LOTO Permit Status
 
Permit Number
Date Created
Date Needed
RI
Company Name
Project Name
Building
Scope of Work
Comments
 
Submitted  (1 LOTO Permit Application)  
LP-2804 04-14-2017 01:31 PM 04-18-2017 Stanley, Gregory Infrequent Subcontractor Mass Spec UPS Battery Replacement 100 Replace UPS batteries.   
On hold by RI  (9 LOTO Permit Applications) 
LP-2826 05-08-2017 11:40 AM 05-09-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Install conduit into junction box for low voltage control wiring on new cooling tower.  Junction box also contains 120v for solenoid operation.  
LP-2777 02-01-2017 02:07 PM 02-02-2017 Cota, David LBNL LOTO Procedure B90 Elevator loto 90 Enter elevator pit for troubleshooting  
LP-2744 11-22-2016 07:05 AM 11-23-2016   PDE B100 EL1D-25/27 Reconfiguration 100 Replace existing single pole 20 amp breakers with new two pole breaker and pull new wire properly sized for circuit rating.  
LP-2658 09-09-2016 10:59 AM 09-13-2016 Tully, John   B77 Skid Controls B77 Skid Replace transformers in control panel with new in their own enclosures within the control panel  
LP-2654 09-07-2016 03:40 PM 09-16-2016 Brunkow, Douglas Infrequent Subcontractor 62 Conference room reflooring 62 Contractor will be removing the carpet and asbestos containing floor tiles from the entire conference room of 62-203.  
LP-2652 09-02-2016 10:32 AM 09-08-2016 Mattson, Bill Stations Cubicle Config in B46 Room's 125, 132 & 134 B46 1) Disconnect all electrical sources (110VAC) powering cubicles prior removal of cubicle walls and furniture's.
2) Connect all electrical sources to power newly installed cubicle items.
 
LP-2307 09-01-2015 01:57 PM 09-01-2015 magstadt, michael Nationwide Power   50A Routine inspection, testing, preventive maintenance of the 60KVA Eaton 93E Uninterruptible Power Supply (UPS), including Extended Battery Cabinet (EBC) and battery replacement.  
LP-1971 05-20-2015 01:11 PM 05-20-2015 Johnson, Katherine Infrequent Subcontractor     Make this to the point.  Additional info can be written below.

This should describe the area that work will be performed based off the isolations locked out.

If the work is such that it will take place in separate phases (i.e. shut off valves to add new valves and then LOTO out the new valves) and the LOTO Safe Zone will shift, then a new Permit must be prepared for each planned shift.
 
LP-1956 05-13-2015 03:08 PM   Perkins, Kat          
Corrections Required  (3 LOTO Permit Applications) 
LP-2785 02-15-2017 04:58 PM 02-16-2017 Samatua, Tipasa Crouse Construction B. 15-236/260 Office Renovation 15 Trouble shooting as necessary after power cubicle power is made up [FEB-16-17 Doug Burkhardt] Arc Flash is missing.
Isolation Point #3 is missing circuit number.
LP-2782 02-08-2017 06:40 AM 02-09-2017 farrell, randy Rosendin Electric, Inc. CRT EPO upgrade 59 LOTO power to box containing spare circuit to allow conduit install [FEB-08-17 Doug Burkhardt] Scope of Work is missing
Areas Affected are missing
Panel schedule shows isolation point as a SPARE.
LP-2781 02-08-2017 06:26 AM 02-09-2017 farrell, randy Rosendin Electric, Inc. CRT EPO upgrade 59 Install conduits to Interface box and spare conduit west wall. [FEB-08-17 Doug Burkhardt] Arc Flash data is missing.
Corrected re-submitted  (1 LOTO Permit Application)  
LP-2856 06-20-2017 02:58 PM 06-20-2017 Kemper, Timothy Infrequent Subcontractor IGB Main Water Line 91 Remove blind flange and add new piping and pancake blind flange. [JUN-21-17 Doug Burkhardt] Per Mike Dong: "Please...put the water valve number on the [permit]."

[JUN-21-17 Ian White] Valve number added under isolation point on non electrical isolation spreadsheet
Reviewed by Facilities  (7 LOTO Permit Applications) 
LP-2858 06-21-2017 09:10 AM 06-24-2017 Brunkow, Douglas PDE Flexlab PV Panels 90 New electrical meter will need data added to it after it is installed and lotoed.  
LP-2857 06-21-2017 08:52 AM 06-23-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Remove sand filter, motor and pump.  All scheduled for demolition.  
LP-2855 06-20-2017 11:05 AM   Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Turn off VFD, close supply and return valves before and after check valve to replace check valve on 8" piping. [JUN-21-17 Doug Burkhardt] Non-electrical approved by MCD.
LP-2854 06-20-2017 10:45 AM 06-23-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Turn off VFD, close supply and return valves before and after check valve to replace check valve on 8" piping. [JUN-21-17 Doug Burkhardt] Non-electrical approved by MCD.
LP-2853 06-16-2017 04:25 PM 06-19-2017 Huebschle, Mark Infrequent Subcontractor S-Road Water Main 32 Replace 200' section of water main [JUN-20-17 Doug Burkhardt] Approved per MCD
LP-2850 06-13-2017 02:28 PM 06-14-2017 Johnson, Katherine Infrequent Subcontractor 70A Autoclave 70A Inspect wiring and change out a set of wires on a water level control board as well as install Water level probes.  

This will be done by the vendor under the direct field supervision of an LBNL QEW1 (or greater).  The QEW will establish an electrically safe work condition before any wiring work is performed.
 
LP-2795 03-14-2017 10:37 AM 03-21-2017 Samatua, Tipasa CAL NEVA Emergency Storage Containers B. 81A 81 Subcontractor to demo existing conductors and tie in new power for Emergency Supply Containers.  
Reviewed by EHS  (14 LOTO Permit Applications) 
LP-2800 03-23-2017 01:30 PM 03-29-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 After removal of GP-103-37 and GP-104-37, these four tower water valves will remain closed until new pumps and associated piping are installed. [MAR-24-17 Doug Burkhardt] Approved per MCD on 2/24/17
LP-2794 03-07-2017 02:07 PM   Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Close heater circuit 15, LP 2789, to heat motor for future energization.  Leave open circuit  M218A1A-5D temp CT power.  
LP-2774 01-23-2017 01:45 PM 02-03-2017 Tully, John Del Monte Electric 85 Fire Alarm upgrade 85 Install additional NEMA enclosure and remount FA modules  
LP-2492 05-23-2016 01:13 PM 05-24-2016 farrell, randy Rosendin Electric, Inc. B59 containers 59 Open equipment for inspection  
LP-2485 05-11-2016 07:18 AM 05-12-2016 farrell, randy Rosendin Electric, Inc. CRT branch circuit 59 Prep work for underfloor feeders to PDU 23. Land conductors and testing same for PDU 23  
LP-2463 04-06-2016 03:16 PM 04-08-2016 Kemper, Timothy DPR Construction CRT B59 Remove and Replace CT-3 Motor  
LP-2456 03-23-2016 02:39 PM 03-25-2016 reese, tom McCarthy repair flueon BR-002-30 30 Make modifications to boiler flue stack to repair leaks  
LP-2446 03-15-2016 02:12 PM 03-18-2016 reese, tom McCarthy repair flue, BR 1 and BR2, B30 30 Make modifications to boiler flue stack to repair leaks

