 5 so building can continue to have domestic hot water.

[JUL-13-22 Teilhard Valladares] If modification is needed for the conductors to the new blower motor on the roof. LOTO isolation point will move from the switch to the breaker. This will affect FPU-2A-50B/ Microstar per panel schedule.

[JUL-14-22 mark liljefelt] Field verified isolation point. Note minor AF discrepancy between field label and FAC records for PNL38A11A. AF PPE levels are not affected.
LP-4655 08-01-2022 HEC 1 (480V 1) Nakaki, Lindsay Goebel Paving/Grading 106769 - East Canyon Gas Switch Replacement 74, 84, & 85 - Disconnect and remove existing SF6 gas switches GS-1-EC and GS-2-EC (removal and disposal can happen after LOTO is cleared, only disconnecting requires LOTO)
- Install T-Bodies between main feed and loads of existing switches in order to bypass existing gas switches
- Inspection/report for t-bodies installation
- Lift 12kV cables and reinstall after VLF testing
- Re-rack existing conductors inside EMH 163
- Scanning/Core drilling into EMH 163 after conductors in EMH 163 have been re-racked
- Install conduits and rebar cages and connect with previously poured ductbank to EMH 163
-NETA Testing by Vertive
[AUG-03-22 Rance Kilbourn] Reviewed attached construction drawings and mark-ups. Confirmed AF PPE data matches FAC Engineering records. Attached single line markup drawing with LP-4618 isolations.

[AUG-09-22 Dan Williams] MOP reviewed and accepted without further comment. Uploaded.

[AUG-11-22 Rance Kilbourn] Reviewed attached switch tags and AF PPE levels. Confirmed AF values match FAC Engineering records. 

[AUG-11-22 mark liljefelt] FAC records for Arc Flash and volts matches information in the Isolation Checklist.

The attached contractor MOPS have been reviewed and approved by the LBL Division ESO
LP-4654 07-29-2022 HEC 3 (non-electrical) Samatua, Tipasa Crouse Construction B. 88 Boiler/Controls Replacement 88 This LOTO is required after new Boilers are terminated and all inspections are completed. This LOTO will allow the Subcontractor to continue with terminating of conduit and conductors in the Equipment (Boilers).

[AUG-09-22 Rance Kilbourn] Walked job with RI and reviewed job scope and electrical isolations. Confirmed panel schedule matches FAC Engineering records. The AF label (13.3 Cal/cm^2) is higher than the FAC Engineering records (13.28 Cal/cm^2) which is probably a software rounding issue. Added AF PPE levels to the electrical isolation table.

[AUG-09-22 Teilhard Valladares] Field arc flash labels are .02 higher than the facilities database.
LP-4652 06-22-2022 HEC 1 (480V 1) Cota, David IPS B84 Coil leaks b84 Repair leak on the heating hot water line in 355C by repiping the line after the local heating hot water isolation valves. [JUN-22-22 Teilhard Valladares] W0288430 was  created to check and verify that the heating hot water valves will hold for the LOTO and repair work. PMT's closed  the local supply and return valve and drained the coils. Verified that the valves will hold.

[JUN-22-22 Teilhard Valladares] Heating coil is labeled HC34  in the drawings. Drawing labeled M233.

[JUN-22-22 Teilhard Valladares] Attached photos and drawings of heating hot water valves. Can be drained at the heating hot water supply piping (strainer).
LP-4651 06-27-2022 HEC 3 (non-electrical) Sears, Chris Star Energy Management B74 Interior Lighting B74 Star will install new drivers to work with the LED lights and Watt Stopper Controls [JUN-23-22 Rance Kilbourn] Reviewed field AF label and panel schedule. AF values are different by .01 Cal/cm^2 from FAC Engineering records most likely a software rounding issue. Panel schedules match FAC Engineering records. Confirmed job scope matches LOTO Safe Work Zone. Attached photos of AF labels and panel schedules. 

[JUN-23-22 Teilhard Valladares] Difference of .01 for panel 47A5A57A Field arc flash label and facilities database. PPE requirements will still be the same. Scope matches isolations.
LP-4650 06-27-2022 HEC 3 (non-electrical) Sears, Chris Star Energy Management B74 Interior Lighting B74 Star will install new drivers to work with the LED lights and Watt Stopper Controls [JUN-23-22 Rance Kilbourn] Reviewed field AF labels and panel schedules. Both match FAC Engineering records. Attached photos of AF labels and panel schedules. Confirmed job scope matches LOTO Safe Work Zone

[JUN-23-22 Teilhard Valladares] Field arc flash label matches facilities database. Isolations matches scope of work.
LP-4649 06-29-2022 HEC 3 (non-electrical) Sears, Chris Star Energy Management B74 Interior Lighting B74 Star will install new drivers to work with the LED lights and Watt Stopper Controls [JUN-23-22 Rance Kilbourn] Reviewed field AF label and panel schedule. AF label matches FAC Engineering records. Panel schedule has handwritten notes that are not reflected in FAC Engineering records. 

[JUN-23-22 Teilhard Valladares] Field Arc flash label matches facilities database. Isolations matches scope of work.
LP-4648 07-18-2022 HEC 1 (480V 1) Hendrick, Jeff Electrical Reliability Services (Vertiv) Grizzly Sub 3 year maintenance, Line 2 036A Perform the listed visual inspection including cleaning, mechanical, and electrical maintenance testing to all electrical equipment specified below in accordance with ANSI/NETA MTS.

115kV BANK 2 / LINE 2 Switchyard equipment to include:

A)    High Voltage SF6 Breakers 152 and 142)
B)    High Voltage Air Switches  153, 165, and 143-2
C)    Insulators and Bushings
D)   Metering Transformers CT/PT-2
E)    Liquid-filled Transformers, 115kV-12.47kV  (Bank-2)
F)    Protective Relays, Electromechanical, Solid-State, and Microprocessor-Based
G)   Voltage Transformer VT-L2
H)   Station Transformer STA SERV TR 2
I)     Line 2 Neutral Resistor


Facilities Electricians to replace lamps/Ballast in yard lighting fixtures
[JUL-15-22 Michael Rose] Attached signed switch tag, isolations and dissipation locations create LOTO safe zone for described scope.

[JUL-15-22 Rance Kilbourn] Reviewed attached switch tag and single line mark-up drawing. Reviewed Electrical isolations and AF PPE levels.
LP-4647 06-21-2022 HEC 3 (non-electrical) Cota, David IPS B84 Coil replacement B84 Remove and replace existing heating hot water and chilled water coils and valves in lab 220. [JUN-21-22 Teilhard Valladares] Field walked with RI for scope and work clarification. Field walked with PMT to verify valve location in the 2nd floor Men's restroom.

[JUN-21-22 Teilhard Valladares] Uploaded 2nd floor center section HHW and CHW diagram.

[JUN-21-22 Teilhard Valladares] Heating and cooling coils are labeled HC 24 and CC 24 in the 2nd floor mechanical plan.
LP-4646 07-11-2022   Hendrick, Jeff Electrical Reliability Services (Vertiv) Grizzly Sub 3 year maintenance, Line 1 036A Perform the listed visual inspection including cleaning, mechanical, and electrical maintenance testing to all electrical equipment specified below in accordance with ANSI/NETA MTS.

115kV BANK 1 / LINE 1 Switchyard equipment to include:
A)    High Voltage SF6 Breaker 132
B)    High Voltage Air Switches 151, 155, and 133-2
C)    Insulators and Bushings
D)   Metering Transformers CT/PT-1
E)    Liquid-filled Transformers, 115kV-12.47kV  (Bank-1)
F)    Protective Relays, Electromechanical, Solid-State, and Microprocessor-Based
G)   Voltage Transformer VT-L1
H)   Station Transformer STA SERV TR 1
I)     Line 1 Neutral Resistor

Facilities Electricians to replace lamps/Ballast in yard lighting fixtures
[JUL-08-22 Michael Rose] Attached approved switch tag. Isolations and ground points correct for scope. Confirmed w/ FAEN no induction hazard present after Line 1 de-energization.

[JUL-08-22 Rance Kilbourn] Reviewed electrical isolations, AF PPE level, attached switch tag and single line drawing.