 
LP-2433 02-24-2016 10:46 AM 02-25-2016 Kemper, Timothy Rosendin Electric, Inc. CRTF 59 Rough in and wire up Skasol chemical treatment injection pumps at Dolphin controller  
LP-2410 01-27-2016 02:08 PM 01-28-2016 Jew, Ernie Rosendin Electric, Inc. Troubleshoot and repair Submeter in 612A2A 59 Troubleshoot and repair submeter in panel 612A2A  
LP-2391 12-14-2015 02:14 PM 12-14-2015 farrell, randy DPR Construction CRT 59 Troubleshoot/repair under floor blower  
LP-2357 10-16-2015 02:32 PM 11-07-2015 Brunkow, Douglas CAL NEVA Old Town Demo 30 Contractor will be pulling in new wire to existing spare breakers through existing conduits.  
LP-2291 08-17-2015 01:05 PM 08-21-2015 reese, tom Rosendin Electric, Inc. ARU-3-64 replacement 64 Disconnect conductors from ARU-3. back pull conductors far enough to Re-configure conduit to new replacement chiller. Land wires at new chiller.  
LP-1937 04-14-2015 10:20 AM 04-24-2015 Brunkow, Douglas PDE B53 Improvements 27 Contractor will be removing dead cables from panel 33A.  
Approved  (1002 LOTO Permit Applications) 
LP-2852 06-15-2017 12:25 PM 06-15-2017 rcvelasco@lbl.gov LBNL LOTO Procedure Investigate Power Outage to 50 Area 70 Investigate cause of power outage to buildings 50  
LP-2851 06-14-2017 01:53 PM 06-14-2017 rcvelasco@lbl.gov LBNL LOTO Procedure Investigate Power Outage to 50/70 Area 64C Investigate cause of power outage to buildings 50, 54, 70, 70A [JUN-14-17 James Murphy] Switch Tag Reviewed by Murphy, not able to up load at this time
LP-2849 06-12-2017 02:30 PM 06-16-2017 rcvelasco@lbl.gov Eaton (Cutler-Hammer) Bldg 15 bus duct repair 15 Inspect bus duct  
LP-2848 06-12-2017 12:14 PM 06-15-2017 Brunkow, Douglas PDE Flexlab PV Panels 90X Contractor will be installing a new 150 amp breaker in panel 659A16A under loto LP-2843.  This loto will lockout the newly installed breaker until the EVAP is approved and the startup can begin.  Will also be used if there are issues found during the startup so that the circuit can be shutdown to correct them.  
LP-2847 06-12-2017 06:31 AM 06-12-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Demolish hot water riser pipes from t-section on exterior of building valve TW-3-204.  Demolish hot water riser pipes from cross-section on exterior of building valve TW-3-206.  New blind flanges will be placed over valves where riser pipes are removed. [JUN-12-17 Doug Burkhardt] Approved by MCD
LP-2846 06-07-2017 10:49 AM 06-09-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 34 Lock out new breakers for installation of three VFD's 37-VFD-020, 37-VFD-021 and 37-VFD-022 for three motors/pumps 37-GP--144, 37-GP-145 and 37-GP-146 [JUN-08-17 Doug Burkhardt] On hold per BB

[JUN-08-17 Benjamin Bolles] Corrections completed.  BGB
LP-2845 06-06-2017 09:03 AM 06-06-2017 Bolles, Benjamin W.E. Lyons B37 ALS cooling tower replacement 37 Demolition of existing cooling tower fans CT 100 and CT 101.

Demolition of chain hoist circuit, cable and conduit.
 
LP-2844 06-05-2017 11:19 AM 06-15-2017 Brunkow, Douglas PDE Flexlab PV Panels 90X Contractor will be replacing breaker feeding 659A16A and adding CTs for a metering system. [JUN-06-17 Doug Burkhardt] Added circuit info to isolation point.
LP-2843 06-02-2017 03:05 PM 06-14-2017 Brunkow, Douglas PDE Flexlab PV install 90X2 Contractor will be replacing breakers and adding new breakers and associated conduit and wires into panel 659A16A to support the installation of solar panels.  
LP-2842 05-30-2017 12:23 PM 06-01-2017 Bolles, Benjamin W.E. Lyons B37 ALS cooling tower replacement 37 Demolition of existing cooling tower fans and motor heaters CT 100 and CT 101.

Demolition of site lighting, cable and conduit and two outdoor receptacles and chain hoist circuits.
 
LP-2841 05-22-2017 11:41 AM 05-22-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 LOTO supply valves at sump 100 and sump 101 for cut-over of new 14" pvc supply header. [MAY-22-17 Doug Burkhardt] Approved by MCD
LP-2840 05-19-2017 09:40 AM 05-19-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Connect LLC circuit, liquid level controller, to existing thermistor circuit in junction box fed from E231A-15.  
LP-2839 05-18-2017 12:41 PM 05-22-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Isolate motor heater circuits for GP-100-37, GP-101-37 and GP-102-37.  These are currently isolated in a junction box waiting for new pumps. [MAY-18-17 Doug Burkhardt] electrical approved by dAb
non-electrical approved by MCD
LP-2838 05-18-2017 12:36 PM 05-22-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Isolate circuits in a junction box waiting for installation of new motors.  
LP-2837 05-18-2017 08:00 AM 05-22-2017 Stanley, Gregory PDE 407/408 Lighting Mods 400 Modify lighting supply power and install motion sensor that covers JGI Director's office desk.   
LP-2836 05-15-2017 03:33 PM 05-22-2017 Huebschle, Mark PDE 64-147 Two new circuits 64 Panel 129A4A

Use two spare single phase circuits at 25 slot and install new 30A breaker. Furnish and install new conduit to Room 147 and associated new receptacle.
[MAY-18-17 Doug Burkhardt] Please label equipment with the labels Jeffri provided.
LP-2835 05-15-2017 03:29 PM 05-22-2017 Huebschle, Mark PDE 64-147 Two new circuits 64 Replace ckt 30 breaker with a  50 amp breaker in Panel 512A7AD1A4A . Install a new disconnect and receptacle in room 147, associated conduit and conductors.  
LP-2834 05-12-2017 08:30 AM 05-15-2017 rcvelasco@lbl.gov Emerson Reliability Services (Vertiv) Grizzly Line 2 Transformer Test and Repair 036 We will isolate the bank 2 transformer so that Emerson could:
1. Test the line 2 Transformer ( hi-pot)
2. Megger wires from load side of transformer into SW-A1 (Brkr 102)
3. Line 2 Neutral resistor
 