[JUL-08-22 mark liljefelt] Reviewed isolation points and attachments.
LP-4645 06-24-2022 HEC 3 (non-electrical) Patterson, Michael Crouse Construction B70A Abergel B70A Replace Circuit 15 - 120V  to a duel Circuit, circuits 10/12, 208V, Remove 120V  3/12 Cord Drop and replace with 208 4/12 Cord drop.   Remove the common wire from the raceway and then pull a new hot leg into the raceway.  Circuit 15 will become a spare and circuit 10/12, is an existing spare breaker, will be the new feed for the Freezer [JUN-29-22 Rance Kilbourn] Walked job with RI on 6/29/2022. Advised RI to update job scope by removing confusing language and describe what will be done after LOTO is established. Reviewed the field AF label and panel schedule. AF value has not been updated in FAC Engineering record. Equipment has been EVAP and is energized. Attached photo and single line markup drawing.

[JUN-30-22 Teilhard Valladares] Arc flash label is installed at E31A18A5D  enclosed circuit breaker. Arc flash is not listed in the facilities database.
LP-4644 06-22-2022 HEC 3 (non-electrical) Benz, Michael   B77 - 161 Metrology Project 77 Replacement of interiors on 6 existing over duty electrical panels. PNL 72A6A & PNL 72A6B, 87A, 87B, 87C, 87D. LOTO will be used with EVAP  to reenergize all panels. All Inspection and testing will be completed prior to energizing. [JUN-23-22 Rance Kilbourn] Walked job and reviewed field AF label and single line drawing. Both match the current FAC Engineering records. Attached photos of AF label, single line drawing and 72A switchboard.

[JUN-24-22 Teilhard Valladares] Field arc flash label matches facilities database. Isolation listed matches scope of work per single line drawing. 
Vesda smoke detection system serving the clean room is affected by this LOTO.  The fire alarm shop will need to be notified.
LP-4643 07-13-2022 HEC 3 (non-electrical) Benz, Michael IPS B77 - 161 Metrology Project 77 Install new breaker in panel  84B CKT-17 for new degreaser equipment located outside. The end state will be all conductors terminated and breakers locked open under an administrative lock. All circuits will remain in this state until the EVAP can be performed at a later date. [JUN-23-22 Rance Kilbourn] Walked job and reviewed field AF label and panel schedule. Both match current FAC Engineering records. Added photos of AF label, panel schedule and single line drawing.

[JUN-24-22 Teilhard Valladares] Field arc flash label matches facilities database. Isolation matches scope of work.

[SEP-20-22 mark liljefelt] RI verified that conditions have not changed. LP-4643 extended
LP-4642 06-24-2022 HEC 3 (non-electrical) Reynolds, Ben IPS B50 4030/4036 renovation B50 This permit will be related to LOTO permit 4641.  This will lock out the newly installed breakers in positions 19,21,23 for room 4036 and positions 22,24,26 in room 4030.  These 3 pole breakers will stay locked out until the EVAP is approved.  Once approved, LOTO will be released and the new breakers will be energized. [JUN-21-22 Rance Kilbourn] Walked job and reviewed field AF label and panel schedule. Panel schedule has several handwritten edits that will need to be turned in at the end of the project to FAC Engineering. AF label is current and matches FAC Engineering records. Updated the electrical isolation descriptions.

[JUN-21-22 Teilhard Valladares] Arc flash label matches database.
LP-4641 06-24-2022 HEC 3 (non-electrical) Reynolds, Ben IPS B50 4030/4036 renovation B50 Once the panel is locked out, Taft will install 2 new 20A 3 pole breakers that will feed new cubicle furniture in room 4030 and 4036.  [JUN-21-22 Rance Kilbourn] Walked job reviewed field AF label and panel schedule. The panel schedule has a handwritten edit that does not affect this LOTO permit, the AF label is current and matches FAC Engineering records. Added Mandatory Special Instructions for switching panel 25A6A which is labeled OVERDUTIED.  

[JUN-21-22 Teilhard Valladares] Field arc flash matches database and switching controls listed in the mandatory instructions for overdutied panel.
LP-4640 07-29-2022 HEC 3 (non-electrical) Samatua, Tipasa Crouse Construction B. 88 Boiler/Controls Replacement 88 Subcontractor to terminate (Final connection) all electrical conduits and conductors to new equipment (VFDS/GP) as part of the B. 88 Boilers/Controls Replacement Projects. [AUG-09-22 Rance Kilbourn] Walked job with RI  and reviewed job scope and electrical isolations. Confirmed field AF label and panel schedule matches FAC Engineering records. Added AF PPE levels in the electrical isolation table. 