LP-2833 05-11-2017 01:06 PM 05-12-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 34 Adding temporary power to panel 309A3A as needed to support the 37 Cooling Tower Replacement Project.  
LP-2832 05-11-2017 01:01 PM 05-12-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 34 Perform work associated with the energization of the new filtration motor 37-FL-101 per section 3 of the PUROFLUX Start-up Procedure.  
LP-2831 05-11-2017 10:09 AM 05-16-2017 Jew, Ernie Eaton Electrical UPS Services UPS 1 Fan Repair 59 Troubleshoot and Repair Fan Alarm on UPS1  
LP-2830 05-10-2017 09:47 AM 05-10-2017 rcvelasco@lbl.gov LBNL LOTO Procedure Repair TSW-1-62 62 TSW-2-62 will not transfer back to Normal. Halmuth Aukes to troubleshoot and repair.  
LP-2829 05-10-2017 08:26 AM 05-12-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 34 Lock out new breakers for future installation of three VFD's 37-VFD-020, 37-VFD-021 and 37-VFD-022 for three motors/pumps 37-GP--144, 37-GP-145 and 37-GP-146 and Cooling Tower Fan motor 37-CT-103 [MAY-11-17 Doug Burkhardt] Can you coordinate the work with Engineering? The panel schedules do not match this LOTO. Is this all new work?
LP-2828 05-10-2017 06:28 AM 05-12-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Remove GP-100-37, GP-101-37 and GP-102-37.  
LP-2827 05-09-2017 12:14 PM 05-10-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Install new 14" piping that ties into 20" cooling supply header at Cooling Tower Sump 101.  Tie in will not be made to 20" sump at this time and will occur under LP 2817.  New piping will be run from 14" valve TTV 3-37 which will be locked closed under this permit.  
LP-2825 05-05-2017 01:58 PM 05-05-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Remove and replace impeller in GP-102-37. [MAY-05-17 Doug Burkhardt] Non-electrical approved by MCD
LP-2824 05-03-2017 11:00 AM 05-05-2017 Stanley, Gregory PDE Room 122 NextSeq Circuit Mods 100 Work in the raceway down stream from EL5D to install new receptacles and pull wire.  No work will be performed in EL5D.  That work is performed under a separate permit.  
LP-2823 05-03-2017 10:56 AM 05-05-2017 Stanley, Gregory PDE NextSeq Circuit Mods 100 Install new two pole breakers for circuits 17/19 and 35/37.  Wiring accordingly.   
LP-2821 05-02-2017 08:08 AM 05-04-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Remove and replace wafer valve TW 02-37 below sump in room 203.  
LP-2820 05-02-2017 07:47 AM 05-04-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Remove and replace wafer valve TW 01-37 below sump in room 203.  
LP-2819 05-01-2017 01:24 PM 05-04-2017 Brunkow, Douglas Goebel Paving/Grading Old Town 7 Contractor will be flushing a water line that was repaired.  
LP-2818 05-01-2017 08:23 AM 05-01-2017 Cota, David Infrequent Subcontractor B-77 UMF 77 Perform work near the proximity of the crane.  No work will be performed within 42" of the crane rail.  This will be mechanical only. [MAY-01-17 David Cota] I changed the breaker to match the photo i sent in my text.
LP-2817 04-28-2017 12:51 PM 05-02-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Close cooling tower supply valves that supply water to cooling tower 101 sump to tie in new 14" piping. [MAY-01-17 Doug Burkhardt] Per MCD.
LP-2816 04-28-2017 07:07 AM 05-16-2017 Stanley, Gregory Steris Corp PM on B-100 Autoclave Steam Generator 100 Annual Preventative Maintenance Check. Includes blowing down the steam generator; removing and cleaning the conductivity probes; inspecting contactors and measuring insulation resistance.  
LP-2815 04-25-2017 02:17 PM 04-27-2017 Marietta, Peter Infrequent Subcontractor Bldg. 86 Autoclave 86 Replace the pump for the Autoclave under the direct field supervision by a lab authorized QEW.    
LP-2814 04-25-2017 06:46 AM 04-26-2017 Stanley, Gregory PDE April 2017 Lighting Repairs 310 Replace failed dual technology light switch  
LP-2813 04-19-2017 11:07 AM 04-24-2017 Stanley, Gregory PDE April 2017 Lighting Repairs 500 Replace failed lighting ballast  
LP-2812 04-19-2017 11:04 AM 04-24-2017 Stanley, Gregory PDE April 2017 Lighting Repairs 400 Replace failed lighting ballast  
LP-2811 04-19-2017 10:57 AM 04-24-2017 Stanley, Gregory PDE April 2017 Lighting Repairs 400 Replace lighting fixtures within cold room 454.  
LP-2810 04-19-2017 10:51 AM 04-24-2017 Stanley, Gregory PDE April 2017 Lighting Repairs 400 Replace failed lighting ballast in multiple fixtures  
LP-2809 04-19-2017 10:49 AM 04-24-2017 Stanley, Gregory PDE April 2017 Lighting Repairs 400 Replace lighting ballast in multiple fixtures.   
LP-2808 04-19-2017 10:46 AM 04-24-2017 Stanley, Gregory PDE April 2017 Lighting Repairs 310 Replace failed dual technology light switch.  [APR-19-17 Katherine Johnson] Do you have arc flash data for this panel?

[APR-24-17 Katherine Johnson] Panel fed from SVC Panel (arc flash taken from that panel)
LP-2807 04-19-2017 09:55 AM 04-21-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Close the two 14" hot water riser valves in room 203 so contractor can perform maintenance on 14" piping under new cooling tower 102.  
LP-2806 04-17-2017 08:17 AM 04-20-2017 Jew, Ernie Eaton Electrical UPS Services Building 59 Eaton UPS 2 Preventive Maintenance and Fan Replacement 59 Troubleshoot and replacement of fan and scheduled PM of Building 59 UPS 2.  Install new Software Update.  
LP-2805 04-17-2017 07:47 AM 04-20-2017 Jew, Ernie Eaton Electrical UPS Services Building 59 Eaton UPS 1 Preventive Maintenance and Fan Replacement 59 Scheduled PM of Building 59 UPS 1. Install New Software Update.  
LP-2803 04-04-2017 07:59 AM 04-06-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 34 Energization of two VFD's 37-VFD-023 and 37-VFD-024 for two motors/pumps 37-GP--147 and 37-GP-148.  
LP-2802 04-01-2017 11:44 AM 04-03-2017 NARANI, AKASH Infrequent Subcontractor Clean steam generator LOTO for preventative maintenance 978 System will be shut down for preventative maintenance.   
LP-2801 03-30-2017 02:00 PM 03-30-2017 Johnson, Katherine Infrequent Subcontractor Battery Replacement 67 Replace all strings of batteries within the UPS.  
LP-2799 03-17-2017 09:39 AM 03-22-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Remove GP-103-37 and GP-104-37.  [MAR-17-17 Katherine Johnson] Ben, after removal what will E231A-ckt 11 and ckt 9 power?
LP-2798 03-16-2017 02:31 PM 03-22-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Demolish GP-103-37 & GP-104-37 [MAR-16-17 Doug Burkhardt] Scope of work is to demo GP-103  & GP-104, but the isolation point only lockout heaters. Pumps are served by M218A2A. 

[MAR-16-17 Benjamin Bolles] Yes, that will be a separate LOTO 2797 which isn't completed yet.  Might need to re-energize the motor heater circuits since multiple motors are served by these two circuits.

[MAR-17-17 Doug Burkhardt] Then your scope for this LP is incorrect? 

[MAR-17-17 Katherine Johnson] Placed on hold for future work.

[MAR-31-17 Katherine Johnson] TEST
LP-2797 03-16-2017 01:44 PM 03-22-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 After removal of GP-103-37 and GP-104-37, these circuits will remain safed off wires in a can and non-electrical isolations will remain off until new motors get installed. [MAR-17-17 Doug Burkhardt] Again, the scope of work does not cover all of the circuits to the system, ie the heaters. Under what LOTO permit are you demoing the pumps?
LP-2796 03-16-2017 12:54 PM 03-22-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 34 Adding temp power to panel 309A3A to feed two new pumps/motors in B37 2nd floor. [MAR-16-17 Doug Burkhardt] The equipment and isolation points do not make sense. Panel 309A3A is fed by 309A-3, not M309A7A-3K.

Scope is unclear: Are you providing temp power to the panel? From M309A7A?

[MAR-16-17 Benjamin Bolles] Sorry, correction made.
LP-2793 03-06-2017 02:01 PM 03-20-2017 farrell, randy PDE ESNET 100 amp panel 59 LOTO of new panel (installed under LP-2750) to work downstream.  
LP-2792 02-28-2017 05:04 PM 02-01-2017 Huebschle, Mark Goebel Paving/Grading Old Town Demolition 52 Repair hole in water main line.  
LP-2791 02-24-2017 02:42 PM 02-28-2017 Huebschle, Mark Infrequent Subcontractor Water main repair B36,B61 36 Install 12" valve in domestic water main [FEB-27-17 Doug Burkhardt] Approved per MCD

[MAR-06-17 Katherine Johnson] Need to modify.

[MAR-06-17 Doug Burkhardt] Approved per MCD

[JUN-16-17 Katherine Johnson] 6/16: Updated contractor to Ground Level from Goebel.
LP-2790 02-23-2017 09:22 AM 02-23-2017 Jew, Ernie Infrequent Subcontractor Replace control board in Edison Cray cabinet N7-C7-0A/N7-C7-0B 59 Replace a control board in Edison Cray cabinet N7-C7-0A/N7-C7-0B  
LP-2789 02-21-2017 12:29 PM 02-22-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Install new feeders in pull box in room 202 and tie into new VFD on Roof and new cooling tower CT-102. [FEB-22-17 Doug Burkhardt] Isolation point does not make sense. Are you locking out the entire MCC (M218A1A) or just circuit M218A1A-5D for temp power to CT-102? If the later, the equipment descriptor is CT-102 and the isolation point is M218A1A-5D. If the former, the equipment descriptor is M218A1A and the isolation point is 218A-1.

[FEB-28-17 James Murphy] Corrections are made.

[FEB-28-17 James Murphy] Please review changes
LP-2788 02-21-2017 07:42 AM 02-22-2017 Jew, Ernie Nite & Day Power PM on MGE UPS at OSF 943 Perform Preventive Maintenance on MGE 800kVA UPS at OSF [FEB-22-17 Katherine Johnson] Who will be the QEW from Nite & Day?  

[MAR-01-17 Ernie Jew] Ernie Jew will be the QEW performing the ZVV so that the UPS will be electrically safe to work on.
LP-2787 02-16-2017 02:49 PM 02-23-2017 Jew, Ernie Infrequent Subcontractor B-59 Generator maintenance 59 Perform scheduled generator maintenance [FEB-22-17 Katherine Johnson] What company will be doing this work?

[MAR-01-17 Ernie Jew] Bay City Electric Works
LP-2786 02-16-2017 12:44 PM   Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Install three conduits into panel E231A and add one new circuit breaker for E power to telephone panel in room 202.E and connect new conductors to existing circuits 11,15,17 for new cooling tower components (motor heater, VFD components). [FEB-17-17 Doug Burkhardt] Obtain AF from Engineering if not available.

[FEB-17-17 Benjamin Bolles] Corrections completed Ben bolles
LP-2784 02-15-2017 02:18 PM 02-17-2017 Bolles, Benjamin W.E. Lyons B37 ALS Cooling Tower Replacement 37 Lock closed valve TW-13-37 and Lock closed valve TW-01-37 to isolate cooling tower 12" riser for modification on exterior of building.  Add new "T" section to riser with new valves. [FEB-16-17 Doug Burkhardt] Reviewed by Mike Dong via email.
LP-2783 02-09-2017 02:13 PM 02-13-2017 Bolles, Benjamin W.E. Lyons B37 ALS cooling Tower Replacement 37 Lock Closed 18" Cooling Tower Supply valve on hot water riser valve # CT 102-A.
Lock Closed 18" Cooling Tower Supply valve on hot water riser valve # CT 102-B.
 
LP-2780 02-07-2017 12:29 PM 02-03-2017 rcvelasco@lbl.gov Emerson Reliability Services (Vertiv) 115kV Line 2 Repair 036 Emerson is going to perform maintenance and testing on 115 kV SF6 Breaker 142 as well as MODS 143-2.  These are the only 2 pieces of equipment that will be worked on under this LOTO permit.  
LP-2779 02-07-2017 11:22 AM 02-14-2017 shaw, darrel Infrequent Subcontractor cubical reconfigure 75b reconfigure cubicals [FEB-14-17 James Murphy] Added circuit 405A40A-15 to permit after approved but before work began.
LP-2778 02-01-2017 02:41 PM 02-06-2017 Huebschle, Mark Crouse Construction 50A 1st flr remodel 50A Relocate light switch  
LP-2775 01-26-2017 11:56 AM 01-30-2017 Cota, David Infrequent Subcontractor Building 77 Crane door repair B77 Replace cables that operate the doors. No electrical or exposure to electrical sources is planned.  
LP-2773 01-19-2017 10:22 AM 01-19-2017 Bolles, Benjamin W.E. Lyons B37 Heat Exchangers 37 Replace spool piece on tower water inlet to heat exchanger EX-102-37. [JAN-19-17 Mark Scott] Edited to correct equipment descriptors and specify the scope of work.
LP-2772 01-17-2017 07:54 AM 01-17-2017 Mattson, Bill Emerson Reliability Services (Vertiv) 37 Busway repair 37 Emerson to isolate and repair 480 VAC bus duct on bank 218.
PDE to remove stabs off the backside of Panel 218A-3/4 for future work.
PDE to investigate heater circuits inside M218A1A, M218A2A.
 
LP-2771 01-16-2017 05:17 PM 01-16-2017 rcvelasco@lbl.gov Emerson Reliability Services (Vertiv) B15 Busway repair 37 Connect temporary cables from XFM 546 to 546A.
 
LP-2770 01-15-2017 02:12 AM 01-15-2017 Mattson, Bill Emerson Reliability Services (Vertiv) Repair Electrical Equipment at B15, 34 & 37 15,34,37 Repair ADF-1-34 Closing mechanism
Repair Bank 218 Bus Duct
Repair Bank 546 Bus Duct
 
LP-2769 01-15-2017 12:31 AM 01-15-2017 Mattson, Bill Emerson Reliability Services (Vertiv) B15 Busway repair 37 Disconnect and repair Bus Duct and reconnect.  
LP-2768 01-15-2017 12:20 AM 01-15-2017 Mattson, Bill Emerson Reliability Services (Vertiv) 37 Busway repair 37 Disconnect and repair Bus Duct and reconnect.  
LP-2767 01-14-2017 11:57 PM 01-14-2017 Mattson, Bill Emerson Reliability Services (Vertiv) B15 & 37 Busway repair 15 & 37 Disconnect and repair Bus Duct and reconnect.  
LP-2766 01-10-2017 03:06 PM 01-12-2017 Bolles, Benjamin W.E. Lyons 37 Cooling tower replacement 37 Demolish GP-134-37 and GP-135-37  
LP-2765 01-10-2017 02:29 PM 01-14-2017 Mattson, Bill Emerson Reliability Services (Vertiv) SW-A4 Bus 1 maintenance 35 ERS to perform maintenance on Battery Charger B (35 BC002) [JAN-12-17 Doug Burkhardt] Isolation point is incorrect. Panel schedule shows circuit #1 is the battery charger which I believe you are trying to LOTO, not the entire panel.