[AUG-09-22 Teilhard Valladares] Field arc flash label matches facilities database.
LP-4638 08-15-2022 HEC 1 (480V 1) Patterson, Michael CAL NEVA B66 VFD Upgrade B66 Ensure LOTO 4544 has been cleared and locks removed from PNL-001-66 CB6 in B66
Open doors of MCC215A5A Cubicle 19 and 21
Verify First Exposure ZVV- CalNeva
Remove Starters and  Switches and lights on doors in both Cubicles
Removing starters will remove the Auto function and place into Manual
Install KO seals in remaining holes of each cubicle
No IOR Inspection Required
No Mode 2 work or commissioning
Remove Starters and Controls, then plug opening in the doors of MCC Buckets 19 & 21
[AUG-02-22 mark liljefelt] Field verified scope.

Made changes to Electrical Isolation 1 to capture AF & shock hazard at location of first exposure/supplemental ZVV.

Attached SLD showing LP-4638 LOTO Safe Work Zone.


[AUG-03-22 Rance Kilbourn] Reviewed Single line drawing and AF PPE level. Confirmed AF value matches FAC Engineering records. Confirmed electrical isolation listed in LP-4618 creates an electrically safe work environment and LOTO Safe Work Zone.
LP-4637 11-03-2022 HEC 1 (480V 1) Spier, William Michael IPS QIS Cluster Tool 67 The existing 557A CKT-10 receptacle feeding the evaporator will be relocated to a new location inside of room 2303D. The existing conduit and box will be removed and the wire will be pulled back to a junction box above the clean room. The final circuit connection and EVAP will be completed during the planned electrical outage on 11/11/2022. [NOV-01-22 Rance Kilbourn] Walked job with RI and reviewed job scope, electrical isolation and AF hazard. Panel schedule and AF label match FAC Engineering records. Job scope unclear, include what will be done after the LOTO is established. Changed job scope language. RI will need to confirm changes prior to approval.

[NOV-01-22 Rance Kilbourn] RI confirmed changes made to job scope. Attached panel schedule and AF label.

[NOV-01-22 mark liljefelt] FAC records for panel schedule and Arc Flash match the field panel schedule and AF label
LP-4636 06-21-2022 HEC 1 (480V 1) Patterson, Michael Crouse Construction B70A Abergel 70A Remove the old Barrington control wires from the FPUs, that have been replaced with the new ALC FPU [JUN-21-22 Michael Patterson] Shut down will only be for an hour or so

[JUN-29-22 Rance Kilbourn] Walked job with RI on 6/29/2022. Reviewed field AF label and panel schedule. Confirmed both match current FAC Engineering records. Updated electrical isolations and reviewed attached email. 

[JUN-30-22 Teilhard Valladares] Field arc flash labels matches the facilities database.

[SEP-20-22 mark liljefelt] Verified scope on 09/15. Requested and received new C1/C2 panel schedules.
LP-4634 08-16-2022 HEC 2 (480V 2) Patterson, Michael Perma-Fix ERRG 12 KV Relocate N/A 1.    Ring out (E) Cables from MH 186 to MH 191
2.    Scan Manholes 186 & 191 for rebar layout
3.    Core Manholes 186 & 191
4.    Finish Conduits & Rebar Cages to 186 & 191
5.    Bring 4/0 Ground into EMH186 and EMH191 and then terminate into existing bonding system inside vault.
6.    Grouting Conduits
7.    Pull wire from MH 242 to MH 191
8.    Pull Wire from Pull Box into MH 186
9.    Make up Elbows in Manholes 186, 242, & 191
10.    Connect and torque Elbows in MH 242
11.    Secure/Anchor Wires in MH 242
12.    Test Medium Voltage Cable (A109 and A113) to NETA Requirements
13.    Ring out Cables (A109 and A113)from MH 186 to MH 191
14.    Make Final Connection conductor termination at A109,  A113, A501and A502 and Torque
15.    Secure/Anchor wires in MH 186 & 191
16.    Remove (E) wire from MH 186 to MH 191
17. Refer to Rosendin Electric MOP "MOP for 12kv shutdown Switc 5 feeder Re-route" (Revision 4) for complete scope of work.
[JUL-27-22 Michael Patterson] This is part of the ECSD - LBNL will be writing the switch tag and also have these isolation points on the Master LP

[JUL-29-22 Dan Williams] Updated Scope of Work, EMH Identifiers and changed Isolation Point #1 to Master LOTO

[AUG-03-22 Michael Rose] All dissipation devices removed. These will be captured on LP-4618.