[JAN-12-17 Bill Mattson] (JAN-12-17 Bill Mattson) Corrections completed per comments made by Douglas Burkhardt.
LP-2764 01-10-2017 11:45 AM 01-14-2017 Mattson, Bill Emerson Reliability Services (Vertiv) SW-A4 Bus 1 maintenance 35 Emerson to perform inspection and adjustments as needed on Battery Charger 1 (35 BC001) [JAN-12-17 Doug Burkhardt] Equipment descriptor shows you are shutting down the entire panel. I updated it to Charger #1
LP-2763 01-06-2017 05:35 PM 01-06-2017 Bolles, Benjamin W.E. Lyons 37 Cooling Tower replacement 37 Replace 6 heat Exchangers [JAN-06-17 James Murphy] Approved due to multiple changes
LP-2762 01-05-2017 01:50 PM 01-13-2017 Samatua, Tipasa Crouse Construction B. 15-236/260 Office Renovation 15 Subcontractor to tie new office cubicle electrical feeds. [JAN-06-17 Doug Burkhardt] Arc Flash data missing from isolation points.

[JAN-06-17 Tipasa Samatua] Correction made. 1/6/17. TS

[JAN-06-17 Katherine Johnson] T, your arc flash still is not right.  What are the cal/cm2?

[JAN-09-17 Tipasa Samatua] Correction made 1/9/17 0.1 calories
LP-2761 01-03-2017 02:28 PM 01-06-2017 Bolles, Benjamin W.E. Lyons 37 Cooling tower replacement 37 Demolish GP-134-37 & GP-135-37 [JAN-04-17 Doug Burkhardt] Confirm with Facilities Mech Engineering that it is acceptable to turn off the heaters to BL-101, GP-104, GP-132, GP-131, GP-136,GP-137 and KC-100
LP-2760 12-22-2016 02:39 PM 01-04-2017 Bolles, Benjamin W.E. Lyons 37 Cooling Tower replacement 37 Replace 6 heat ex-changers [JAN-03-17 Doug Burkhardt] Electrical Isolation #13 does not match panel schedule. Schedule shows GP-111-37, not GP-120.
LP-2759 12-19-2016 10:53 AM 01-30-2017 Bashaw, Douglas Infrequent Subcontractor ALS SRRF Upgrade Phase 3B 6 Retrofitting circulator #1, this involves replacing water connectors, thermal sensors, and connector panels and then calibration.
[DEC-19-16 Jeff Troutman] Vendor has taken EHS0379 Subcontractor LOTO Orientation
LP-2758 12-16-2016 09:04 AM 12-23-2016 White, Ian PDE B78 Lighting Controls Upgrade 78 Retrofit cubicle power with Title 24 controls. [DEC-19-16 Doug Burkhardt] - Isolation points do not match panel schedules. List out each circuit individually. 
- Arc Flash data is missing.
LP-2757 12-15-2016 02:58 PM 12-19-2016 Cota, David Infrequent Subcontractor B54 Kitchen clean B54 Grill hood and duct cleaning.  
LP-2755 12-14-2016 03:05 PM 12-16-2016 Cota, David Infrequent Subcontractor B54 Kitchen clean 54 Clean the stove and hood  
LP-2754 12-14-2016 02:58 PM 12-16-2016 Cota, David Infrequent Subcontractor B54 Kitchen Clean B54 Clean fryer, steamer, hood and duct  
LP-2753 12-14-2016 02:47 PM 12-16-2016 Cota, David Infrequent Subcontractor B54 Kitchen clean B54 De energize BL-17-54  
LP-2752 12-14-2016 11:45 AM 01-14-2017 Mattson, Bill Emerson Reliability Services (Vertiv) SW-A4 Bus 1 maintenance 35 Emerson to perform Electrical PM on:
A. SW-A4 Bus 1 (12 KV Breakers, CPT's, PT's, Metering Equipment, Bus)
B. ADF-2-37 & ADF-3-37, Bank 218
C. ADF-1-34, Bank 309
D. ADF-1-15, Bank 546
E. GS-1-33U, ADF-1-33U, Bank 635
F. GS-2-33U, ADF-1-30, Bank 650
Eaton to measure Electrical Breaker Enclosure 218A-3 & 4
PDE to install (N) breaker and conductors in MCC218A-5D
PDE to remove/demo circuits/conductors ot GP-134 and GP-137
PDE to investigate and make penetrations for future conduit penetration
PDE to investigate circuits downstream of switchgear 218A and panel 230A for future work.
LBNL Electricians to install heater cans and ceramic standoffs in ADF-1-15 and ADF-2-37 and ADF-3-37.
LBNL Electricians to install temp power pigtail in a panel to be determined for Brian Taylor.
[JAN-12-17 Keith Laforga] - Include installation of heater meter cans and change-out of standoffs at ADF-1-34 and ADF-1-15
- Attach the approved switch tag and reference onelines

[JAN-12-17 Mark Scott] Reviewed and approved after making some changes:

- Set Master Lock Box field to “No” instead of “Yes, since there was no referenced Lockbox.
- Made significant changes to Equipment Descriptor names for both isolations and grounds. This field is to designate what load is being isolated, or what part of the system is being grounded. This should always be UNIQUE, not generic. This is different than isolation type.
- Isolation type was changed to “Vacuum Circuit Breaker” instead of just “Circuit Breaker”.
LP-2750 12-08-2016 07:20 AM 12-21-2016 farrell, randy PDE ESNET panel 59 Loto panel 593A45A and install new 100 amp breaker [DEC-12-16 Doug Burkhardt] Isolation points do not match panel schedules or single lines. Coord. with Engineering for updates.

[DEC-12-16 randy farrell] I was on the wrong floor thank you. Please take another look.

Thanks 
Randy

[DEC-12-16 Doug Burkhardt] This works. Note, I changed your isolation point to Panel-Circuit.
LP-2749 12-01-2016 07:44 AM 12-09-2016 Brunkow, Douglas Crouse Construction B2-100B Outlet upgrade 1 Change out 3 outlets in room 100Q from the standard duplex outlets to GFCIs.  Also change one outlet in room 100B from a duplex outlet to a quad outlet.  
LP-2748 11-28-2016 12:10 PM 11-28-2016 rcvelasco@lbl.gov Crown Moving Company Cubicle Modification 76L Loto circuits so Crown can modify and then after work is complete to re-energize cubes  
LP-2747 11-28-2016 10:17 AM 11-28-2016 rcvelasco@lbl.gov Crown Moving Company Cubicle Modification 76 Loto circuits so Crown can modify and then after work is complete to re-energize cubes  
LP-2746 11-22-2016 07:22 AM 11-23-2016 Stanley, Gregory PDE 409 Lighting Ballast Replacement 400 Replace lighting ballast in Office 409  
LP-2745 11-22-2016 07:19 AM 11-23-2016 Stanley, Gregory PDE B100 EL1D-25/27 Reconfiguration 100 Replace existing single-pole breakers with new two-pole breaker and pull properly sized wire for new circuit configuration. [NOV-22-16 Katherine Johnson] Per email from Greg:  It is a 208v 100 amp breaker fed from TRE-1 (112.5 kva)
LP-2743 11-22-2016 06:54 AM 11-23-2016 Stanley, Gregory PDE B100 EL1D-25/27 Reconfiguration 100 Replace/reconfigure existing branch circuit receptacle.  
LP-2742 11-17-2016 12:19 PM 11-18-2016 Taylor, Brian PDE Bank 66 Repair 067 Clear LOTO 2741 except PF CAP BANK #1/Temporary Power Supply to B62.  550A-12 to remain open and locked out to remove temp cables at a later date yet to be determined.  
LP-2741 11-14-2016 12:47 PM 11-15-2016 Taylor, Brian PDE Bank 66 Repair 062 Disconnect Building 62 from alternate power source from feed load side of Bank 66 from Bank 550 in Building 67.  Reconnect transformer to normal state with all bus connections at transformer and bus cabinet.  
LP-2740 11-14-2016 10:48 AM 11-15-2016 Taylor, Brian PDE Bank 66 Repair 062 Clear LOTO 2301 and close breakers for Bank 66 transformer heaters and fans and close breaker for 62-ADF-002 at Panel 93G ckts 2, 8, 20.  Continue under LOTO three isolation points from LOTO 2301 as listed below.  
LP-2739 11-14-2016 09:39 AM 11-14-2016 Begley, Larry Kone Bldg. 80 Elevator Door Issue 080 Troubleshot and repair elevator door issue  
LP-2738 11-07-2016 09:11 AM 11-08-2016 Jew, Ernie LBNL LOTO Procedure Exhaust Fan EBL-8A, EBL-8B Fan Belt Replacement 59 Replace Fan Drive Belts on 59-BL-005 and 59-BL-006 Fans  
LP-2737 11-03-2016 07:43 AM 11-04-2016 Samatua, Tipasa Infrequent Subcontractor B. 77 Electrical Panel Replacement 77 LBNL Electricians to perform LOTO to allow the manufacturer's to field measure various electrical panel interior for fabrication.  
LP-2736 10-27-2016 12:41 PM 10-28-2016 Huebschle, Mark Crouse Construction 71-146 caves HVAC upgrade 71 Controls wiring for new VFD [OCT-27-16 Doug Burkhardt] Please provide circuting information so I can verify against the Panel Schedules and/or SLDs.