[AUG-09-22 Dan Williams] MOP reviewed and accepted without further comment. Uploaded.

[AUG-11-22 mark liljefelt] FAC records for Arc Flash and volts match Isolation Checklist information. 
LP-4618 (Isolation #1 for this LOTO permit) has been approved.

[AUG-11-22 Rance Kilbourn] Reviewed electrical isolations and AF PPE levels. Confirmed LP-4618 switch tag includes steps for LP-4634.
LP-4633 06-14-2022 HEC 1 (480V 1) Spier, William Michael Groundlevel Construction B70 Gas Line Repair 70 Repair Leaking Pipe (Under Ground Gas Line)
Base Scope of Work (New Riser & Tee into Building): 
Provide labor, material, and equipment necessary to provide new valve & bypass at parking lot gas cluster & 
new service into B70 in accordance with the documents provided by LBNL. Scope of work to include: 
Division 33 - Utilities 
• (1) Mobilization 
• Abatement services & controls for asbestos containing building exterior, lead containing paint on gas 
piping & lead containing soil at building corner 
• Excavate at building corner for new riser and gas pipe wall run. Abatement crew to excavate top 6” of 
contaminated soil. Ground Level to excavate to utilities once all contaminated soil is removed. 
• Purge Pipe of Combustable fuel gas following the purge plan.
• Install new 3” MDPE to Steel riser at building, new 3” transition from existing steel to MDPE – 
(Saturday) 
• Run 3” Pipe Up Wall and Mount – (Saturday) 
• Connect to Existing Steel threaded Tee (Turn Tee Down) – (Saturday) 
• Cap all abandoned pipes and clean up in building (Saturday) 
• Patch & paint penetrations at building exterior 
• Coordination and management of new plumbing to building exterior 
• Backfill for new connection at building corner
• Saw cut and demo A/C for new gas line
• Cap all abandoned pipes
• Backfill for new valve at gas cluster
• Reweld connection for service to building
• Excavate from new valve to building 70
• Run new 3” Line from installed valve to new riser at Building
• Pressure test and connect new line. 
• Tie in new gas lateral
• Purge pipe of air, charge with natural gas.
• Backfill and pave trench

[JUN-10-22 Teilhard Valladares] Set up field walk with parties involved on 6/14/2022.

[JUN-13-22 Teilhard Valladares] Uploaded Facilities Natural Gas System Shutdown/Start-up procedure in attachments.

[JUN-16-22 Teilhard Valladares] Field walked 6/14/2022. RI will send latest purge plan with HEC and EHS.

[JUN-24-22 Teilhard Valladares] Scope of work will need to be updated based on new discoveries by the Construction group. 

[JUL-07-22 Teilhard Valladares] LOTO Reviewed and approved by Engineering, Fire Protection Services, EHS. 

Scheduled field walk on 7/7 with Pmt's, Construction group, Fire Protection, EHS, and WPC to verify scope,purge plan, and isolation point. 

[JUL-08-22 mark liljefelt] Attended job walk on 07/07.  Reviewed attachments. Note that Fire Protection,Department Head FAC Engineering, and Department Head FAC U&M have reviewed and approved the Natural Gas System Shutdown / Startup Procedure.
LP-4631 06-17-2022 HEC 1 (480V 1) Reynolds, Ben CAL NEVA 133/137 CXRO B2 This will be related to LP-4600.  A new 80A 3 pole breaker will be installed in slot 3 under LP-4600.  This permit will place LOTO on the new breaker until the EVAP is approved.  Once approved, the LOTO will be released.    [JUN-10-22 Rance Kilbourn] Reviewed electrical isolation and AF PPE level. Confirmed both match FAC engineering drawings.
LP-4630 06-11-2022 HEC 1 (480V 1) Hendrick, Jeff Electrical Reliability Services (Vertiv) Switchgear 49A breaker replacement   This LOTO permit is to be Established in the event that Vertiv could not complete the breaker replacement in Switchgear 49A during the schedule SW-A4 Bus 2 maintenance on 6/11/2022. Vertiv scope is to replace the Main breaker and two feeder breakers in Switchgear 49A and test. [JUN-09-22 Michael Rose] Switch tag contains steps to release 4606 and establish 4630.

[JUN-10-22 Rance Kilbourn] Reviewed attached switch tag, electrical isolations and AF PPE levels 

[JUN-10-22 mark liljefelt] Reviewed switch tag & FAC records for Arc Flash values
LP-4629 06-09-2022 HEC 1 (480V 1) Benz, Michael IPS B77 - 161 Metrology Project 77 •    Install New  BREAKER IN E88A CKT-6 TO TIE IN NEW BMS SYSTEMS IN RM 239 & RM 161. [JUN-10-22 Rance Kilbourn] Reviewed field AF label and panel schedule. PS_E72A9B1A5A has a handwritten edit not related to this LOTO. AF label matches current FAC Engineering records. 

[JUL-07-22 mark liljefelt] FAC records for panel schedule and Arc Flash match field documents, aside from handwritten note located on field panel schedule that is not related to this LOTO isolation point.

[SEP-20-22 mark liljefelt] Field verified that conditions have not changed.
LP-4627 06-27-2022 HEC 1 (480V 1) Benz, Michael Groundlevel Construction ALS LN Tank Replacement 006 LOTO Circuits for demo of LN2 Tank [JUN-01-22 mark liljefelt] Walked scope in the field, attached supporting documents.

I made changes to the Electrical Isolation worksheet.

I marked up the attached electrical drawings to show the Electrical Isolation changes and to note two apparent mistakes is the drawings. 

RI to verify that the marked up condition is correct, and that the changes made to the Electrical Isolations are also correct.

[JUN-02-22 Michael Benz] Approved changes.

[JUN-28-22 Teilhard Valladares] Gravity hazard will be addressed with the critical lift plan.

[JUN-28-22 Rance Kilbourn] Walked job and reviewed field AF label and panel schedules. Confirmed AF labels are out of date but still match current FAC Engineering records. Panel schedules have handwritten edits that match current FAC records.

[JUN-28-22 Teilhard Valladares] Field arc flash label for PNL 334A matches facilities database. Field arc flash label for PNL 304A5A is higher than the facilities database by .4 and 1" on the AFB but the PPE requirements is not affected by the difference.
LP-4626 06-03-2022   Jew, Ernie Eaton Electrical UPS Services Building 59 Eaton UPS 2 PM 59 Perform P.M. on UPS 2 and batteries. Perform fan and capacitor upgrade  
LP-4625 06-03-2022   Jew, Ernie Eaton Electrical UPS Services Building 59 Eaton UPS 1 PM 59 Perform P.M. on UPS 1 and batteries. Perform fan and capacitor upgrade  
LP-4623 06-16-2022 HEC 1 (480V 1) Spier, William Michael IPS B67 Cluster Tool B67 -At PNL 557A – Install new (1) 150amp breaker w/hardware and a 2” conduit with cable out of the top of the panel to a junction box. -  CIRCUIT 21

-At PNL 557A – Install new (1) 100amp breaker and a 1 1/4” conduit with cable out of the top of the panel to a junction box. -  CIRCUIT 15

At PNL 556A4A - Install new 60amp  Circuit 8

-At PNL 557A4A  – Install new (1) 20amp (CIRCUIT 22) & (3) 30amp new breaker (CIRCUIT 11, 28, 34) and a new (2) 1” conduit with cable out of the top of the panel to a junction box.

-At PNL 557A9A  – Install new (2) 20amp (CIRCUIT 11, 27) & (2) 30amp (CIRCUIT 15, 21) & new breaker and a new  (3) 1” conduit with cable out of the top of the panel to a junction box.

-At PNL 557A3A - Install new 20amp (CIRCUIT) 24
 
 
These circuits will have an administrative lock  on circuits until LPs are issued
[MAY-31-22 mark liljefelt] Equipment descriptors are not correct, confirm that equipment descriptors should be PNL557A4A and PNL557A9A.

Attachment "LP Electrical Drawings" shows work that is outside of the Electrical Safe Work Zone created by this LOTO permit. Please clarify.

[JUN-02-22 Michael Patterson] Mark, New single Lines are coming will upload when I receive.  Meantime I will put permit on hold

[AUG-10-22 Teilhard Valladares] Field arc flash labels matches facilities database. Scope of work matches isolations. 

[AUG-10-22 Teilhard Valladares] Uploaded keyplans and listed scope of work with locations of work area and isolation points.