[OCT-27-16 Mark Huebschle] 484A3A, ckt 16
LP-2735 10-27-2016 12:34 PM 10-28-2016 Huebschle, Mark Crouse Construction 71-146 caves HVAC upgrade 71 Controls wiring for new VFD . [OCT-27-16 Doug Burkhardt] Please provide circuiting information so I can verify against the Panel Schedules and/or SLDs.

[OCT-27-16 Mark Huebschle] 484A3A ckt 12
LP-2734 10-25-2016 11:29 AM 10-27-2016 Beaton, Don Total Environmental & Power Systems, Inc: (TEPS) B76 Fuel pumps 76 Termination of cable conductors to the unleaded fuel pump and unleaded leak detection system.  
LP-2733 10-25-2016 11:13 AM 10-27-2016 Beaton, Don Total Environmental & Power Systems, Inc: (TEPS) B76 Fuel Pumps 76 Termination of the diesel fuel pump power and leak detection conductors.  
LP-2732 10-25-2016 10:16 AM 11-02-2016 Samatua, Tipasa Infrequent Subcontractor B. 77 Electrical Panels Replacement (ESIP) 77 LBNL Electricians to LOTO various electrical panels to allow IEM Technician to field measure various panels that are on the list of the ESIP program. [OCT-25-16 Doug Burkhardt] Provide Arc Flash Data with ARMS data enabled and note it on the permit.

[NOV-02-16 Tipasa Samatua] Entered
LP-2731 10-25-2016 08:39 AM 11-02-2016 Samatua, Tipasa Infrequent Subcontractor B. 77 Electrical Panel Replacement (ESIP) 77 Subcontractor (IEM) Technician to field measure various electrical panels interior to be fabricated at their site and ship to LBNL for replacement by LBNL Electricians. 

Note: This is field measurements only. No other work is authorized.
[OCT-25-16 Doug Burkhardt] Provide Arc Flash Data with ARMS data enabled and note it on the permit.

[NOV-02-16 Tipasa Samatua] Entered
LP-2730 10-19-2016 01:08 PM   Begley, Larry Mitsubishi Elevator Bldg. 30 Elevator Maintenance 30 Testing/Troubleshooting of the elevator seismic device and corrections for annual inspections.  
LP-2729 10-19-2016 01:07 PM 10-19-2016 Begley, Larry Mitsubishi Elevator Bldg. 30 Elevator Maintenance 30 Testing/Troubleshooting of the elevator cab lights and corrections for annual inspections.  
LP-2727 10-19-2016 01:06 PM 10-19-2016 Begley, Larry Mitsubishi Elevator Bldg. 30 Elevator Maintenance 30 Testing/Troubleshooting of the elevator controller and shunt trip and corrections for annual inspections.  
LP-2726 10-17-2016 02:30 PM 10-18-2016 Cota, David LBNL LOTO Procedure B85 FA Upgrade B85 De energize circuit 40 for fire alarm troubleshooting  
LP-2725 10-17-2016 02:08 PM 10-18-2016 Cota, David LBNL LOTO Procedure B85 FA Upgrade B85 De energize outbuildings for fire alarm troubleshooting  
LP-2724 10-17-2016 10:27 AM 10-17-2016 Cota, David Del Monte Electric B 85 FA Upgrade -E359A B 85 De-Energize Outbuildings after opening Doors to troubleshoot Fire Alarm System  
LP-2723 10-13-2016 08:13 AM 10-18-2016 farrell, randy LBNL LOTO Procedure CRT 59 LOTO out 590A22A to continue install of PQube meter after 590 substation is reenergized [OCT-13-16 Doug Burkhardt] The breaker notation was incorrect. I correct it to 590A-22. Breakers are not named after the serving panel.

[OCT-13-16 Katherine Johnson] I will need information from GE techs that will be coming out.
LP-2722 10-11-2016 04:12 PM 10-17-2016 Lukens, Wayne Infrequent Subcontractor Service or replace X-ray tube or high voltage generator 070A Replacing the X-ray tube or servicing the high voltage generator.

X-ray tube is a "consumable" part of the instrument. It needs to be replaced about every two years.
[OCT-12-16 Doug Burkhardt] Provide the circuiting information for the disconnect serving as the isolation point.

[OCT-13-16 Wayne Lukens] Added Panel # and circuit (Building 70A Panel 31A3D Circuit 25)
LP-2721 10-11-2016 03:54 PM 10-17-2016 Lukens, Wayne Infrequent Subcontractor Service low voltage (<240 V) components of X-ray diffractometer 070A Replacing and repairing components of the X-ray diffractometer other than the X-ray tube or high voltage generator. [OCT-12-16 Doug Burkhardt] Provide circuiting information for the disconnect switch serving as the isolation point.

[OCT-13-16 Wayne Lukens] Added panel and circuit numbers (Building 70A Panel 31A3D Circuit 25)
LP-2720 10-11-2016 02:28 PM 10-17-2016 Lukens, Wayne Infrequent Subcontractor Service X-ray Diffractometer (Rad only) 070A Replace X-ray shutter [OCT-12-16 Doug Burkhardt] Why is this LOTO needed if you are not doing ZVV?  Provide circuiting information for the disconnect switch serving as the isolation point.

[OCT-13-16 Wayne Lukens] To prevent the X-ray tube from being energized while the shutter is absent.  See 5a, above
LP-2719 10-11-2016 11:32 AM   Samatua, Tipasa Infrequent Subcontractor Ethanol Dispenser Replacement 076 Connect Card Reader to New E85 Dispenser  
LP-2718 10-11-2016 10:58 AM 10-11-2016 Samatua, Tipasa Infrequent Subcontractor Ethanol Dispenser Replacement 076 Remove and replace E85 dispenser. Connect power and control to dispenser.  
LP-2717 10-11-2016 07:33 AM 12-16-2016 Kemper, Timothy Goebel Paving/Grading Bayview Site Access Improvements B51 Loto new 6" FW valve for work down stream [OCT-13-16 Katherine Johnson] The isolation point will need a unique number. 