[AUG-11-22 mark liljefelt] FAC records for Arc Flash and panel schedules match field documents
LP-4622 06-14-2022 HEC 1 (480V 1) Sears, Chris California Boiler Works Boiler Maintenance B85 Review fault history for potential troubleshooting.
LOTO Unit for safe inspection BR-002, PHW-300, 74445
Isolate and drain boiler
Remove covers for inspection
Remove burner components for inspection + cleaning
Replace flapper valve
Inspect + clean combustion chamber
Remove all old gasket material
Replace burner components using new gaskets
Replace previously removed burner components using new gaskets
Flush waterside of heater
Remove and inspect temp sensors and LWCO probes
Fill boiler and check for leaks
Remove and clean all condensate components (if applicable)
Re-fill condensate neutralizers if applicable
Perform operational test
Perform combustion calibration of water heater
Provide combustion report and service report to customer
[MAY-26-22 Teilhard Valladares] Field walked with RI and later with PMT lead. Heating Hot Water Supply piping is mislabeled. Will create a work order to remove Heating Hot Water Return label and replace with HHWS label.

[MAY-26-22 Teilhard Valladares] Created work order W0286161 to correct label on the heating supply line.

[MAY-26-22 Teilhard Valladares] Field arc flash label matches facilities database.

[MAY-31-22 Teilhard Valladares] Attached fulton boiler typical wiring diagram for reference.

[JUN-01-22 Teilhard Valladares] Field walked with High Voltage Lead.

[JUN-09-22 mark liljefelt] FAC records for Arc Flash and panel schedule match field documents
LP-4621 06-13-2022 HEC 1 (480V 1) Sears, Chris California Boiler Works Boiler Maintenance B85 Review fault history for potential troubleshooting.
LOTO Unit for safe inspection BR-001, PHW-500, 74623
Isolate and drain boiler
Remove covers for inspection
Remove burner components for inspection + cleaning
Replace flapper valve
Inspect + clean combustion chamber
Remove all old gasket material
Replace burner components using new gaskets
Replace previously removed burner components using new gaskets
Flush waterside of heater
Remove and inspect temp sensors and LWCO probes
Fill boiler and check for leaks
Remove and clean all condensate components (if applicable)
Re-fill condensate neutralizers if applicable
Perform operational test
Perform combustion calibration of water heater
Provide combustion report and service report to customer
[MAY-26-22 Teilhard Valladares] Field walked with RI and later with PMT lead. Heating Hot Water Supply piping is mislabeled. Will create a work order to remove Heating Hot Water Return label and replace with HHWS label.

[MAY-26-22 Teilhard Valladares] Created work order W0286161 to correct label on the heating supply line.

[MAY-26-22 Teilhard Valladares] Field arc flash label matches facilities database.

[MAY-31-22 Teilhard Valladares] Attached fulton boiler typical wiring diagram for reference.

[JUN-01-22 Teilhard Valladares] Field walked with High Voltage lead. 

[JUN-09-22 mark liljefelt] FAC records for Arc Flash and panel schedule match field documents
LP-4620 06-01-2022 HEC 1 (480V 1) Patterson, Michael CAL NEVA B. 66 VFD Installation 66 Contractor to tap E Power from E controller to run the new Controller for VFD s 19 & 21 [MAY-25-22 Michael Patterson] Duplicate isolation point as 4548, walked with Rance and T

[MAY-26-22 Rance Kilbourn] Walked job on 5/26/22. Reviewed field AF label and panel schedule match current FAC Engineering records. Confirmed job scope matches LOTO Safe Work Zone. 

[MAY-26-22 mark liljefelt] FAC records for Arc Flash and panel schedule match field documents

[AUG-19-22 mark liljefelt] Per RI, LP-4620 was never established & conditions have not changed.

Re-verified that FAC records for Arc Flash and panel schedule match field documents
LP-4619 05-25-2022 HEC 3 (non-electrical) Patterson, Michael Star Energy Management Sitewide Lighting 59 Remove existing exterior lighting fixtures and replace with the new LED sitewide lighting fixtures.  Please see attached B59 Lighting PDF for the fixtures to be replace [MAY-23-22 Michael Patterson] Panel U590A4A was turned into Panel UE590A8A4A during the N9 project in order to put lighting circuits on backup lighting

[MAY-26-22 Rance Kilbourn] Walked job on 5/25/22. Reviewed field AF label and panel schedule. The AF label is a non LBNL standard label, but the date and AF information matches FAC Engineering records. The panel schedule has handwritten edits, FAC Eng has been notified to provide an updated panel schedule. The attached construction drawing and single line drawing has no mark up information or notes indicating the area to be worked on under this LOTO permit request. Notified the RI to update the attachments with information to delineate the work area job scope. Placed on RI Hold. 