[DEC-12-16 Ian White] Unique isolation point added.
LP-2716 10-11-2016 07:27 AM 10-14-2016 Kemper, Timothy Goebel Paving/Grading Bayview Site Access Improvements B51 LOTO new 10" DW valve for work down stream. [OCT-13-16 Katherine Johnson] The isolation point will need a unique number.
LP-2715 10-10-2016 02:17 PM 10-10-2016 Harding, Ari Q Corporation Building 60 Psychrometric Chamber DAS Installation 60 Allow for visual inspection of the belt and then repair under LOTO.  
LP-2714 10-07-2016 12:56 PM 10-10-2016 Harding, Ari Q Corporation Building 60 Psychrometric Chamber DAS Installation 60 Install new conduit and wiring from the load side of the Calorimeter Chamber DAS Product Power disconnect switch to the Power Supply control cabinet, the individual Power Supplies and various power plugs inside the OD Room for Unit Under Test (UUT) connection.  
LP-2713 10-03-2016 09:43 AM 10-03-2016 farrell, randy Rosendin Electric, Inc. CRT 59 EVAP start up and testing of PDU 24  
LP-2712 10-03-2016 08:58 AM 10-04-2016 Huebschle, Mark CAL NEVA 86 HVAC Upgrade 86 Install Transformer for new control cabinet  
LP-2711 10-03-2016 08:49 AM 10-03-2016 farrell, randy Rosendin Electric, Inc. CRT 59 EVAP start up of PDU 23 per MOP  
LP-2710 10-03-2016 08:46 AM 10-04-2016 Huebschle, Mark PDE 71  146 Caves HVAC upgrade 71 wiring and testing in controls cabinet  
LP-2709 09-29-2016 02:02 PM 10-03-2016 Tully, John CAL NEVA B86 HVAC Upgrades 86 LOTO Boilers to allow additional controls to be installed in the control panels for the boilers [SEP-30-16 Doug Burkhardt] The isolation point and equipment descriptor is incorrect. I corrected and approved. Verify this is what you want.

[SEP-30-16 John Tully] Thanks. I want to LOTO the boilers.
LP-2708 09-27-2016 10:06 AM 09-28-2016 Kemper, Timothy DPR Construction CRT B59 Remove one 24 volt damper motor and place it on the opposite side of the dampers then install leakage,etc.
Block dampers open with a 4"x4"
BMS will call for dampers to stay open
[SEP-27-16 Stephanie Collins] As Per Randy Farrell, this LOTO is for Tag Out only. The damper is to be blocked open. There isn't at Lockout Point for isolation. Permit needs to be changed to reflect Tagout only.
LP-2707 09-27-2016 09:59 AM 09-28-2016 Kemper, Timothy DPR Construction CRT B59 Remove one 24 volt damper motor and place it on the opposite side of the dampers then install leakage,etc.
Block dampers open with a 4"x4"
BMS will call for dampers to stay open
[SEP-27-16 Stephanie Collins] As per Randy Farrell, this LOTO is for Tagout only. There is no lockable isolation point. Permit needs to be changed to reflect tagout only.
LP-2706 09-27-2016 09:54 AM 09-28-2016 Kemper, Timothy DPR Construction CRT B59 Remove one 24 volt damper motor and place it on the opposite side of the dampers then install leakage,etc.
Block dampers open with a 4"x4"
BMS will call for dampers to stay open
[SEP-27-16 Stephanie Collins] As per Randy Farrell this is a tagout only. The dampers will be blocked open. There is no lockable isolation point. Permit needs to change to reflect tagout only.
LP-2705 09-27-2016 09:44 AM 09-28-2016 Kemper, Timothy DPR Construction CRT B59 Remove one 24 volt damper motor and place it on the opposite side of the dampers then install leakage,etc.
Block dampers open with a 4"x4"
BMS will call for dampers to stay open
[SEP-27-16 Stephanie Collins] As per Randy Farrell this is a Tagout only LOTO. The damper will be blocked open. There is no lockable isolation point. Permit needs to be changed to reflect Tagout .
LP-2704 09-26-2016 04:12 PM 09-28-2016 Brunkow, Douglas PDE B71 HVAC upgrade 71 Contractor will be working on new circuit, then  energizing equipment and needs the ability to lock out the new receptacle if needed.  
LP-2703 09-26-2016 02:32 PM 09-28-2016 Troutman, Jeff Infrequent Subcontractor Dectris Detector Repair 6 Changing power supplies to detector. [SEP-27-16 Mark Scott] Please add information for isolation #1.
LP-2702 09-26-2016 11:24 AM 09-27-2016 Jew, Ernie Nite & Day Power Fuse replacement at UPS 943 Replace blown fuses for fans at MGE 800 kVA UPS  
LP-2700 09-23-2016 03:21 PM 09-27-2016 Beaton, Don Crouse Construction B-76 Rm 222 Alterations B-76 Replace existing light fixtures with new LED fixtures. Relocate light switch in Rm. 222. [SEP-26-16 Don Beaton] DB
LP-2699 09-23-2016 12:19 PM 09-21-2016 Kemper, Timothy Goebel Paving/Grading Bayview Site Access Improvements B51 Exterior Tie-in  new 6" FW line to existing 10 " water line. 
10" water line located in Smoot  Road .
6' FW line located in Smoot Road into I Lot parking stall.
[SEP-23-16 Timothy Kemper] Bleed water at FHY  # 12 or FHY #13
LP-2698 09-23-2016 12:01 PM 09-28-2016 Kemper, Timothy Goebel Paving/Grading Bayview Site Access Improvements B51 Exterior Tie-in new 10" water line to existing.
New water line will feed new 6" fire hydrant line and 10" will be capped off.
[SEP-23-16 Timothy Kemper] Line will be bleed from FHY # 44 or PC6
LP-2697 09-22-2016 01:54 PM 09-22-2016 Marietta, Peter Infrequent Subcontractor Potter Street 977 Maintenance of the XRAD 320  
LP-2696 09-22-2016 11:46 AM 09-26-2016 Tully, John CAL NEVA B86 HVAC Upgrades B86 Shut down boilers, LOTO gas and install new gas meter for the boilers  
LP-2695 09-20-2016 01:57 PM 09-21-2016 Beaton, Don Crouse Construction B-76 Rm. 222 Alterations B-76 disconnect electrical feed to furniture  
LP-2694 09-19-2016 11:37 AM 09-19-2016 rcvelasco@lbl.gov Crown Moving Company Bldg 46 Renovation 046A Cubical wall installation.  
LP-2693 09-16-2016 04:36 PM 09-23-2016 Huebschle, Mark Crouse Construction 71 room146L & B upgrades 71 Core drill thru 24" concrete wall next to electrical panel  
LP-2692 09-16-2016 01:34 PM 09-22-2016 Cota, David Infrequent Subcontractor B75a Emergency storage containers B75a Provide 120v power to emergency storage container lighting and receptacle [SEP-30-16 Doug Burkhardt] panel schedule shows this circuit is dedicated for a Vehicle Charging station. Please coordinate.

[SEP-30-16 Doug Burkhardt] My fault. I looked at the wrong circuit.
LP-2690 09-16-2016 01:26 PM 09-22-2016 Cota, David Infrequent Subcontractor B83/U5 Emergency storage containers U-5 parking lot /B83 Provide 120v Power to emergency storage containers for lighting and receptacle  
LP-2689 09-16-2016 11:26 AM 09-20-2016 Cota, David Del Monte Electric B 85 FA Upgrade -E359A B 85 De energize high expansion foam skids during change over from old to new system devices  
LP-2688 09-15-2016 03:48 PM 09-16-2016 Harding, Ari PDE FLEXLAB 2016 EOY Electrical 90X Install new branch circuits to existing spare 20A circuit breakers in panels 659A21A and 659A22A located in the fixed FLEXLAB X3 Test Bed. Install new CTs as directed in SOW.  
LP-2687 09-15-2016 03:44 PM 09-16-2016 Harding, Ari PDE FLEXLAB 2016 EOY Electrical 90X Install new branch circuits to existing spare 20A circuit breakers in panels 659A15A and 659A16A located in the fixed FLEXLAB X2 Test Bed. Install new CTs as directed in SOW.  
LP-2686 09-15-2016 03:40 PM 09-23-2016 Huebschle, Mark CAL NEVA 86 HVAC Upgrade 86 provide power to a new monitoring panel for HVAC controls  
LP-2685 09-15-2016 03:39 PM 09-16-2016 Harding, Ari PDE FLEXLAB 2016 EOY Electrical 90X Install new branch circuits to existing spare 20A circuit breakers in panels 659A9A and 659A10A located in the fixed FLEXLAB X1 Test Bed. Install new CTs as directed in SOW.  
LP-2683 09-15-2016 02:28 PM 09-19-2016 Harding, Ari PDE FLEXLAB 2016 EOY Electrical 90X Install new branch circuits to existing spare 20A circuit breakers in panels 667A5A and 667A6A located on the Rotating Test Bed. Install new CTs as directed.  
LP-2682 09-15-2016 12:25 PM 09-20-2016 Beaton, Don Crouse Construction B-48 fire alarm upgrade B-48 Change receptacle to match new equipment plug [SEP-16-16 Doug Burkhardt] Need Arc Flash data.

[SEP-16-16 Don Beaton] Arc Flash data completed

[SEP-16-16 Doug Burkhardt] I don't see AF in the permit?

[SEP-16-16 Don Beaton] Check now?
LP-2681 09-15-2016 09:01 AM 09-15-2016 rcvelasco@lbl.gov Emerson Reliability Services (Vertiv) Grizzly Sub 3 Year Maintenance 036A Visual inspection, investigation and electrical testing of Bank 360, line 1 control power transformer (CPT) feeding the ATS for control power.
 
LP-2680 09-15-2016 05:50 AM 11-15-2016 Taylor, Brian PDE Bank 66 Repair 062 To be used for correcting phase rotation if required after clearing LOTO #2741 [SEP-15-16 Doug Burkhardt] Please attach a single line diagram showing the existing LOTO scheme and provide information on what you are trying to LOTO for this permit.

[NOV-14-16 Benjamin Bolles] 
Revised 11/14/16
LP-2679 09-14-2016 04:19 PM 09-06-2016 Beaton, Don Crouse Construction B-76 Rm 222 B-76 Relocate light switch [SEP-15-16 Doug Burkhardt] Panel schedule shows that circuit is for lighting. Pick another circuit as we don't want to mix lighting and receptacles.

[SEP-15-16 Don Beaton] permit application corrected to indicate device is a light switch

[SEP-16-16 Don Beaton] Arc Flash data completed
LP-2677 09-14-2016 12:36 PM 09-17-2016 Samatua, Tipasa Crouse Construction B. 84-2/3 Floor Conversion 84 Subcontractor to reverse existing Circuit Setter valves to allow balancing company to adjust water pressure required to keep room temperature level.  
LP-2676 09-13-2016 02:16 PM 09-14-2016 Cota, David Del Monte Electric B85 Fire Alarm upgrade B85 Remove and replace existing heat detectors in room 114  
LP-2675 09-13-2016 02:01 PM 09-14-2016 Cota, David Del Monte Electric B85 FA Upgrade B85 Replace duct detectors with new duct detectors [SEP-14-16 Doug Burkhardt] I believe AHU-005 is on circuit B10, not 10.

[SEP-14-16 David Cota] Good catch , I corrected the error.
LP-2674 09-13-2016 12:12 PM 09-21-2016 Begley, Larry Infrequent Subcontractor B67A RO/DI Service 067A LOTO out lighting circuit so vendor can replace UV lamps.  
LP-2673 09-13-2016 11:41 AM 09-14-2016 Cota, David Del Monte Electric B 85 Fire alarm-EM357A1A7A1A B 85 Replace existing duct detectors with new  
LP-2672 09-13-2016 09:26 AM 09-13-2016 rcvelasco@lbl.gov Emerson Reliability Services (Vertiv) Grizzly Sub 3 Year Maintenance 036A To perform the following at the SW-A1 Line 1 Utility PT's:
- Visual inspection and investigation 
- Perform electrical testing
 
LP-2671 09-12-2016 04:56 PM 09-19-2016 Samatua, Tipasa Crouse Construction B. 84-2/3 Floor Conversion 84 Subcontractor to connect WHIPS for new office cubicle in room 203 at building 84. [SEP-13-16 Doug Burkhardt] Update panel schedule to match isolation points. 
Provide Arc Flash data in isolation points.

[SEP-14-16 Katherine Johnson] T, CB 6 shows as a spare on the panel schedule.  Should this have been CB 16? 
LP-2670 09-12-2016 09:27 AM 09-13-2016 Harding, Ari PDE FLEXLAB 2016 EOY Electrical 90X Installation of new outlets on existing circuits located on south facade of building 90X. [SEP-13-16 Doug Burkhardt] I do not have panel schedules for panels:

667A10A
667A15A
667A16A
667A21A
667A22A


[SEP-13-16 Ari Harding] Corrected Panel ID's.
LP-2669 09-12-2016 06:21 AM 09-13-2016 farrell, randy PDE EV chargers 59 Correct wiring swap at EV charger  
LP-2668 09-12-2016 06:14 AM 09-13-2016 farrell, randy PDE EV charger 50B Correct swapped wires landed at EV charger  
LP-2667 09-09-2016 04:42 PM 09-16-2016 Huebschle, Mark PDE 71 HVAC Upgrade 71 Isolation of condensate pump  for testing and  MEVAP [SEP-13-16 Doug Burkhardt] Isolation points do not match panel schedules.
Result Pages:  1  2  3  4  5  6    
Report Name *
Description
Field label
Column heading override
Justification
What does auto mean?
Fields in:

Fields to Extract:

Name for the new table:
Items in the new table are called:

When you bring additional fields into a conversion, Quick Base often finds inconsistencies. For example, say you're converting your Companies column into its own table. One company, Acme Corporation, has offices in New York, Dallas and Portland. So, when you add the City column to the conversion, Quick Base finds three different locations for Acme. A single value in the column you're converting can only match one value in any additional field. Quick Base needs you to clean up the extra cities before it can create your new table. To do so, you have one of two choices:

  • If you want to create three separate Acme records (Acme-New York, Acme-Dallas and Acme-Portland) click the Conform link at the top of the column.
  • If the dissimilar entries are mistakes (say Acme only has one office in New York and the other locations are data-entry errors) go back into your table and correct the inconsistencies—in this case, changing all locations to New York. Then try the conversion again.

Read more about converting a column into a table.

Show fields from Show fields from Show fields from a related table

We're glad you're interested in doing more with Quick Base!

Now we need to make you official before you share apps or manage your account.

Verifying your email lets you share Quick Base with others in your company.

Your work email
Your company