[MAY-26-22 Rance Kilbourn] Attached email response from RI regarding job scope and attached documents. LOTO application still on hold waiting for additional information and updated job scope.

[JUN-20-22 Michael Patterson] Removed isolation points not to be used, added PDF of lights to be replaced from vendor

[JUN-22-22 Rance Kilbourn] Attached updated panel schedule. Reviewed attached site drawing with mark-ups. 

[JUN-22-22 Teilhard Valladares] Field arc flash labels matches facilities database.
LP-4617 05-20-2022   Grounds, Jeffrey Cray Computers N9 Upgrade 59 Troubleshoot low input voltage at PDU  
LP-4616 06-01-2022 HEC 1 (480V 1) Chang, Shawn Crown Moving Company Cubicle panel install 978 Crown will tear down the office reception area cubicle panels and replacing them with taller cubicle panels.  
LP-4615 06-13-2022 HEC 1 (480V 1) espino, rey Goebel Paving/Grading Bayview Generator B91U Contra Costa will be installing a new transformer and 208/120V panelboard outside the MUP 91U building. 
They will be getting the feed to that transformer from panel E671A11A1A9A by adding a new 150A breaker and connecting a set of 1/0, 3 phase.  Breaker will be installed into ckt 27. 
They will need to have DP E671A11A1A circuit 1 LOTO'd to complete the connection. Installation of new panel, transformer and disconnect will be complete prior to establishing this LOTO.  EVAP will be approved prior to establishing this LOTO and completing the final connection.  Upon successful installation and inspection of the new 150A breaker and 1/0 cables, CCE will move into completing the EVAP MOP of the new equipment verification.,
[MAY-20-22 Rance Kilbourn] Walked job with RI on 5/20/22. Reviewed the local AF label and panel schedule. Both match FAC Engineering records. Requested RI to add circuit information feeding the new equipment and condition of new circuit breaker to allow release of this LOTO permit.

[MAY-26-22 Rance Kilbourn] Placed in Facilities Hold (RI Corrections Needed) until circuit information and final state to release this LOTO is added.

[JUN-28-22 rey espino] Added ckt 27 for the location of Breaker in panel 671A11A1A9A. Added new single line from contractor showing work. Added verbiage about the process establishing this LOTO to complete work once EVAP has been approved. 

[JUL-06-22 Rance Kilbourn] Reviewed attached single line mark up drawing and additional job scope language. 

[AUG-16-22 mark liljefelt] Updated the Electrical Isolation checklist per the new Temporary Black Start 2022 Arc Flash labels.

Confirmed with FAC Electrical Engineering that the new Arc Flash  values will be used for LOTO activities.
Results Page:    1  2  ...  13  14    
Report Name *
Description
Reports and Charts Panel
Each table has a panel listing its reports and charts, organized in groups.
Please wait while your new report is saved...
Field label
Column heading override
Justification
What does auto mean?
Fields in:

Fields to Extract:

Name for the new table:
Items in the new table are called:

When you bring additional fields into a conversion, Quickbase often finds inconsistencies. For example, say you're converting your Companies column into its own table. One company, Acme Corporation, has offices in New York, Dallas and Portland. So, when you add the City column to the conversion, Quickbase finds three different locations for Acme. A single value in the column you're converting can only match one value in any additional field. Quickbase needs you to clean up the extra cities before it can create your new table. To do so, you have one of two choices:

  • If you want to create three separate Acme records (Acme-New York, Acme-Dallas and Acme-Portland) click the Conform link at the top of the column.
  • If the dissimilar entries are mistakes (say Acme only has one office in New York and the other locations are data-entry errors) go back into your table and correct the inconsistencies—in this case, changing all locations to New York. Then try the conversion again.

Read more about converting a column into a table.

Show fields from Show fields from Show fields from a related table

We're glad you're interested in doing more with Quickbase!

Now we need to make you official before you share apps or manage your account.

Verifying your email lets you share Quickbase with others in your company.

Your work email
Your company